cn-2010-00158_0005.jpg nne pharmaplanT) 22 October 2010 Mr. Howard Wolfe City of Blair 218 South 16 Street Blair, Nebraska 68008 Re: Novozymes Loading Dock Design Documents Novozymes has contracted with Zachry Engineering for the engineering and design of their dock at the CBI facility in Blair. Novozymes has contracted with Terracon Consultants, Inc. for the Structural Tests and Special Inspections in accordance with the IBC, chapter 17. The dock itself consists of sheet piling in the river, bearing on the bedrock below, which acts as a retaining wall for fill material to provide a level area to the river's edge. This bulkhead is restrained with tiebacks to counteract the lateral loads. A reinforced concrete pad atop the backfill functions as a driveway for the truck traffic during the unloading of barges to prevent rutting and erosion. The structural design was performed using empirical data from previous foundation designs performed at the adjacent Cargill campus and other projects on or near the Missouri River flood plain, as well as a soil report from Terracon from another adjacent project. We believe that this meets the requirements of Section 1802.1, with the exceptions allowed under Section 1802.2. Without the exception, all requirements are still met, given that the provisions of sections of 1802.2 through 1802.6.4 were provided by Terracon, and sections 1802.6.5 through 1802.6.9 were incorporated directly into the drawings by Zachry. Should you have any questions or comments, please do not hesitate to contact me. Best Regards, Chris Holmes Construction Manager, Project Management NNE Pharmaplan 7868 -B US Hwy 70 West, Clayton, NC 27520, USA Mobile: +1 (919) 699 -1747 Email: ciho @nnepharmaplan.com