cn-2011-00071_0005.tif Re: Cargill North entry Visitors Center Please respond to the following plan review comments: 1. Double doors at conference room need to swing out. Section 1008.1.2. Corrected as shown on revised Sheet A1.1 2. Provide ventilation occupant load as per chapter 12- IBC -Show the amount of outside air per occupant per space or room. Pending final engineering drawings 3. Provide energy certification for the building envelope, mechanical system, and lighting. Pending architect's letter 4. The bottom of the ADA parking sign needs to be a minimum of 60" above the sidewalk. Section 502.6 -DOJ ADA Standards. To be addressed in the field 6. Provide fire sprinkler plans, specifications, calculations, and permit application to the city of Blair Pending drawings from sprinkler contractor 7. Provide fire alarm plans, specifications, calculations, and permit application to the City of Blair. See Attached 8. Provide mechanical and plumbing permit applications. Holcomb Heating & Air and Thompson Plumbing will have permit before they begin any work. 9. List required Special Inspections as per Chapter 17 -IBC. Who is doing the Special Inspections? Item addressed as per sheet S2.2 Note 1 under "Special Inspections" 10. Show the bottom of exterior footings at a minimum depth of 42" below grade. Item addressed as per sheet S2.2 note 4 under foundations and footings 11 Provide stamped engineered metal building structural plans. Under review of engineer 12. Provide stamped engineered plans for the foundation system. See Attached Changes A. sheet Al.1 and 51.1 North is now Up B. Sheets Al. 1, A2.1, A2.2, 51.1, 52.2 Added Vestibule C. Sheets A1.1, A2.2, 52.2 Man door relocated to the east same wall D. Updated Sheet 52.1 Updated details and Re numbered.