Loading...
MS-2011-00117.tif From:MCKINNIS ROOFING & SHEET METAL 402 426 2344 04/08/2011 14:56 #163 P.001/004 CITY OF BLAIR 218 S. 16TH STREET BLAIR, NEBRASKA 68008 Building Permit Application (402) 426 -4191 -Ph— MS -201 -UD117 (402)426-4195-I=AX 3Q of w, bl.1-brae k. -9 04/08/2011 bpeterse I MISC Residential April 8, 2011 LOCATIONOFIMPROVEMENT: 9495 County Rd 29, Blair, NE 68008 ARCHITECT: GENERAL McKinnis Roofing & Sheet Metal s OWNER: Lowell Kubie CONTRACTOR: 164 S '1st St 9495 Co Rd 29 Blair, NE 68008 Blair, NE 68008 }a H R [A ¢ L ffi P FY NATURE OF WORK PROPOSED USE Roofing /Soffit/Eaves /Gutters Primary Residence PROJECT NAME PERMIT EXPIRES 04/0712013 9495County Rd 29 »110408 -Roof ESTIMATED COMPLETION DATE 2011.05 -15 DESCRIPTION OF WORK Remove and Replace Asphalt shingles. Also replacing some sections of gutters. DEPOSIT PAID BY: SITE PLAN SUBMITTED: NA Contractor REScheck/COMcheckSUBMITTED: NA DEPOSIT STATUS: BUILDING PLANS SUBMITTED: NA $50 I i I 1. No work will be started before a permit is ISSUED AND POSTED. 2. For commercial permits, a set of plans for this project must be submitted to the Nebraska State Fire Marshal's Office for review. 3. Separate permits are required for electrical, plumbing, heating, ventilating and air conditioning, and septic system, 4. The undersigned owner or agent understands and acknowledges this building permit application does not constitute Issuance of this building permit. It is further understood that construction covered by this permit application shall not be commenced until a copy of a permit signed by the Building Inspector is issued. 5. The undersigned owner or agent agrees to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes /ordinances of the City of Blair and the State of Nebraska. Any omission of or misrepresentation of fact with or without the intention of the undersigned or any alteration or change from this application without approval of the Building Official, shall constitute sufficient ground for the revocation of any permit issued which was based on the approval of this appli n i Si Signature of lic n at 9 ApP i From:MCKINNIS ROOFING & SHEET METAL 402 426 2344 04/08/2011 14;56 #163 P.003I004 CODE I i SECTION R7 REROOFING R905.2.7.1 {CE_ PROTECTION An ice barrier that consists of at least two layers of undedayment cemented together or of a self - adhering polymer modified bitumen sheet, This shall be used in lieu of normal underlayment and extend from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. R907.1 Materials and methods of application used for recovering or replacing an existing roof covering shall comply with the requirements of this chapter. R907.2 The structural roof components shall be capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system, R907.3 New roof coverings shall not be installed without first removing existing roof coverings where any of the following conditions occur. J. "'Where the existing roof covering is water soaked or has deteriorated to the point that the existing roof covering is not adequate as a base for additional roofing. - Where the existing roof covering is wood shake, slate, clay, cement or asbestos cement tile, Where existing roof has two or more applications of any type of roof covering 4 or asphal #shingles, when the building �s l�catecl �n ar3area subject;' #a mdtlerate �r � v � r hail a po5iure cWN to 1~1,gwe. #903 5 ; i R907 5 Ex�sto c ash ent flm . ..... etal ed esIrarn outlets .collars mtal..counter- trlash�nn shall nat.be.rei stall where rusted. R907.6 Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metat flashin ::o with bituminous materials ere t ©` adhered�shall be primes unor to snstallatior; i i Brandy Petersen From: Diana Hagge - McKinnis Roofing [dhagge @mckinnisroofing.com] Sent: Friday, April 08, 2011 1:53 PM To: Brandy Petersen Subject: Kubie Lowell & Chana Kubie 9495 Co Rd 29 Blair, NE 68008 Remove and replace roof Asphalt shingles Also replacing some sections of gutters. 11000.00 ��av�,a Har�ge Residential Office Manager 402 - 426 -2633 office 402 - 426 -2344 fax Email: dhag_ge(u7mckinnisroofing.com Website: www.mckinnisroofin_g.com I I 1 i CITY OF BLAIR, NEBRASKA Phone 402 - 426 -4191 , I RECEIVED OF: ADDRESS t CITY, STATE, ZIP CODE t Y 1hn \ \ — V n q A THANKYOU KEEPTHIS COPY FORYOUR RECORDS. NO 28786 (.< . RECEIVED BY Pounds Printing, Blair, NE 68008 I I 1 From:MCKINNIS ROOFING & SHEET METAL 402 426 2344 04/08/2011 14:56 #163 P.002/004 CITY Of 5LAIQ i aro �fse ... ot I i i ROOF PERMIT SUPPORTING DOCUMENTS I i This supporting document includes information dealing with particular code requirements and /or roofing permit requirements. It in no way includes ALL particular j code items Also, it is your responsibility to know the 2006 International Building Corte requirements that apply to your project. Please understand this document is only designed and distributed to aid you in your roofing permit process. A copy of the International Building Code is available for your use at the Blair Public Library, I I i I have read the above disclosure and accept this building permit documentation on my own behalf assuming full responsibility as the owner /contractor for this project. r Owner /Occupant Contra do City of Blair ( !& Date I 218 South 16th Sireet ; Blair, Nebraska 68008 • 402- 426 -4191 • Fox 402 - 426.4195 E -mail cltyotbfolr @el.blair.ne.us '� "' I From:MCKINNIS ROOFING & SHEET METAL 402 426 2344 04108/2011 14:57 #163 P.0041004 i i r j ] p A O 1 4 Prom! so BUILDING PERMIT DEPOSIT AGREEMENT A $500.00 refundable deposit is being collected for any new commercial, new residential, and any additions, remodels and accessory building valued $10,400 or greater at the time of your building permit application. A $200.00 refundable deposit is being collected for any residential remodel, addition or accessory building valued under $10,000. A $50.00 refundable deposit is being collected for all misc. permits. The City reserves the right to not refund this deposit if any of the following conditions occur during the construction period: 1) Theft of water service by the plumber, owner or general contractor. 2) All permits have not been obtained. 3) All required inspections have not been obtained, 4) Occupancy occurs prior to a final inspection. 5) The project is completed without a final inspection being done. G) Storm Water Management Plan inspection not obtained. (if Required) If any or all of these situations occur during construction, you may forfeit your deposit. i I I hereby agree to the above conditions, and understand that should any or all of the above situations occur, the building permit deposit SHALL be forfeited or discounted upon the discretion of the City of Blair, Building and Inspections Department. I Contractor /Owner Contracto er City of Blair Date I