ad-2011-00269_0002-1.jpg PROJECT MANAGEMENT GUIDELINES — CORN MILLING Cargill Confidential Ca ^11 g PROJECT PROPOSAL TEMPLATE Revision Date: 6/21/2011 Department: Polyols Location: Blair, NE Business Unit: CHN Project Title: Polyols I/O Room Office Area Project Executive Summary: This project will create a 600 sq. ft. office space in the SE corner of the Polyols I/O Room. New office space will add 6 computer workstations. These stations will be used for a permit office, equipment commissioning, and a programming simulation computer. Existing/ Remaining Space: The rest of the area serves and will continue to serve as the Polyols instrumentation and network room, with most of the plant's IO racks and server switches. Projected Total Request: Total Funds: $ 75,500 Total Capital Cost: $ 69,500 z e Ds" s� S � 1 rl 0 L F C ( 05`� Project Scope: • Install 1 hour fire rated walls and 2 new doors to partition off the SE corner of the I/O Room • Install a Sanyo 1.5 ton ductless mini -split heat pump unit in the I/O Room office. Condensing unit will be mounted on the existing concrete slab with the I/O Room and MCC Room Condensing units (south of Utilities building). • Install a drop ceiling and six 4 lamp light fixtures. • Modify the sprinkler heads for the office addition. • Paint the remaining three walls and apply concrete coating to the floor • Install 6 total workstations - 2 will be used for issuing permits, 2 will be used for commissioning work, 1 will contain a D3 computer and 1 will contain the simulation station P: \Projects \11.polyols \IO Room Office Area \IO Room Office Area.docx Revised: 4/30/09