2012-06RESOLUTION NO. 2012-6 ENGINEERING SERVICES AGREEMENT BK1174 SUPPLEMENTAL AGREEMENT NO. 1 COUNCIL MEMBER STEWART INTRODUCED THE FOLLOWING RESO LUUION: Whereas: City of Blair and The Schemmer Associates, Inc. have previously executed a Construction Engineering Services Agreement for a transportation project for which the Local Public Agency (LPA) would like to obtain Federal funds; Whereas: City of Blair understands that it must continue to strictly follow all Federal, State and local laws, rules, regulations, policies and guidelines applicable to the funding of this Federal -aid project; and Whereas: City of Blair and The Schemmer Associates, Inc. wish to enter into a Supplemental Construction Engineering Services Agreement setting out modifications and/or additional duties and/or funding responsibilities for the Federal -aid project. Be It Resolved: by the City Council of the City of Blair that: James Realph, Mayor of the City of Blair, Nebraska is hereby authorized to sign the attached Supplemental Construction Engineering Services Agreement, Supplement No. 1 between the City of Blair and The Schemmer Associates, Inc. City of Blair is committed to providing local funds for the project as required by the Project Program Agreement and any Supplemental Project Agreements. NDOR Project Number: ENH- 89(26) NDOR Control Number: 22355 NDOR Project Description: Blair Depot in the Park COUNCILMEMBER STEWART MOVED THAT THE RESOLUTION BE ADOPTED AS READ, WHICH SAID MOTION WAS SECONDED BY COUNCIL MEMBER WOLFF. UPON ROLL CALL, COUNCILMEMBERS STEWART, SHEPARD, KEPHART, RYAN, CHRISTIANSEN, WOLFF AND JENSEN VOTING "AYE ", AND COUNCIL MEMBERS NONE VOTING "NAY ", THE MAYOR DECLARED THE FOREGOING RESOLUTION WAS PASSED AND ADOPTED THIS 13th DAY OF MARCH, 2012. CITY OF BLAIR, NEBRASKA ATTEST: BRENDA R WHEELER, CITY CLERK SEAL A ES E. REALPH, MAYOR STATE OF NEBRASKA ) ) :ss: WASHINGTON COUNTY ) BRENDA R. WHEELER, hereby certifies that she is the duly appointed, qualified and acting City Clerk of the City of Blair, Nebraska, and that the above and foregoing Resolution was passed and adopted at a regular meeting of the Mayor and City Council of said city held on the 13th day of March, 2012. R /' BRIENDA R. WHEELER, CITY CLERK CITY OF BLAIR, NEBRASKA THE SCHEMMER ASSOCIATES, INC. PROJECT NO. ENH- 89(26) CONTROL NO. 22355 BLAIR DEPOT IN THE PARK THIS AGREEMENT, made and entered into by and between the City of Blair, Nebraska, hereinafter referred to as the Local Public Agency or LPA, and The Schemmer Associates, Inc., hereinafter referred to as the "Consultant ". WITNESSETH: WHEREAS, LPA has completed or is in the process of completing plans, special provisions, and standard specifications for the letting and construction of a federal -aid transportation related project, and WHEREAS,. LPA's federal -aid project is designated as Project No. ENH- 89(26), and WHEREAS, LPA has selected Consultant from a pool of on -call consultants to furnish the project construction engineering services (hereinafter the "Services ") identified in this agreement, and WHEREAS, solely for convenience, consistency and in an attempt to obtain federal funding for the consultant services, the parties intend that this Task Order Agreement, herein after referred to as Task Order, include some of the provisions of a March, 2010 Master Agreement for on -call construction engineering services between Consultant and the State of Nebraska, Department of Roads, .and WHEREAS, LPA and Consultant wish to enter into this Task Order to specify the duties and obligations of the parties for the Services described herein, and WHEREAS, the Consultant and LPA intend that the Services provided by Consultant comply with all applicable federal -aid transportation related.program requirements, so that LPA's project will be fully eligible for federal reimbursement, and WHEREAS, the LPA and Consultant intend that this Task Order be completed in accordance with the terms and conditions of the Nebraska LPA Guidelines Manual for Federal Aid Projects; hereinafter, referred to as LPA Manual; the LPA Manual is a document approved by the Federal Highway Administration (FHWA) that sets out the requirements for local federal - aid projects to be eligible for federal reimbursement; the LPA Manual can be found in its entirety at the following web address: http: / /www.dor. state. ne. us /gov -aff /Ipa /Ipa- guidelines.pdf and WHEREAS,. Consultants primary contact person for LPA will be LPA's representative, who has been designated as being in responsible charge of the project, and who is referred to herein as RC or Responsible Charge. NOW THEREFORE, in consideration of these facts, the parties hereto agree as follows: SECTION 1. DEFINITIONS The definitions set out on the attached Exhibit "D" are hereby incorporated by reference into this Task Order as if fully set out herein. SECTION 2. NOTICE TO PROCEED AND COMPLETION The LPA will issue Consultant a written Notice -to- Proceed when LPA determines that federal funding approval has been obtained for the project, and upon State concurrence that the form of this Task Order is acceptable for federal funding eligibility. Any work or services performed by Consultant on the project prior to the date specified in the written Notice -to- Proceed is not eligible for reimbursement. The Consultant shall complete all work under this Task Order within 45 calendar days after the date of final acceptance of the project construction by the LPA. Any costs incurred by Consultant after the completion deadline are not eligible for federal funding reimbursement unless the Consultant has received an extension of time in writing from LPA and the LPA has federal funding approval for the extension of time. SECTION 3. SCOPE OF SERVICES LPA and Consultant understand that the Services provided by Consultant must be completed in accordance with all federal -aid reimbursement requirements and conditions. LPA . and Consultant agree that the Scope of Services for this Task Order will be in two parts. Part one of the Scope of Services is contained within the General Statement set. out below. Part two of the Scope of Services is set out on the document attached hereto as Exhibit "E ", entitled Scope of Services and Fee Proposal, which is hereby fully incorporated herein and made a part hereof by this reference. Exhibit "E" is the result of the following process: (1) LPA provided Consultant with a document describing the detailed proposed Scope of Services for this project (2) Consultant made necessary and appropriate proposed additions, deletions, and revisions to LPA's detailed Scope of Services document (3) LPA and Consultant together reviewed the proposed Scope of Services, the proposed revisions and negotiated the final detailed Scope of Services and Fee Proposal document, which is attached as Exhibit "E ". Project No. ENH- 89(26) -2- Control No. 22355 Blair Depot in the Park (4) On all construction projects, the Consultant shall develop an Environmental Compliance Checklist to track and record oversight of the environmental commitments. The Consultant shall develop a Proiect Commitment Checklist to track and record oversight of project specific commitments involving right of way, railroad, access, special provisions, etc. These checklists shall ve developed by and maintained by the Consultant. Consultant and LPA have agreed that Exhibit "E" sets out the Services reasonably necessary and the costs reasonably estimated for Consultant Services to adequately observe, monitor, inspect, measure, manage, document and report so that LPA's project is constructed by the contractor in compliance with the Construction Contract Documents (definition below), the Manuals (definition below), State and Federal law, rule or regulation and policy. The Consultant agrees to provide the services listed on Exhibit "E" for Project No. ENH- 89(26), Control No. 22355, in Washington County, Nebraska. General Statement: The Consultant services generally include, 'but are not limited to, project management, construction engineering, pre- construction staking, traffic control plans, conducting the preconstruction conference, staking