Loading...
ad-2011-00214_0009.jpg 6 Administration Building — Height - 55'4" Area —183' by 53' or 9,699 sf No. of Stories — 3 Building is sprinklered Type of Construction — Structural steel framing with concrete floors on metal decking each elevated floor. Insulated metal panels for siding for three sides and a 10" thick concrete wall between this Administration building and the existing and new Fermentation buildings. The roof is built -up insulation with a membrane. Type II -B construction. 7 Exit signage and exit illumination will comply with Sections 1011 and 1006 and will be submitted later as part of the electrical work Our design will comply with the 2009 International Building Code and other than maintenance, these areas are unoccupied. We are requesting a deferral on items 2, 4 and 7 above to allow time to revise our structural steel drawings as not to impede the building permit process and progress for our concrete foundation and piling work, We would greatly appreciate your favorable review of this letter and approval of our submittal for a building permit for our concrete and piling work. Those drawings which will reflect the requested changes will be submitted as part of our structural package as soon as the drawings are completed. Item 7 will be submitted separately at a much later date as our electrical design is in progress and will not be complete before our structural re- submittal. For any questions or comments please feel free to call me at 251 -443 -2606 (direct) or 251. 454 -3618 (cell), or Mr. Robert Kilpatrick, Engineering Team Leader at the Blair plant site, at 402 - 533 -1530 (direct) or 402 - 533 -8527 (cell). Sincerely, Evonik Degussa Corporation im Kelley, P.E. Manager CSA Dept. Nebraska P.E. License No. E -13243 Attachment: Building Code Analysis, dated 6/23/2011 Revised