Loading...
cn--2010-00052_0001.tif Howard Wolfe From: Howard Wolfe Sent: Monday, August 23, 2010 4:30 PM To: 'Christopher Holmes' Cc: Howard Wolfe Subject: Air Compressor Building - Novozymes -8 -23- 2010 -Plan review comments Attachments: image001.png Date: 8 -23 -2010 Re: Novozymes Air Compressor Building plan review comments Chris: Here's what we need to finish the review on the Air compressor Building: 1. Provide the HVAC General Design Notes sheet. It is missing from the set. 2. Show on the Special inspections notes that High Strength bolts are a required inspection. 3. Show the locations of portable fire extinguishers on the plans. 4. Provide energy calculations and show R- values of insulation. 5. Do the exterior lights provide at least one foot - candle of light for the exit discharge system? Howard Wolfe Building Inspector City of Blair 218 South 16th Street Blair, NE 68008 Office: (402) 426 -4191 Direct: (402) 426 -6696 Fax: (402) 426 -4195 hwolfe @ci.blair.ne.us i I i i I 1 I