Loading...
sd-2011-00311_0003.jpg 2/18107 Sin Re sidenti a l Unc ' a nd P 1• Existing building Beam splices to Approved flashing required occur over posts Attach to joists with non - corrosive fasteners with 1 /2" bearing Soebe nbalusters Attach ledger to existing bldg. with non - corrosive lag bolts spaced min. 16" apart. Locate bolts to penetrate rim joist or wall studs. Non - corrosive Non corrosive Non - corrosive metal joist hanger metal joist metal post/beam Conditions such as attachment to cantilevers or hanger connector veneers may require Engineer's approval Secure balusters Full depth 2x solid blocking Secure to 24" max. beam balusters to beam � l Beam splices to Beam splices to occur over posts occur over posts with 1 1 12" bearing Non - corrosive metal with 1 1 /2" bearing Non - corrosive metal post/beam connector post/beam connector 1• . 1 /2" (min.) diameter anchor bolt embedded Non- corrosive metal post anchor f� 5 7" min. into concrete pier or the equivalent 8" min. If less than 8 ", post must be decay resistive Finished rade s �c ­11 _­­_.­_. (min.) diameter pier l 3