Loading...
cn-2010-00158_0007.jpg B 11f 1 pharmaplan RECEIVE-r CITY Oi Section 1704.13 Special Cases: Tie -backs NEB Rf''SKc 1. Construction materials and systems that are alternatives to materials and systems prescribed by this code - periodic visual inspections 2. Unusual design applications of materials described in this code, and 3. Materials and systems required to be installed in accordance with additional manufacturer's instructions that prescribe requirements not contained in this code or in standards referenced by this code - periodic visual inspections The daily reports prepared by the Special Inspections technicians will be reviewed and approved by Terracon Consultants, Inc. and distributed to NNE Pharmaplan construction management, Novozymes project management, CBI, and Zachry Engineering project management, as well as interested contractors and suppliers. All non - compliance or deviation reports will be boldly marked, as well as the remediation reports for each. Each non - compliance report WILL be addressed, remediated to the satisfaction of the Engineer of Record, and recorded. Terracon Consultants, Inc. will prepare the final report and certification that all inspections have been performed, and that the construction has been performed in accordance with the approved drawings. The record copy of the Testing and Inspections reports for the City of Blair will be maintained at the project site, will be readily available for your review, and will be transmitted to the City with the final reports and certifications upon completion of the project, or at your request. End of Statement Should you have any questions or comments, please do not hesitate to contact me. Best Regards, Chris Holmes Construction Manager, Project Management NNE Pharmaplan 7868 -B US Hwy 70 West, Clayton, NC 27520, USA Mobile: +1 (919) 699 -1747 Email: ciho @nne harmaplan,com