and inspection and materials sampling and testing during project construction, monitoring environmental commitments, preparing as -built plans, progress computations, final computations, preparing contractor change orders, and work orders, and the necessary communication to insure project eligibility. The Consultant shall review and have a working knowledge of the project plans, special provisions, standard specifications (the Standard Specifications for Highway Construction of NDOR (Current Edition), change orders and all other project related contract documents for the construction of LPA's Federal -Aid project. The project plans, special provisions, standard specifications, and other contract documents are hereby incorporated by reference into this agreement, as if they were fully set forth herein, and collectively, may be referred to as the Construction Contract Documents. Consultant shall assume the duties of "Inspector ", (also referred to in the NDOR Construction Manual as "Construction Technician "); "Project Manager;" and also "Engineer" (unless the context of use of the term "Engineer" would otherwise require), as those terms are defined and duties set out in the Standard Specifications for Highway Construction (2007 Edition). Consultant shall assume that it is responsible for all duties of the "Engineer" unless notified otherwise by RC on behalf of LPA. Project No. ENH - 89(26) -3- Control No. 22355 Blair Depot in the Park Additionally, Consultant shall review and have a working knowledge of the following authoritative guides and manuals related to highway construction, materials and federal aid reimbursement: (1) NDOR Construction Manual - Current Edition (2) Materials Sampling Guide (3) Standard Methods of Tests — 2006 (4) The LPA Manual (5) The Manual on Uniform Traffic Control Devices These documents are hereby incorporated herein' reference as if fully set forth, and these documents, collectively, may be referred to as the Manuals. Unless required otherwise by the Construction Contract Documents, Consultant shall be responsible for timely completion of all applicable checklists, tests, samples, duties, requirements and provisions.of the Manuals. The Manuals will be used to determine what, when, how, the sequence, and other details of the work that must be provided by Consultant, whenever Consultant's duties in these respects are not clearly set out in the Construction Contract Documents. Consultant shall employ a sufficient D number of qualified employees on the project to adequately observe, monitor, inspect, measure, manage, document, report and carry out the other duties of this agreement, so that the project is constructed by the contractor in compliance with the Construction Contract Documents, the Manuals, State and Federal law, rule or regulation and policy. Consultant shall fulfill all contract duties of inspection, project management and construction engineering for the project in a timely manner and shall communicate regularly about the progress of the construction with the LPA, through the RC, and, when appropriate for federal funding or eligibility issues, the State representative. The Consultant shall be present at the project site when appropriate for each applicable phase of construction to inspect, observe, monitor, measure, manage, document and report on the progress•of the work or as otherwise specifically agreed to by the LPA. The parties understand that the Consultant is not responsible for the Contractor's means and methods of construction. To the extent the Construction Contract Documents and the Manuals specify sequencing of work, equipment requirements, or other construction methods, the Consultant shall keep the Owner's RC informed about the progress and quality of the portion of the work and shall advise the RC about observed or measured deficiencies in the work. Project No. ENH- 89(26) -4- Control No. 22355 Blair Depot in the Park SECTION 4. FEES AND PAYMENTS The general provisions concerning 'payment under this Task Order are set out on the attached Exhibit "F ". The following provisions also apply: A. For performance of the professional Services listed on.the attached Scope of Services and Fee Proposal for the project covered by this Task Order, the Consultant will be compensated for actual work performed up to a maximum of $94,625.39. The Consultant's compensation shall not exceed the maximum without prior written approval of the LPA. For the labor work, the Consultant shall be compensated for acceptable costs in accordance with paragraph "D" of the attached Exhibit "F ". Compensation for direct non - salary costs will be in accordance with paragraph "E" of the attached Exhibit "F ". Progress and final payments will be based on receipted invoices or certified billings and compensation will be in accordance with 48 CFR 31. B. Occasionally, the conditions of this Task Order may change. This may be due to a change in scope which may require an adjustment of costs. In order to justify the need to modify this contract, the LPA must first determine that the situation meets the following criteria: ® That the additional work is beyond the scope of services initially negotiated with Consultant; and - ® That the proposed Services are within the scope of the Request for Proposal under which Consultant was selected and contract entered into;' and ® That it is in the best interest of the LPA that the services be performed under this Task Order. Once the need for a modification has been established, a Consultant Work Order will be prepared. The Consultant Work Order has been established to provide for costs to be incurred for additional work prior to execution of a supplemental agreement. The LPA shall use the process set out below: ® Consultant Work Order.-- DR Form 250, Exhibit "G" attached hereto and hereby made a part of this agreement, shall be used to describe and provide necessary justification for the modification of the scope of services, the deliverables, the schedule, and to document the estimated total additional fee. The Work Order must be executed to provide authorization Project No. ENH- 89(26) -5- Control No. 22355 Blair Depot in the Park for the additional work and to specify when that work may begin. The Task Order will be supplemented after one or more Work Orders have been authorized and approved for funding. See Chapter 4 of the LPA Manual for the process to supplement the Task Order. Services beyond the negotiated scope of services or fee proposal performed prior to the notice to proceed date will not be eligible for payment or for reimbursement with Federal funds. SECTION 5. CONSULTANT TEAM MEMBERS The Consultant has furnished a document containing a complete list of all Consultant's personnel who could possibly be involved in providing the Services required by this Task Order, along with each person's work classification and established hourly pay or labor rate. Also noted on this document are the names of the key personnel previously identified in a separate agreement between Consultant and the State of Nebraska. A true and correct copy of this document is attached hereto as EXHIBIT "B," and is incorporated into this Task Order by this reference. The labor rates set out on Exhibit "B" shall be used for payment in this Task Order. The labor rates invoiced by the consultant will be verified through the audit process. Consultant may make changes to the list of non -key personnel so long as any employee added to the list is qualified to perform the intended work. The Consultant has also provided LPA with a document that identifies the employees from Exhibit "B" who LPA and Consultant agree will be part of the primary team for this project. The primary team is expected to be directly responsible for providing the field services for the work under this Task Order. This document shall specify the role that will be assigned to each member of the primary team. This document is attached hereto as EXHIBIT "H" and is incorporated herein by this reference. The primary.team will include at least one person identified as a key person on Exhibit "B ". During construction, the Consultant may make