Loading...
CN-2010-00053_0001 (3).tif CITY OF BLAIR 218 S. 16TH STREET BLAIR, NEBRASKA 68008 B uilding Permit Application (402)426 -4191 -Phone (402) 426 -4195 - FAX CN 2010 - 00053 A1 0n Ise of °` www.blairnebraska.org 08/18/2010 COM -NEW Industrial October 19, 2010 "3 LOCATION OF IMPROVEMENT: 600 S 1st St, Blair, NE 68008 ARCHITECT: GENERAL NNE Phamaplan !' OWNER: Novozymes CONTRACTOR: 7868 -B Us70 Business Hwy W PO Box 388 Clayton, NC 27520 21 l Blair, NE 68008 Y I ..._ NATURE OF WORK PROPOSED USE New Construction HV Substation PROJECT NAME PERMIT EXPIRES 0410412011 i 600S1stSt- 100818 -New Commercial ESTIMATED COMPLETION DATE 2011 -02 -28 I DESCRIPTION OF WORK j i HV Substation (HV= High Voltage) Building 14,370 sq ft. Plumbing and Heating i i DEPOSIT PAID BY: SITE PLAN SUBMITTED: Received Contractor j REScheck /COMcheck SUBMITTED: Received DEPOSIT STATUS: BUILDING PLANS SUBMITTED: Received N/A j I I I P I3 1. No work will be started before a permit is ISSUED AND POSTED. 2. For commercial permits, a set of plans for this project must be submitted to the Nebraska State Fire Marshal's Office for review. 3. Separate permits are required for electrical, plumbing, heating, ventilating and air conditioning, and septic system. 4. The undersigned owner or agent understands and acknowledges this building permit application does not constitute issuance of this building permit. It is further understood that construction covered by this permit application shall not be commenced until a copy of a permit signed by the Building Inspector is issued. 5. The undersigned owner or agent agrees to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes /ordinances of the City of Blair and the State of Nebraska. Any omission of or misrepresentation of fact with or without the intention of the undersigned or any alteration or change from this application without approval of the Building Official, shall constitute sufficient ground for the revocation of any permit issued which was based on the approval of this apRli ation. v� E-C ICS' Signature of Applicant Date I