re-2011-00012_0001.jpg . NOTES INDEX OF DRAWINGS GREAT PLAINS
Notes. AO.1 GENERAL REQUIREMENTS, INDEX OF DRAWINGS COMM UNICATIONS
AO.2 TECHNICAL SPECIFICATIONS N OC been A1,Q EXISTING AND DEMOLITION PLANS,KEY PLAN R
for
fire A1.1 PARTIAL FLOOR PLAN, SCHEDULES
lees for
Engineers A1.2 REFLECTED CEILING AND LIGHTING PLAN 1600 GREAT PLAINS CENTRE
e systems. A1.3 ELEC. POWER PLAN BLAIR, NEBRASKA 68008
is AI A INT. ELEVATIONS,CASEWORK,DETAILS
actors for
i provide the
late all F ILE COPY
rystems with
n electrical, L-
lcluding 'D
detection,
Items as r f/
is of the //
and ADA ADDRESS � h,3 .S F 2 o N $-F.
I. Provide
ppropriate
t °anys RFrP :ivF
and /or
i t agencies
codes. PERMIT NO:
uses an
CM :Ji- 3LAIR
��R c
It is the — D 0 0
re all new
L7 uction APPROVED
rents of all
1 remove or BUILDING
led or code
ew or PLANNING
all
FULLIC WORKS
11 be FIRS.. DEP
tructural
surface
provided
the Shop Drawinqs shall be required for the following -
le mounted
eluded for Casework APPROVAL AS A ESULT OF AN INSPECTION
es, switches) Sealants SHALL NOT BE CON TRUED TO BEAN APPR
e rated if Interior Wood Doors and Frames
Hollow Metal Doors and Frames OF A VIOLATION F THE PROVISIONS O� u .
Aluminum Doors and Frames CIODE OR OF OT ER ORDINANCES OF THIS
Ing with Acoustical Tile Ceilings JURISDICTION.
Door Hardware
Fire Protection Devices `
power and Markerboards 5cc P e N �o Q
ier prior to Draperies
odf aL .. 1 S t C6ar2
lirner and Samples shall be provided for the following:
Plastic Laminate
6F CCU __ 6 s
pow
I Carpet t A I 0 K �{ d k � �.. 6 x 3 6 1
power and Resilient Flooring YV 1 � /'\
per prior to Vinyl base �
��� �c"
ttor shall Acoustical Tile Ceilings ` � c ec r
Paint
flag and Direct Questions to the Architect, Joe Saniuk,
I generator, 402551 -3400
with
as part of Site visits shall be scheduled by the Bidders with Mr. Dave Brown,
4di.tional (402)- 533 -8920 C0 /L + f 5i9c a
to face of to Date: Thursday, 1 1 November 2010 2:00 PM CST F-0 (t Q �D Aov S,
`` Bid Location: The Architectural Offices, 4610 Dodge Street r
I!
Construction Start: Monday, 03 January 2011
ce Substantial Completion : Tuesday, 01 March 2011
ed
Heating Ventilating and Air Conditioning work will be by the owner, / = V O
additional and coordinated with the General Contractor
.td to be The Owner will accept Electrical subcontract Bids form only two (2)
system and re d Bidders, HE ARCHITECTURAL OFFICES
rea of p- approvedders Both are located in Blair, Nebraska FIFTY THIRTEEN CORPORATION dba THE ARCHITECTURAL OFFICES
required. Dick' ARCHITECTURE AND PLANNING
s Electric Dick Sederburg 1700 State St. 426 -4616 4610 DODGE STREET
I Judt Electric Derek Judt 190 Colfax St. 426 -5770
Ming OMAHA, NEBRASKA 68132
aes. General Contractor and their subcontractors will shall park in the off Phone. 402 - 551 -3400
street lot north of Great Plains , On Front Street, West of the United
ide new or States Post office and east of the Lumber yard. See Key Plan on sheet Fax. 402 - 551 -8331
Iblies of the A1. www.thearchitecturaloffices.com
eet code.
of all
ling fire
the project COPYRIGHT 2010
provide a Fifty Thirteen Corp. dba The Architectural Offices expressly reserves it
common law copyright and other property rights in the plans. These
plans are not to be reproduced, changed or copied in any form or
manner whatsoever, nor are they to be assigned to any third party,
without first obtaining the expressed written permission and consent of
The Architectural Offices.
These drawings may have been reproduced at a size different than
originally drawn. Owner and Architect assume no responsibility for use
of incorrect scale. Contractor shall verify all existing conditions prior to
proceeding with construction and notify Architect immediately of any
discrepancy or conflicts.
ISSUE DATE DESCRIPTION
1 270CT10 CON. DOCS