SD-2011-00368_0006.tif i�
L
Brandy Petersen
From: Brandy Petersen
Sent: Thursday, September 22, 2011 3:22 PM
To: 'Pedro Vargas'
Subject: Permit
Pedro,
Total due for your permit is 174.00. I received a call from Fremont Electric stating they added the electrical for the sign
to their state permit. I am still waiting for verification on that permit from the state electrical division. Per my
supervisor you are able to go ahead with the sign once the 174.00 permit fee is paid. (The 174.00 includes a 50.00
deposit which is only refundable after our inspector final inspection and the state electrical inspector's final inspection.
i
I will be leaving the office in a half hour, but will be back in at 8:00a.m. tomorrow.
Thankyoul
Brandy
I
Il i
I
I
i
I
I I
I
i