Loading...
re-2011-00281_0003.jpg or a representative of the pre- engineered building to review the requirement of the installation of the RTU. "Field verification" of structural members, sizes and location is required. 7. Provide listings and installation instructions for appliances such as the ovens. The equipment list / r.o notes are on sheet A2.2, MEP connections are noted and shown on the MEP drawings. Is Equipment Catalog cuts required? If so, please indicate which pieces of equipment and the Tenant will have to provide those. 8. Provide a lighting plan. Show lighting energy calculations. SEE SHEET E1.1 FOR LIGHTING PLAN. PLEASE SEE ATTACHED COM -CHECK FILE SHOWING ENERGY CALCULATIONS AND COMPLIANCE. 9. Show locations of exit signs. Show backup power and exit illumination backup power. SEE SHEET E1.1 FOR EXIT SIGN AND EXIT ILLUMINATION FIXTURE LOCATIONS. EXIT SIGNS ARE CONNECTED UNSWITCHED. FIXTURE TYPE 8 TO BE CONNECTED UNSWITCHED AND PROVIDED WITH 90 MINUTE BATTERY BACK -UP AS INDICATED IN LIGHTING FIXTURE SCHEDULE ON SHEET E2.1. LIGHTING FIXTURE 1E IS TO BE CONNECTED UNSWITCHED AND PROVIDED WITH BODINE EMERGENCY BALLAST OR APPROVED EQUIVALENT AS INDICATED IN LIGHTING FIXTURE SCHEDULE ON SHEET E2.1. 10. Provide plumbing, electrical, and mechanical permit applications. PROVIDED BY CONTRACTOR Thank -you, Howard Wolfe Building Inspector City of Blair 218 South 16th Street Blair, NE 68008 Office: (402) 426 -4191 Direct: (402) 426 -6696 Fax: (402) 426 -4195 hwolfe @ci.blair.ne.us No virus found in this message. Checked by AVG - www.avg com Version: 10.0.1390 / Virus Database: 1518/3789 - Release Date: 07/26/11 * * * * * * * * ** E -mail Disclaimer * * * * * * * * ** This message from Alvine Engineering contains information intended for a specific person and use. If you are not the intended recipient you should delete this message immediately and are hereby notified that any disclosure, copying, or distribution of this message, or the taking of any action based upon it, is strictly prohibited. 3