Loading...
CN-2010-00069_0004.tif i Stormwater Weekly Summary Page 1 of 2 Sbormwater Weekly Summary 45568 -000 (Blair, NE) Open deficiencies for the week of 11/13/2010.11/1 /2010 Reports: 11/13 Not Required (Not StarK 11/14 Not Requred (Not Starb4 11/15 Not Requred (Not Started) 11/16 Not Required (Not Smarted) 11/17 Submitted 11/18 Submitted 11119 Submitted (WMR) i CONSMUCRON EXIT f0 IMM November 17, 2010 Repairs Required (48 hr) 1 (1187224) Campifte IrrstaNation of oombvctlon erdt Comments: November 18, 2010 November 17, 2010 Resolution: November 18, 2010 InsiaYed rock base parking, poured concrete approach SILT FENCE Issue: November 17, 2010 Repairs Required (48 hr) H (118723A) Install sediment tenon around construction oxit. Once axlt has been c mpkibed. Comments: November 18, 2010 November 17, 2010 Resolution: November 18, 2010 Sediment fence has been installed on both On of construction exit Issue: November 17, 2010 Repairs Required (48 hr) (118721B) A*.* aN 34mks on dk town parallel to HoRy St. (Hwy 30 to East end of tsars around) Comments: November 18, 2010 November 17, 2010 Resolution: November 18, 2010 3—hooks have been adjusted so that they are burned up so they will hold water. http:// www. bldgportal. com/ STORMWATER/ Application /WeeklyReport.aspx ?SWID= eb8... 12/8/2010