Loading...
cn-2011-00071_0001.tif CITY OF BLAIR COMMERCIAL PLAN REVIEW NOTICE See deferred submittal and attachment lists- included in this notice. NOTE: When there is an Architect or Engineer of Record involved in a project, their approval of deferred submittals must be submitted to The City of Blair, in writing, before we will approve the plans. Reference Section 106.3.4.2ABC06' Date of Review: 3 - - < < Edited: a 0 0 9 Architect: Contractor: Phone: Phone: Fax: Fax: Email: Email: Address: 6 S D Zw s`( L Building Description: PeLi 0 51 +60 -5 Ca w � New ✓ Addition: Alteration: Permit Number(s): C N a °' 6 0° 7 1 Occupancy and Use: Occupancy Load: Separated use (Sec. 508.3.3): Non - separated use (Sec. 508.3.2): Exits Required: Type of Construction: Area: `"� j 1 3 ` F Stories: Height: Location of Property: -1— S:\Building Dept\Plan Reviews \Template - Commercial Plan Review Check Policy