occasional temporary changes to the primary team. However, any permanent change to the primary team will require prior written approval from the LPA. SECTION 6. GENERAL REQUIREMENTS: A. The Consultant shall advise the LPA when it appears any Disadvantaged Business Enterprise (DBE) working on the project is in need of assistance. B. The Consultant shall make every effort to assist the Contractor or any Subcontractor in interpreting Project Plans, Special Provisions, Standard Specifications, other Construction Contract Documents., or the Manuals. Project No. ENH- 89(26) -6- Control No. 22355 Blair Depot in the Park C. The Consultant will be present at the project site or at LPA's Offices beginning on the date specified in the LPA's notice to proceed to the contractor, unless project work has not begun at the site, or, with at least 24 hours notice, at any prior date (1) when contract work begins or when materials are delivered. to the project that need to be tested, sampled or inspected to verify conformance to the requirements of the Construction Contract Documents, or (2) when requested by LPA. D. The performance of all work under this agreement will be.subject to the review and approval by the LPA, with the right of review by the State or the FHWA. E: All reports of field tests performed by the Consultant will be submitted weekly to the LPA (one copy) and the State Representative (two copies). Consultant will take appropriate action to reject or remedy the work or materials that do not conform with the contract documents. F. The Consultant shall comply with all Federal, State and local laws, rules or regulations, policies or procedures, and ordinances applicable to the work contemplated in this Task Order. G. Project time delays attributed solely to the Contractor or LPA, will constitute a basis for a request for an equivalent extension ,of time for the Consultant. The parties understand that federal reimbursement of extra compensation must be approved in advance as described in the Fees and Payments Section of this Task Order. H. The sampling and testing type, method and frequency must be completed by Consultant according to the current State of Nebraska Manuals, including the Materials Sampling Guide and the State Standard Methods of Tests (www.dor. state. ne.us), and the Construction Contract Documents, or as directed by LPA. For sampling or testing issues or situations that are not covered in the Construction Contract Documents or the Manuals, Consultant shall notify LPA, provide its advice and request that LPA decide what testing'type, method or frequency should be applied for this project. 'Any test methods* or procedures that are proposed to be used and are not covered by NDOR procedures must receive prior concurrence for use from NDOR and FHWA. SECTION 7. OWNERSHIP OF DOCUMENTS The diaries, reports, field books, shop drawings, surveys, plans, specifications, maps, computations, charts, and electronic project data and all other project documents prepared or obtained by Consultant under the Task Order are the property of the LPA. The Consultant shall deliver these documents to the LPA at the conclusion of the project for inclusion in the LPA's Project No. ENH- 89(26) -7- Control No. 22355 Blair Depot in the Park federal -aid project file. After the project is completed, if requested by Consultant, Consultant will be provided access to LPA's federal -aid project file. State acknowledges that such data may not be appropriate for use on an extension of the work covered by this agreement or on other projects. Any use of the data for any purpose other than that for which it was intended without the opportunity for Consultant to review the data and modify it if necessary for the intended purpose will be at the State's sole risk and without legal exposure or liability to Consultant. Further, Consultants' time sheets and payroll documents shall be kept in Consultants' files for at least three years after the project acceptance by FHWA. SECTION 8. PROFESSIONAL PERFORMANCE The Consultant understands that the LPA will rely on the professional training, experience, performance and ability of the Consultant. Examination by the LPA, State, or FHWA, or acceptance or use of, or acquiescence in the Consultant's work product, will not be considered to be a full and comprehensive examination and will not be considered approval of the Consultant's work product which would relieve the Consultant from liability or expense that would be connected with the Consultant's sole responsibility for the propriety and integrity of the professional work to be accomplished by the Consultant pursuant to this Task Order. The Consultant further understands that acceptance or approval of any of the work of the Consultant by the LPA or concurrence by the State /FHWA or of payment, partial or final, will not constitute a waiver of any rights of the LPA to recover from the Consultant, damages that are caused by the Consultant due to error, omission, or negligence of the Consultant in its work. That further, if due to error, omission, or negligence of the Consultant, the work product of the Consultant is found to be in error or there are omissions therein revealed during or after the construction of the project and revision, reconsideration or reworking of the Consultant's work product is necessary, the Consultant shall make such revisions without expense to the LPA. The Consultant shall respond to the notice of any errors, omissions or negligence within 24 hours and give immediate attention to necessary corrections. If the Consultant discovers errors. in its work, it shall notify the *LPA of the errors within 24 hours. Failure of the Consultant to notify the LPA will constitute a breach of this Task Order. Project No. ENH- 89(26) -8- Control No. 22355 Blair Depot in the Park SECTION 9. CHANGE OF PLAN ABANDONMENT SUSPENSION AND TERMINATION: The LPA has the absolute right to abandon, suspend or terminate the Task Order or to change the general scope.of work at any time and such action on its part will in no event be deemed a breach of this Agreement. The LPA will give the Consultant seven days written notice of such change of plan, abandonment, suspension, or termination. Any necessary change in Scope of Services shall follow the Consultant Work Order Process outlined in the Fee and Payment Section above. - If the LPA abandons the work, subtracts from the work, suspends the work or terminates the work.as presently outlined, the Consultant shall be compensated in accordance with the provisions of 48 CFR 31, provided however, that in case of suspension, abandonment, or termination for breach of this Task Order, the LPA will have the power to suspend payments, pending the Consultant's compliance with the provisions of this Task Order. Payment to Consultant will be prorated based on the percentage of work completed by the Consultant prior to abandonment or termination compared to the total amount of work contemplated by this Task Order. The ownership of all of Consultant's project documents completed or partially completed at the time of such termination or abandonment will be the property of the LPA. The Consultant shall immediately. deliver all documents to the LPA. All reports, records, results and working papers arising from the work of the Consultant will be the property of the LPA. The Consultant shall not release or make use of same for any purpose whatever without the specific written permission of the LPA. The Consultant will be compensated for any leased or rented equipment required on the project for the remaining time of a lease or rental contract up to a maximum time of thirty days from the date of written suspension or termination, less any credit the Consultant receives from the lessor, provided that the Consultant cannot utilize the equipment on another project. SECTION 10. SECTIONS INCORPORATED BY REFERENCE: For the convenience of the parties, for consistency for funding review, and in an effort to reduce the length of this agreement, LPA and Consultant agree to be bound by and hereby incorporate by this reference as if fully set forth herein, Sections 5, 6, 10 through 