205_0001.jpg WASMNGTON COUNTY, STATE OF NEBRASKA
RECORDED �►h r aoia AT 2012 MAP 28 AM 10: 24
BOOK� GE(S) is � �5
OFDEEDJ EA SEMENT +«, t: -id ;'11L`S� i`;
WASHIN ='TCIH 6t?UNTY
R F C, 13 TF 0E DEFDS
This Agreement made this 2,3 day of AC -h , 2012 by and between the C t of
Blair, Nebraska, a Municipal Corporation, hereinafter referred to as "Grantor" and First Baptist
Church, hereinafter referred to as "Grantee ".
In consideration of One Dollar and other mutual covenants contained herein the Grantor
does hereby grant to the Grantee a right of way easement on the following described real estate:
Beginning 5' East of the northeast corner of Lot 4; thence Northerly a
distance of 15 feet on city right of way; thence westerly a distance of
10 feet; thence southerly a distance of 15 feet; to a point on the north
lot line of said Lot 4; 5'west of said northeast corner of said Lot 4 all
in Block 59
for the sole purpose of constructing a handrail meeting ADA standards along the sidewalk. No
modifications of handrail may be made without specific authorization in writing from the
Grantor consenting to such modifications. This easement shall continue until such time as the
Grantor desires to terminate same. Such termination may be with or without cause and shall be
in the sole and absolute discretion of the Grantor. The Grantor shall give notice in writing of
such termination not less than fifteen (15) days prior to such termination which such notice may
be given to the Grantee by regular United States mail, postage prepaid. In the event and at such
time of the termination of this easement, the Grantees shall remove such handrail at their own
expense. It is specifically understood and agreed that the Grantor shall not be liable to the
Grantee for any damages whatsoever upon termination of this easement. The Grantee further
hereby agrees to save harmless and indem_nif-y the Grantor from any and all claims, causes of
action, damages, injuries, or any other liabilities of any nature or kind whatsoever, which may
arise from any reason whatsoever as a result of the construction, maintenance, and the placement
of such improvements on municipal right of way. Such indemnification and save harmless shall
apply not only to the Grantee but shall apply as well to any claims, causes of action, damages,
injuries, or any other liabilities of any nature or kind sustained by any third parties, persons, or
any other entities which such claims, or causes of action may be brought against the
municipality. Such indemnification save harmless shall apply not only to such damages and
injuries, but shall specifically include but not be limited to attorney fees and reasonable cost of
defense of any such claims. Such indemnification and save harmless shall further specifically
Recorded
General
Numerical
Photostat
3 4 2 Proofed
Scanned s._,