Loading...
cn-2011-00071_0003.tif PERMTS- TYPICAL Section 105. Building, Mechanical, Plumbing- Interior, Plumbing -Site Utilities, Grading, Demolition, Fire Sprinklers, Fire Alarms, Type I hood Fire Suppression, Medical Gas, Signs, Electrical. ADMINISTRATION- TYPICAL Section 106 Transmittal slip: Section 106. Architect/Engineer stamp: Section 106. Architect/Engineer of Record - review for general conformance. Section 106. Construction documents: Section 109. Inspections: Provide City Of Blair Approved Plans At The Site For Inspections. Inspections are required as per Section 109. City of Blair Inspections are required regardless of who else is doing inspections such as Special Inspectors or Engineers. Suspended Ceiling grids, Pole and Wall Sign construction details, and Light pole footings are also required inspections. It is advisable that you call for inspection of ADA accessible walks and parking after forms are set and prior to pour or paving. A final inspection is required for all projects and is the responsibility of the permit holder to notify us on the inspection line. Section 110: Certificate of Occupancy: DEFERRED SUBMITTALS Section 106. Plans are approved pending approval of deferred submittals. Architect /engineer of record shall review the plans for general conformance and submit to The City Of Blair for review. Construction shall not commence until plans or documents have been approved. When a permit is required, construction shall not commence until the permit is i s sued. The fol items have be requested to be deferred: CG.q l L ?-� J G"V '✓ /' ✓✓�Q f/ Nf C � e y CL -7e 5 f L , tJ r - r;,�� a N5 �- �e�i4 .�pPLec�f�dw all re e-t A Fov,"' A ✓rY� 0 2 �L��►b�� �- l�+acGG����� 1°tru� -�-bs -5— S:\Building Dept\Plan Reviews \Template - Commercial Plan Review Check Policy