13 and 15 through 22 of the Master Agreement for on -call construction engineering services for LPA projects between the Nebraska Department of Roads and Consultant, dated March, 2010, with one recurring change: Project No. ENH- 89(26) -9- Control No. 22355 Blair Depot in the Park The name of LPA should be substituted in for any reference in that agreement to State, State of Nebraska, Director or the Nebraska Department of Roads, unless the context would otherwise require. The LPA and Consultant agree to meet the requirements of all incorporated provisions and represent that by signing this Task Order, they expressly certify to any required certifications contained in those provisions. Although some of the provisions of Master Agreement are incorporated herein by reference, it is understood that the Nebraska Department of Roads is not a party to this Task Order and shall have no obligations or duties under this agreement. SECTION 11. RESPONSIBILITY FOR CLAIMS AND LIABILITY (INSURANCE) The Consultant agrees to save harmless the LPA and State /FHWA from all claims and liability due to the error, omission or negligence of the Consultant or those of the Consultant's agents or employees in the performance of work under this agreement. In this connection, the Consultant shall for the life of this agreement, carry insurance as outlined in Exhibit "C to this Task Order, the requirements of which are hereby made a part of this agreement. SECTION 12. LPA CERTIFICATION By signing this agreement, I, James Realph, do hereby certify that, to the best of my knowledge, the Consultant or its representative has not been required, directly or indirectly as an express or implied condition in connection with obtaining or carrying out this agreement to: (a) employ or retain, or agree to employ or retain, any firm or person, or (b) pay or agree to pay to any firm, person, or organization, any fee, contribution, donation,'or consideration of any kind. acknowledge that this certification is to be furnished to the FHWA, upon their request, in connection with this agreement involving participation of Federal -Aid highway funds and is subject to applicable state and federal laws, both criminal and civil. SECTION 13. ALL ENCOMPASSED This instrument embodies the whole agreement of the parties. There are no promises, terms, conditions, or obligations other than contained herein, and this agreement supersedes all previous communications, representations, or other agreements or contracts between LPA and Consultant, either oral or written hereto. Project No. ENH- 89(26) _10- Control No. 22355 Blair Depot in the Park IN WITNESS WHEREOF, the parties have caused these presents to be executed by their proper officials thereunto duly authorized as of the dates below indicated. STATE OF NEBRASKA) )ss. DOUGLAS COUNTY ) After being duly sworn on oath, I-do hereby state that I am authorized to sign this Task Order for the firm. EXECUTED by the Consultant on 2 ( , 2011. THE SCHEMMER ASSOCIATES, INC. Stev ' Kathol Pr pal Subscribed and sworn to before me this o2 day of bece,h 6 eY , 2011. GENERAL NOTARY - State of Nebraska ' 441 ti„ GRACE I. STODDARD My Comm. Ezp. Aug. 9, 2012 Notary Public EXECUTED by the LPA on Dec-if fa J3 , 2011. CITY OF BLAIR James Realph Subscribed and sworn to before me this 1 3 day of 1 J ( C -ei4je 1 2011. Clerk STATE OF NEBRASKA DEPARTMENT OF ROADS Form of Agreement Approved for Federal Funding Eligibility: Date Project No. ENH- 89(26) - Control No. 22355 Blair Depot in the Park Schemmer Associates EXHIBIT "B" SHEET 1 of 2 Authority to execute contracts on behalf of firm. Responsible for corporate level, firm PR - Principal wide or branch office level policy implentation, business plan development and implementation, Vice- President or higher, lead firm resource for conflict /problem resolution, Licensed Professional Engineer in Nebraska Demonstrated competency in performing complex engineering design and senior construction inspector tasks. Manages activities of engineering design team / on -site' PM - Project construction inspection staff, including engineers & technicians. Manages Quality. Ma Manager Assurance requirements on one or more design /construction engineering projects. Provides primary communication with client on status of details of design /construction project. Resource for conflict /problem resolution. BS in engineering, construction management or related field. Competent in complex transportation engineering design tasks and construction PE - Professional inspector tasks, oversees the activities of design /field team of technicians and Engineer inspectors. Prepares /oversees preparation design /field engineering reports. Resource for conflict /problem resolution. Possesses bachelor's degree in Engineering. Licensed Professional Engineer in Nebraska. Competent in basic transportation engineering design tasks and construction Ell - Engineer Intern inspector tasks. Performs the activities of design /field technicians and inspectors. Prepares design /field engineering reports. Possesses bachelors degree in Engineering and completion of Fundamentals of Engineering (FE) Examination Performs basic transportation engineering design tasks and preparing detailed CAD Tech - CAD construction plans for transportation design projects. Assists with preparation of Designer /Technician design engineering reports. Possesses high school diploma or equivalent. Prepares detailed construction plans for transportation design projects. Prepares Drafter project displays for public information on transportation projects. Possesses high school diploma or equivalent. Prepares project correspondance, invoicing, scheduling coordination. Maintains C - Clerical document filing systems for transportation projects. Possesses high school diploma or equivalent. Directs work of a survey team, and competent in providing a work product described Survery Crew Chief under the 'Surveyor'work classification shown below. Registered as a Land Surveyor by the Nebraska State Board of Examiners for Land Surveyors. . Work effort includes gathering precise measurements to identify all physical features on a site for use in the planning, design and construction of engineering projects. Includes route surveys for transportation facilities, topographic surveys to determine the relief of a particular tract of land, and hydrographic surveys to determine the Surveyor shore and banks of bodies of water and depths of particular points. Includes the . determination of boundaries of tracts of land or the measurement of the lengths and directions of lines forming the, boundaries of the tract and the writings of descriptions of land areas for conveying purposes. Conducts field testing procedures for construction materials at roadway and bridge Insp 1- Inspector 1 construction sites. Completes related reports documenting tests performed, prepare /deliver samples to testing laboratory. ' Competency in all Field Technician tasks, conduct on -site inspections of construction methods and materials including soil placement and compaction, concrete quality, Insp 2 - Inspector 2 placement, and reinforcing steel, and masonry. Documents inspection results in SiteManager. Communicate results to construction site management. EXHIBIT "B" SHEET 1 of 2 KEY EMPLOYEE EMPLOYEE CLASSIFICATION EMPLOYEE NAME LABOR RATE PR - Principal Steve Kathol Charly Huddleston 54.47 64.03 x PM - Project Manager Doug Holle 45.16 x PE- Professional Engineer Darin Brown 34.16 PE - Professional Engineer Mark Lutjeharms 45.68 PE - Professional Engineer Ron Woracek 42,87 PE - Professional Engineer Matt Sutton 45.28 PE - Professional Engineer Brock Beran 35.37 PE - Professional Engineer Todd Cochran 42.32 PE- Professional Engineer Marie Stamm 35.14 PE- Professional Engineer Joel Rossman 44.48 CAD Tech - CAD Designer /Technician Megan Starner 14.25 Drafter C - Clerical Dawn Kirchert 14.25 C - Clerical Jill Laferriere 18.30 x Survey Crew Chief Mark'Fredrickson 36.67 Surveyor Cory Gross 28.63 Surveyor Pat Kirk 25.05 Surveyor Joe Hendricks 19.92 Surveyor James Cantrell 24.30 , Insp 1- Inspector 1 x Insp 2 - Inspector 2 Brad Elting* 25.70 Insp 2 - Inspector 2 Terry Nocita 20.36 Insp 2 - Inspector 2 Adam Sleeper 25.25 Insp 2 - Inspector 2 Jon Mooberry* 25.50 Insp 2 - Inspector 2 Don Barry 20.49 Insp 2 - Inspector 2 Mike Fortenbury 39.88 Insp 2 - Inspector 2 Rick Tighe 37.15 Insp 2 - Inspector 2 Brett Drain 25.13 Insp 2 - Inspector 2 _ Lora Klostermann 43.13 Insp 2 - Inspector 2 Heath Cutler 22,25 Insp 2 - Inspector 2 Jon Goldie 23.68 �I lulIuUi 11 iaNectU1 EXHIBIT ".B" PDV6 - HZ ' SHEET 2 of 2 Consultant agrees to: (1) Make a detailed review of its existing insurance coverage, (2) Compare that coverage to the expected scope of the work under this contract, (3) Obtain the insurance coverage that it deems necessary to fully protect Consultant from loss associated with the work. Also, Consultant shall have at a minimum the insurance described below: General Liability — Limits of at least: $ 1,000,000 Per Occurrence $ 2,000,000 General Aggregate $ 2,000,000 Completed Operations Aggregate (if applicable) $ 1,000,000 Personal /Advertising Injury ® Consultant shall be responsible for the payment of any deductibles. Coverage shall be provided by a standard form Commercial General Liability Policy covering bodily injury, property damage including loss of use, and personal injury. ® General Aggregate to apply on a Per Project Basis. • The LPA shall be named as Additional Insured on a primary and non - contributory basis including completed operations (the completed work /product) for three (3) years after the work /product is complete. • Consultant agrees to. waive its rights of recovery against the LPA. Waiver of Subrogation in favor of the LPA shall be added to, or included in, the policy. • Contractual liability coverage shall be on a broad form basis and shall not be amended by any limiting endorsements. • If work is being done near a railroad track, the 50' railroad right of way exclusion must be deleted. ® In the event that this contract provides for consultant to construct, reconstruct or produce a completed product, products and completed operations coverage in the amount provided above shall be maintained for the duration of the work, and shall be further maintained for a minimum period of five years after final acceptance and payment. Project No. ENH- 89(26) EXHIBIT "C" 3 Control No. 22355 Sheet 1 of 3 Blair Depot in the Park ® Policy shall not contain a total or absolute pollution exclusion. Coverage shall be provided for pollution exposures arising from products and completed operations (as per standard CG0001 Pollution Exclusion or equivalent). (If the standard pollution exclusion as provided by CG0001 has been amended, please refer to the following section entitled "Pollution Coverage. ") • Pollution Coverage — • In the event that the standard pollution exclusion as provided by CG0001 has been amended, coverage may be substituted with a separate Pollution Liability policy or a Professional Liability policy that includes pollution coverage in the amount of $1.0 million per occurrence or claim and $1.0 million aggregate. If coverage is provided by a "claims made" form, coverage will be maintained for three years after project completion. Any applicable deductible is the responsibility of the Consultant. Automobile Liability — Limits of at least: $ 1,000,000 CSL Per Accident ® Coverage shall apply to all Owned, Hired, and Non -Owned Autos. Workers' Compensation — Limits: Statutory coverage for the State where the project is located. Employer's Liability limits: $100,000 Each Accident $100,000 Disease — Per Person $500,000 Disease — Policy Limit ® Consultant agrees to waive its rights of recovery against the LPA. Waiver of Subrogation in favor of the LPA shall be added to, or included in, the policy Professional Liability — Limits of at least: $ 1,000,000 Per Claim and Annual Aggregate ® Coverage shalt be provided for three years after work /project completion. Electronic Data and Valuable Papers — Limits of at least: $100,000 Electronic Data Processing Data and Media $25,000 Valuable Papers Umbrella /Excess — Limits of at least: $1,000,000 Per Occurrence and Annual Aggregate • Policy shall provide liability coverage in excess of the specified Employers Liability, Commercial General Liability and Auto Liability. • The LPA, shall be an "Additional Insured ". Consultant agrees to waive its rights of recovery against the LPA. Waiver of subrogation Project No. ENH- 89(26) EXHIBIT "C" Control No. 22355 Sheet 2 of 3 Blair Depot in the Park in favor of the LPA shall be provided. Additional Requirements — ® Any insurance policy shall be written by a reputable insurance company acceptable to the LPA or with a current Best's Insurance Guide Rating of A — and Class VII or better, and authorized to do business in Nebraska. ® Evidence of such insurance coverage in effect shall be provided to the LPA in the form of an Accord certificate of insurance executed by a licensed representative of the participating insurer(s). ® For so long as insurance coverage is required under this agreement, the Consultant shall have a duty to notify the LPA and the State of Nebraska Department of Roads (State) when the Consultant knows, or has reason to believe, that any insurance coverage required under this agreement will lapse, or may be canceled or terminated. The Consultant must forward any pertinent notice of cancelation or termination to the LPA and to the State by mail (return receipt requested), hand-.delivery or facsimile transmission within 2 business days of receipt by Consultant of any such notice from an insurance carrier. Copies of notices received by the Consultant shall be sent to the LPA, in care of the LPA's Responsible Charge and to the State at the following address: Nebraska Department of Roads Construction Division — Insurance Section 1500 Highway 2, P. O. Box 94759 Lincoln, NE 68509 -4759 Facsimile No. 402 - 479 -4854 ® Failure of the owner or any other party to review, 'approve, and /or reject a certificate of insurance in whole or in part does not waive the requirements of this agreement. ® The Limits of Coverage's set forth in this document are suggested minimum limits of coverage. The suggested Limits of coverage shall not be construed to, be a limitation of the liability on the part of the consultant or any of its subconsultants /tier subconsultants. The carrying of insurance described shall in no way be interpreted as relieving the consultant, subconsultant, or tier subconsultant of any responsibility of liability under the contract. ® If there is a discrepancy of coverage between this document and any other insurance specification for this project, the greater limit or coverage requirement shall prevail. Project No. ENH- 89(26) EXHIBIT "C" Control No. 22355 Sheet 3 of 3 Blair Depot in the Park Wherever in this Task Order the following terms are used, they will have the following meaning: "CONSULTANT" means The Schemmer Associates, Inc. and any employees thereof, whose business and mailing address is 1044 N 115 Street, Suite 300, Omaha, NE 68154, and "LPA" for this agreement LPA means the City of Blair, Nebraska. In this agreement, LPA may also refer generally to a Local Public Agency. Local Public Agencies include, but are not necessarily limited to; Nebraska Cities, Villages, Counties, Political Subdivisions, Native American Tribes, and other entities or organizations found to be eligible sub recipients of federal funds for transportation projects, and "LPA MANUAL" shall mean the Nebraska Department of Roads' LPA Guidelines Manual Federal -Aid Projects, and "RESPONSIBLE CHARGE" or "RC ". shall mean LPA's representative for the project whose duties and responsibilities are identified in federal law and in the LPA Manual, and "STATE" means the Nebraska Department of Roads in Lincoln, Nebraska, its Director, or authorized representative. The State represents the United States Department of Transportation on federally funded transportation projects sponsored by a sub recipient of federal funds and any reference to the "State" in this Task . Order shall mean the State on behalf of the United States Department of Transportation. "FHWA" means the Federal Highway Administration, United States Department