sd-2011-00311_0003.jpg 2/18107
Sin Re sidenti a l Unc ' a nd P
1•
Existing building Beam splices to
Approved flashing required occur over posts
Attach to joists with non - corrosive fasteners with 1 /2" bearing Soebe nbalusters
Attach ledger to existing bldg.
with non - corrosive lag bolts
spaced min. 16" apart. Locate
bolts to penetrate rim joist or
wall studs.
Non - corrosive Non corrosive
Non - corrosive metal joist hanger metal joist metal post/beam
Conditions such as attachment to cantilevers or hanger connector
veneers may require Engineer's approval
Secure balusters Full depth 2x solid blocking Secure
to
24" max.
beam balusters to
beam
� l
Beam splices to Beam splices to
occur over posts occur over posts
with 1 1 12" bearing Non - corrosive metal with 1 1 /2" bearing Non - corrosive metal
post/beam connector post/beam connector
1• .
1 /2" (min.) diameter anchor bolt embedded Non- corrosive metal post anchor f� 5
7" min. into concrete pier or the equivalent
8" min. If less than 8 ", post must be decay resistive
Finished rade s
�c 11 __._.
(min.) diameter pier
l
3