Loading...
cn-2010-00158_0004.tif Howard Wolfe From: Howard Wolfe Sent: Monday, October 18, 2010 3:34 PM To: 'chris00holmes @hotmail.com; 'brad' Cc: Howard Wolfe Subject: RE: special inspections for the dock installation I had also requested a copy of the Soils Investigation report. Please send. Section 1701 of The International Building Code requires the Special Inspector to be employed by the owner, design professional, or the owners agent, not the contractor. You may proceed, when you are ready, with the earthwork and piles at your own risk. The soils report and calc's. Will be needed to continue the plan review process. We will need the permit issued before any more construction takes place. Thank -you, Howard Wolfe. From: Brad Lundquist jmailto:gethmannCa)huntel.net] Sent: Monday, October 18, 2010 12:45 PM To: Howard Wolfe Cc: 'CIHO (Chris Holmes)'; barngy @gethmann.com Subject: special inspections for the dock installation Howard, Statement of Special Inspections Contractor: Gethmann Construction Project: dock at the Missouri River Location: 550 Marina Dr, Blair We recognize that it is a city of Blair requirement to have special inspection performed for such things as pile driving and deep foundations. Gethmann Construction has contracted, through Novozymes, for Terracon to 1.observe pile driving 2.inspect reinforcing steel 3.sample structural concrete We have requested for Zachry Engineering to send us the structural calculations and will forward the information as soon as it is received. When will we be able to proceed with respect to the city permit? Brad Lundquist Gethmann Construction 402 - 201 -3881 1