of Transportation, Washington, D.C. 20590, acting through its authorized representatives. "DOT" means the United States Department of Transportation, Washington, D.C. 20590, acting through its authorized representatives. Project No. ENH- 89(26) EXHIBIT "D" Control No. 22355 Sheet 1 of 2 Blair Depot in the Park "STATE REPRESENTATIVE" means an employee of the State assigned by the State to observe whether the LPA's project'meets the eligibility requirements for federal funding and to provide technical assistance when requested by the LPA, in LPAs efforts to comply with requirements for Federal -aid funded local projects. To "ABANDON" the Task Order means that the State has determined that conditions or intentions as originally existed have changed and that the Task Order as contemplated herein is to be renounced and deserted for as long in the future as can be foreseen. To "SUSPEND" the Task Order means that the State has determined that the conditions or intentions as originally existed have changed and that the Task Order as contemplated herein should be stopped on a temporary basis. This cessation will prevail until the State determines to abandon or terminate the. Task Order or to reinstate it under the conditions as defined in this Task Order. To "TERMINATE" or the "TERMINATION" of this Task Order is the cessation or quitting of this Task Order based upon action or failure of action on the part of the Consultant as defined herein and as determined by the State. A "TASK ORDER" is a separate agreement between an LPA and Consultant for Services on a specific LPA project. Project No. ENH- 89(26) EXHIBIT "D" Control No. 22355 Sheet 2 of 2 Blair Depot in the Park 11/8/11 Blair Train Depot Construction Phase Scope of Services Project No. ENH- 89(26) Control No. 22355 Project Management • Review and assign staff as appropriate for the construction phase, monitor project budget, prepare project progress reports and invoices, identify out - of -scope work prior to the work occurring. • Monitor construction progress • Review Contractors Construction Schedule Pre - Construction Meeting o Schemmer to prepare for, conduct and document the pre - construction meeting. (attended by four Schemmer employees) Weekly Progress Meetings o Schemmer to conduct construction progress meetings on a weekly basis to be attended by the civil site or building inspector. It is assumed to hold 26 weekly progress meetings during-the project. Coordination with Owner o Inspector will conduct miscellaneous coordination with Owner each week. Coordination with Contractor o Inspector will conduct miscellaneous coordination with Contractor each week. Pay Estimates o Schemmer to prepare, review and approve pay estimates in Site.Manager according to the standard specifications monthly. It is assumed 12 pay estimates will be required during the project. Certified Payroll Collection and Review o Schemmer to collect and organize the certified payrolls for the prime and subcontractors. Schemmer shall conduct spot checks on payrolls and conduct random wage interviews of contractor employees. Scope assumes 26 weeks of payrolls will be collected. Project Review and Preparation o Schemmer to review plans, prepare internal file organization structure, visit site, take pre - construction photos, etc. Page 1 Exhibit "E" 11/8/11 Civil /Site Construction Phase Services Traffic Control Plan o Schemmer to prepare a traffic control plan for the project site. For this scope, it is assumed one traffic control plan will be prepared during the project. Construction Observation o Verify the performance of the work is in general conformance with the plans and specifications o Monitor construction activities for compliance with NEPA permitting (Wetlands 404, Flood Plain, NPDES, etc.) o Complete Environmental Compliance Checklist o Review work zone traffic control devices daily during the civil /site construction except during winter shutdown period when it's assumed no traffic control is in place. o Collect and file all delivery tickets and material certifications o Review the suitability and acceptance of the material incorporated in the work o Measure and calculate quantities of pay items o Review change order or time extension request and forward to RC o Additional inspection due to change orders is not included in this scope of services. o Assume 45 trips to the site for observation. The tasks and associated work hours are based the assumption the trail inspection will take 45 days. The inspector will be on -site 1 hour per day. Shop Drawing Review o Schemmer shall review shop drawings. Construction Consultation (Coordination with designer) o The City to conduct this task. Site Manager Diaries and Daily Work Reports o Schemmer inspector shall document daily contractor activities in Site Manager as well as prepare daily diaries in Site Manager. Items include progress and activities of contractors, measured quantities, controlling operation and hours worked on the. controlling operation and other events that take place each day. Perform Material Sampling and Testing o Perform material sampling and testing in accordance with the NDOR Materials Sampling Guide Page 2 Exhibit "E" 11/8/11 • Detailed breakdown of estimated tests is included in the summary of hours for testing. • Request and place into Site Manager material certifications, test results and other certifications as required by the NDOR Materials Sampling Guide. • Assume 6 trips to -the site and 2 trips to the plant for concrete plant testing. Project Closeout o Assist RC with compiling project construction records as requested. Scope assumes no material certifications will be required for the building. Final Inspection o Conduct a final project walk- through with RC and* NDOR representative Construction Staking • Provide coordination of staking needs with Contractor. • Recover and check existing survey control used during the preliminary engineering. o Mark removal limits. • Provide rows of paving hubs at 25' intervals for trail. Stake radius points, end of returns and high and low points. • For inlets, storm pipe and culverts, consultant will stake the line and grade stakes on an offset consisting of 2 stakes of line and grade at each structure. • Assume 3 trips to the site. • All items will be staked one time. Re- staking will be considered out -of- scope. Schemmer will invoice the Owner for the re- staking and the fee for re- staking will be withheld from Contractor payment. Architectural /Building Construction Phase Services RFI Action o Architect will respond within 5 working. days of receipt of RFI. It is estimated there will be 20 RFI's during this project. Construction Work Order Directives o. Architect may issue a Work Order, signed by the RC, NDOR and FHWA, instructing the contractor to proceed with a change in the Work, for subsequent inclusion in a change order. It is estimated there will be 3 work orders during this project. Change Orders o It is estimated there will be 1 change order during this project. Page 3 Exhibit "E" 11/8/11 Mock -up approval o Review as required during Construction. Review for the limited purpose of checking for conformance with information given and the design concept expressed in the contract documents. Mock -up will be submitted to the RC for final acceptance. It is estimated there will be10 mock -ups in the project. Shop Drawing /Sample approval o Review as required during Construction. Review for the limited purpose of checking for conformance with information given and the design concept expressed in the, contract documents. Samples will be submitted to the RC for final acceptance. It is estimated the project will include 30 shop drawings or sample approvals. Site Manager Diaries and Weekly Work Reports o Schemmer building observer shall document weekly contractor activities in Site Manager as well as prepare weekly diaries in Site Manager. Items include progress and activities of contractors, controlling operation and hours worked on the controlling operation and calendar days charged each day. It is assumed 50 work reports will be input into site manager. Construction Observation • Verify the