MS-2011-00563_0003.tif - - f
NOV ��: �i Fraorri: To: �►������1�� n. � 4
'009 INTERN' 1 L RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 treat, Blair, NE 88008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not Interfere w ith reroofing work, pl eas a Indicate compliance with the following requirements
following this reroofing j ob,
permit #:
Installation Gate:
I
YE-5 NO
The materials and methods of application used for recovering or replacing the existing �
roof covering comply with the requirements of the building code. (11907.1)
ROTECTION INSTALLED: An Ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen shoot was installed and
extends at- least from the ewe's edge to a paint at least 24 inches inside the exterior
wall line of the building, (8905.2.7.1)
STRUCTURAL_C®MPDNENTSARII SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads
ti that will be encountered during installation of the roof covering system. (8907.2)
EXISTIt4 COVERING AS EMQVE®: Existing roof covering was removed for one
of the reasons required by section 8907.3
i
NO RUSIFD METAL 013 I~LASHINO: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
FLASIJINre INSTALLED P _OPERLY: Flashing shall be reconstructed In accordance
with approved manufacturer's installation Instructions, Metal flashing to which
bituminous materials are to be adhered shall be primed prlor to installation. (8907.0)
Igr1'tfur of Pr installer ate
Signature of Permr H r pate