Loading...
re-2011-00012_0001.jpg . NOTES INDEX OF DRAWINGS GREAT PLAINS Notes. AO.1 GENERAL REQUIREMENTS, INDEX OF DRAWINGS COMM UNICATIONS AO.2 TECHNICAL SPECIFICATIONS N OC been A1,Q EXISTING AND DEMOLITION PLANS,KEY PLAN R for fire A1.1 PARTIAL FLOOR PLAN, SCHEDULES lees for Engineers A1.2 REFLECTED CEILING AND LIGHTING PLAN 1600 GREAT PLAINS CENTRE e systems. A1.3 ELEC. POWER PLAN BLAIR, NEBRASKA 68008 is AI A INT. ELEVATIONS,CASEWORK,DETAILS actors for i provide the late all F ILE COPY rystems with n electrical, L- lcluding 'D detection, Items as r f/ is of the // and ADA ADDRESS � h,3 .S F 2 o N $-F. I. Provide ppropriate t °anys RFrP :ivF and /or i t agencies codes. PERMIT NO: uses an CM :Ji- 3LAIR ��R c It is the — D 0 0 re all new L7 uction APPROVED rents of all 1 remove or BUILDING led or code ew or PLANNING all FULLIC WORKS 11 be FIRS.. DEP tructural surface provided the Shop Drawinqs shall be required for the following - le mounted eluded for Casework APPROVAL AS A ESULT OF AN INSPECTION es, switches) Sealants SHALL NOT BE CON TRUED TO BEAN APPR e rated if Interior Wood Doors and Frames Hollow Metal Doors and Frames OF A VIOLATION F THE PROVISIONS O� u . Aluminum Doors and Frames CIODE OR OF OT ER ORDINANCES OF THIS Ing with Acoustical Tile Ceilings JURISDICTION. Door Hardware Fire Protection Devices ` power and Markerboards 5cc P e N �o Q ier prior to Draperies odf aL .. 1 S t C6ar2 lirner and Samples shall be provided for the following: Plastic Laminate 6F CCU __ 6 s pow I Carpet t A I 0 K �{ d k � �.. 6 x 3 6 1 power and Resilient Flooring YV 1 � /'\ per prior to Vinyl base � ��� �c" ttor shall Acoustical Tile Ceilings ` � c ec r Paint flag and Direct Questions to the Architect, Joe Saniuk, I generator, 402551 -3400 with as part of Site visits shall be scheduled by the Bidders with Mr. Dave Brown, 4di.tional (402)- 533 -8920 C0 /L + f 5i9c a to face of to Date: Thursday, 1 1 November 2010 2:00 PM CST F-0 (t Q �D Aov S, `` Bid Location: The Architectural Offices, 4610 Dodge Street r I! Construction Start: Monday, 03 January 2011 ce Substantial Completion : Tuesday, 01 March 2011 ed Heating Ventilating and Air Conditioning work will be by the owner, / = V O additional and coordinated with the General Contractor .td to be The Owner will accept Electrical subcontract Bids form only two (2) system and re d Bidders, HE ARCHITECTURAL OFFICES rea of p- approvedders Both are located in Blair, Nebraska FIFTY THIRTEEN CORPORATION dba THE ARCHITECTURAL OFFICES required. Dick' ARCHITECTURE AND PLANNING s Electric Dick Sederburg 1700 State St. 426 -4616 4610 DODGE STREET I Judt Electric Derek Judt 190 Colfax St. 426 -5770 Ming OMAHA, NEBRASKA 68132 aes. General Contractor and their subcontractors will shall park in the off Phone. 402 - 551 -3400 street lot north of Great Plains , On Front Street, West of the United ide new or States Post office and east of the Lumber yard. See Key Plan on sheet Fax. 402 - 551 -8331 Iblies of the A1. www.thearchitecturaloffices.com eet code. of all ling fire the project COPYRIGHT 2010 provide a Fifty Thirteen Corp. dba The Architectural Offices expressly reserves it common law copyright and other property rights in the plans. These plans are not to be reproduced, changed or copied in any form or manner whatsoever, nor are they to be assigned to any third party, without first obtaining the expressed written permission and consent of The Architectural Offices. These drawings may have been reproduced at a size different than originally drawn. Owner and Architect assume no responsibility for use of incorrect scale. Contractor shall verify all existing conditions prior to proceeding with construction and notify Architect immediately of any discrepancy or conflicts. ISSUE DATE DESCRIPTION 1 270CT10 CON. DOCS