performance of'the work is in general conformance with the plans'and specifications • Review Contractor pay request for determination of building progress to develop progress payment. • Additional observation. due to change orders is not included in this scope of services. Record Drawings o The Architect will review as- constructed drawings provided by the Contractor for the Architectural /Building construction. The Architect will hand draft the drawings provided by the Contractor if necessary to produce a clean set of drawings on bond paper to serve as record drawings. While the information provided by the Contractor and incorporated by the Architect/Engineer into the record drawings will be assumed to be reliable, the Architect/Engineer will not be responsible for the accuracy of the information, nor for errors or omissions which may appear in the.record documents as a result. Post - Construction Inspection o Pre -final walkthrough /Punchlist o Architect will make visual observation of project in company with Owner, Contractor and NDOR to determine acceptance. Page 4 , Exhibit "E" / m J/)4 G @ ) 2Em 4 E2 0 =n ) /] §/ � ; / / / < or Qom='2 }/) \ } \ \ /� \2 m §M) X -4 ) o § / M « § / 2 k m § ° "y { {j ' 69 fA 69 0 \ / \0M- � $ . / \ 2 §2 0000 \y>a \ (\\\ \: w ;>u 'm « n ƒ 222�3#E& § §(( / \$ -U s3 2 §2S *]3 ,m ] �2 ®& /\ 2& q \ \/� \/� §ow (\ (7( / � k \ /\j�' \ \ \'� \ \ \` § § \ % C \ « § 2 \ Exhibit "E" 3 m 3 c N � O < N cD N 00 O O (31 cn J Co m W Cl c O O CYT w v W co 00 m 07 N O O O o rn rn N O � J N O z Z O O O C/) = C- C- ;u Zzo oz�� z om m � c m 2 : Z m M . G) m cn Ztn - iv � M c O cn � D v a u z O m O ^I =. 7 O i c) C31 Z �• < 9 w — M. 0 Ife v co 0 N 0 m 0 m V :p 9 i P 0 C n . 7 i i _ tTJ � c D Q- N � 'O O N N m II o v � - CD co '< n m fn � c C) N (D -n N C CD N 7 0 ..a , - ' Oo N O 4 " O W O W N m W W O W • --` O O O N 'a v v O N� W , 0 0 m N al Cn O O 0 0 Ut O N W co co 0 0 p� Exhibit "E" c0 0 J M M W .Na O Oo m to }a N - M c0 CO V O Cn .A oil 11111 NEESE V :p 9 i P 0 C n . 7 i i _ tTJ � c D Q- N � 'O O N N m II o v � - CD co '< n m fn � c C) N (D -n N C CD N 7 0 ..a , - ' Oo N O 4 " O W O W N m W W O W • --` O O O N 'a v v O N� W , 0 0 m N al Cn O O 0 0 Ut O N W co co 0 0 p� Exhibit "E" c0 0 J M M W .Na O Oo m to }a N - M c0 CO V O Cn .A gags EXHIBIT v'Fvv The followinq requirements will apply to each' Task Order with the LPA: A. For performance of the work as outlined in this Task Order, the consultant will be compensated for actual work performed up to a maximum of $94,625.39. "" The Consultant's compensation shall not exceed this maximum without prior written approval of the LPA. For the labor work, the Consultant shall be compensated for acceptable costs in accordance with paragraph "D" of this section. Compensation for direct non - salary costs will be in accordance with paragraph "E" of this section. B. The Consultant shall not receive reimbursement for any costs incurred by the Consultant prior to the Notice -to- Proceed date or after the completion deadline date stated in the Task Order with the LPA. C. Progress and final payments will be based on receipted invoices or certified billings and compensation will be in accordance with 48 CFR 31. Final payment will be based on an audit to be performed by the State at the conclusion of the work. D. Acceptable Costs: Under this Task Order, the acceptable costs will consist of the wages, overhead costs, and a Fee for Profit for employees' time they are working directly on the project. (1) Wages are defined as the actual hours an employee works directly on the project multiplied by the established labor rates, as shown on Exhibit "B" (a) Time records The hours charged to the project must be supported by adequate time distribution records. The records must clearly indicate the distribution of hours to all activities on a daily basis for the entire pay period, and there must be a system in place to ensure that time charged to each activity is accurate. (b) Hourly Rates: The hourly rates.to be used in this Task Order shall be the rates set out in Exhibit "B ". (c) Annual adjustments: The hourly rates and personnel list for this Task Order may be reviewed and adjusted annually beginning one (1) year after full execution of the Master Agreement. Adjustment to the hourly rates and personnel list will be accomplished by a supplemental agreement to the Master Agreement. These adjusted rates and personnel lists shall be used for future Task Orders Project No. ENH- 89(26) EXHIBIT "F" Control No. 22355 Sheet 1 of 5 Blair Depot in the Park but shall not be used to amend previously executed Task Orders. (2) Overhead Costs include indirect salary costs, indirect non - salary costs, and direct salary additives that are allowable in accordance with 48 CFR 31. Overhead costs are to be allocated to the project as a percentage of direct labor costs (wages). The Consultant will be allowed to charge the project using its actual allowable overhead rate for the year the project labor was incurred. Overhead rate increases which occur during the project period will not be cause for an increase in the maximum amount established in paragraph A of this Exhibit. When an audit is performed by the State at the completion of the work, the actual allowable overhead rate for the year the project labor was incurred will be applied to the direct labor costs (wages) for that year. 'If a particular year's actual overhead has not yet been computed or approved by the State, the most recent years' accepted rate will be applied. The audit may result in additional funds'due the Consultant or a cost due from the Consultant to the State. (3) Fee for Profit is calculated by multiplying the sum of the wages and overhead costs billed by the negotiated fee for profit rate of "12.90 % ". The consultant will be paid a "fee for profit" for only the services completed at the time the services are fulfilled. E. Direct Non - Salary Costs Charges in this category include actual allowable expenses for personnel away from their base of permanent assignment, communication costs, document reproduction and printing costs, computer charges, special equipment and materials required for the project, special insurance premiums if required solely for this Task Order, and such other similar items. A non -salary cost cannot be.,charged as a direct cost and also be included in the Consultant's overhead rate. If, for reasons of practicality, the consultant is treating a direct non - salary cost category, in its entirety, as an overhead cost, then costs from that category are not eligible to be billed to this project as a direct expense. Payment for. eligible direct non - salary costs must be made on receipted invoices whenever possible, or on certified billings of the Consultant. For purposes of standardization on this Task Order, the following expenses will be reimbursed at actual costs, not to exceed the rates as shown below. Project No. ENH- 89(26) EXHIBIT "F" Control No. 22355 Sheet 2 of 5 Blair Depot in the Park (a) The reimbursement for vehicle mileage associated with the use of company owned vehicles shall be the prevailing standard rate as established by the Internal Revenue Service (IRS) through its Revenue Procedures. For vehicle mileage associated with the use of a privately owned vehicle (POV), reimbursement is limited to the lesser of: 1) The mileage rate which the consultant reimbursed to the person who submitted the claim for POV use,. or 2) The prevailing standard rate as established by the IRS. (b) Automobile Rentals and Air Fare will be actual reasonable cost giving the State all discounts. (c) The reimbursement for meal and lodging rates shall be the prevailing standard rate as indicated in the current website address for U.S. General Services Administration's (GSA) rates which is indicated below: http: / /www.gsa,gov /portal /category /100120 (1) For the Consultant and its employees to be eligible for the meal allowance, the following criteria must be met. Breakfast: (a) Employee is required to depart at or before 6:30 a.m., or (b) Employee is on overnight travel. Lunch: (a) Employee must be on overnight travel. No reimbursement for