ad-2011-00142_0007.jpg C 1.0.2 All work to be scheduled and performed between loadout operations. During loadout operations, all construction operations that may interfere with truck loadout must STOP and the contractor shall maintain a safe and clean worksite. Monday at 6:00 a.m. to Wednesday at 2:00 p.m. to be considered loadout operations. Trucks will load periodically throughout the day; an average day may include two trucks loading for 40 minutes each. A loadout schedule will be established prior to the start of the project. 1.0.3 Deleted 1.1 Work By Others Work not included in this package includes: 1.1.1 Grounding 1.1.2 Piping 1.1.3 Electrical 1.1.4 Instrumentation 1.1.5 Insulation 1.1.6 Heat tracing 1.1.7 Foundation and slab work. 2 of 2