Loading...
CN-2011-00466_0002.tif i I 1. A site plan showing the location of the windmill. The plan should at least show the property lines and building footprint on the north half of the facility. At 48' in height, the windmill must be at least 48' from the property line and/or right -of -way. 2. We also need to know who the contractor is installing the windmill. The contractor must be registered with the City of Blair. If misc. Cargill employees are doing the installation, then one of them must be licensed with the City as a general contractor. If someone needs to register, they should speak with Brandy Petersen at city hall (402.426.4191) about the process / paperwork and fee ($60). E The permit fee is $322, which includes a $200 refundable deposit. I Phil i Phil Green Assistant City Administrator City of Blair 218 South 16th Street Blair, NE 68008 Phone: (402) 426 -6691 Fax: (402) 426 -4195 PCGreen@ci.blair.ne.us i i ( i I i II 2