same day travel. (b) Employee is required to leave for overnight travel at or before 11:00 a.m., or (c) Employee returns from overnight travel at or after 2:00 p.m. Dinner: (a) Employee returns from overnight travel or work location at or after 7:00 p.m., or (b) Employee is on overnight travel. Meals are not eligible for reimbursement if the employee eats within 20 miles of the headquarters town of the employee. The Consultant shall note the actual lodging and meal costs in a daily diary, expense report, or on the individual's time report along with the Project No. ENH- 89(26) EXHIBIT "F" Control No. 22355 Sheet 3 of 5 Blair Depot in the Park time of departure to the project and time of return to the headquarters town. The total daily meal costs must not exceed the rate indicated in (c) above. When requested by LPA or State, the Consultant.will provide a copy of the meal receipts. F. The Consultant shall, submit invoices to the LPA at a minimum of monthly intervals and in accordance with the "LPA Procedure for Processing Invoices" located on the State's webpage at: www. transportation. nebraska .gov /qov- aff /downloads.htm The invoices must present acceptable direct labor, actual overhead, actual direct non - salary costs, as well as fee for profit. The invoices must identify each employee by name and classification, the hours worked, and each individual's acceptable labor cost applying the labor rates stated in Exhibit "B ". - Direct non - salary expenses must be itemized and provide a complete description of each item billed. See LPA Guidelines Manual for Federal -Aid projects, Chapter 13, Section 13.3, paragraph 4, for additional requirements. Each monthly invoice must be substantiated by a progress report which is to include /address, as a minimum: 1. A description of the work completed for that period 2. A description of the. work anticipated for the next pay period 3.. Information needed from LPA 4. Percent of work completed to date 5. A completed "Cost Breakdown Form" which is located on the State's webpage at www. transportation .nebraska.gov /rfp If the Consultant does not submit a monthly invoice, it shall submit its progress report monthly. H. The State, on behalf of LPA, will make every effort to pay the Consultant within 30 days of receipt of the Consultant's invoices. Payments are dependent upon whether the - monthly progress reports provide adequate substantiation for the work and whether the State determines that the work submitted is satisfactory. Upon determination that the work Was. adequately substantiated and satisfactory, payment will be made in the amount of 95 percent of the billed actual costs. The final 5% will be paid upon completion of the work required under this Task Order, acceptance by the LPA and State, and a final audit of all invoiced amounts. has been completed by the State or its authorized representative. The Consultant Project No. ENH- 89(26) EXHIBIT "F" Control No. 22355 Sheet 4 of 5 Blair Depot in the Park agrees to reimburse the State for any overpayments discovered by the State or its authorized representative. The acceptance by the Consultant of the final payment will constitute and operate as a release to the LPA and State for all claims and liability to the Consultant, its representatives, and assigns, for any and all things done, furnished, or relating to the services rendered by or in connection. with the Master Agreement or any part thereof. I. The Consultant shall maintain all books, documents, papers, accounting records, and other evidence pertaining to costs incurred and .shall make such materials available for examination at its office at all reasonable times during the agreement period and for three years from the date of final project acceptance by FHWA under this agreement. Such materials must be available for inspection by the State, FHWA, or any authorized representative of the federal government, and copies thereof shall be furnished by the Consultant, when requesfed. Project No. ENH- 89(26) EXHIBIT "F" Control No. 22355 Sheet 5 of 5 Blair Depot in the Park Co nsultant r rer (Local Projects) Project No.: Control No.: Consultant: (Name and Representative) Agreement No.: Work Order No.: LPA: (Name and Representative) Constr. Change Order No.: (If applicable) All parties agree the following described work needs to be performed by the consultant as part of the referenced project. All parties concur and hereby give notice to proceed based on the following: justification to modify contract, scope of services, deliverables, schedule, and estimated total fee. All other terms of existing agreements between the parties are still in effect. It is understood by all parties that the work described herein will become part of a future supplement to the agreement indicated above. Justification to modify agreement: (Include scope of services, deliverables, and schedule) Work Title Summary of Fee A. Total Direct Labor Cost B. Overhead (Factor * x A) C. A+13 D. Profit/Fee (Factor ** x C) _ *Overhead Factor: % E. Direct Non -Labor Cost * *Profit/Fee Factor: % F. Subconsultant Services - Total Fee Notes: TOTAL FEE: C+ D + E + F ❑ ESTIMATED TOTAL FEE: ❑ FINAL TOTAL FEE: Work Order Authorization — May be granted by email and attached to this document. Consultant: LPA: Name Signature Date Name z�ignarure UCIV LPD PC (for Preliminary Engineering) and State Rep. (for Construction Engineering): Notice to Proceed will be granted by _ email by LPD PC. ....................... Name - Signature Dace r FHWA Notice to Proceed Date: ............. : ............... Name Signature - Date Distribution: Consultant, LPA-RC, State Rep., FHWA, LPD PC, NDOR Agreements Engineer, Highway Funds Manager DR Form 250, October 2010 Exhibit "G" Staffing Plan PROJECT NAME - BLAIR DEPOT PROJECT NO. ENH- 89(26) CN 22355 CONSTRUCTION ENGINEERING / OBSERVATION Category Employee Rate PM - Pro'ect Manager Doug Holle $45.16 PE 1 - Professional Engineer Doug Holle $45.16 ARCH - Registered Architect John Rickert $44.14 Ins 1 - Ins ector 1 Brad Elting $25.70 Building Ins 2 - Building Inspector Mike Fortenbury $39.88 Ins 2 - Inspector 2 ACl/NDOR Certified Plant Ins ect Jon Goldie $23.68 Survey Manager Mark Fredrickson $36.67 Survey Crew Chief Pat Kirk $25.05 Survey Crew Man Don Bar $20.49 Exhibit "H" RESOLUTION NO. 2011 - 42 COUNCIL MEMBER CHRISTIANSEN INTRODUCED THE FOLLOWING RESOLUTION: WHEREAS, THE City of Blair, Nebraska is developing transportation project for which it intends to obtain Federal funds; WHEREAS, THE City of Blair, Nebraska as a sub - recipient of Federal -Aid funding is charged with the responsibility of expending said funds in accordance with Federal, State and local laws, rules, regulations, policies and guidelines applicable to the funding of the Federal -aid project; WHEREAS, THE City of Blair, Nebraska and The Schemmer Associates, Inc. wish to enter into an Engineering Services Agreement to provide Construction Engineering Services for the Federal -aid project. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF BLAIR, NEBRASKA, that James Realph, Mayor, is hereby authorized to sign the attached Engineering Services Agreement between the City of Blair and The Schemmer Associates, Inc. NDOR Project Number: ENH- 89 -(26) NDOR Control Number: 22355 NDOR Project Description: Blair Depot in the Park COUNCIL MEMBER CHRISTIANSEN MOVED THAT THE RESOLUTION BE ADOPTED AS READ, WHICH SAID MOTION WAS SECONDED BY COUNCIL MEMBER STEWART. UPON ROLL CALL, COUNCIL MEMBERS SHEPARD, STEWART, RYAN, CHRISTIANSEN, WOLFF, HALL AND JENSEN VOTING "AYE ", AND COUNCIL MEMBERS KEPHART VOTING "NAY ", THE MAYOR DECLARED THE FOREGOING RESOLUTION PASSED AND ADOPTED THIS 13TH DAY OF DECEMBER, 2011. CITY OF BLAIR, NEBRASKA ATTEST: BkENDA WHEELER, CITY CLERK (SEAL) � � % rS E. REALPH, MAYOR STATE OF NEBRASKA ) WASHINGTON COUNTY ) BRENDA R. WHEELER hereby certifies that she is the duly appointed, qualified and acting City Clerk of the City of Blair, Nebraska, and that the above and foregoing Resolution was passed and adopted at a regular meeting of the Mayor and City Council of said city held on the 13th day of December, 2011. BRENDA R. WHEELER, CITY CLERK