13381.tifAugust 5, 2010
McCaig Construction Inc.
1070 James Dr
Blair NE 68008
RE: Final inspections for Building Permits #13381 & 13382 -New Residential, 1363 &
1379 Linden Dr., Blair Nebraska
Dear Mr. McCaig,
On July 26, 2010, Howard Wolfe and Kris Robinson did final inspections at the
above locations; however, these inspections failed. Please note that these projects must
be completed for a re- inspection on or before September 1, 2010. Failure to comply
could result in forfeit of both of your $500.00 deposits.
If you have any questions, feel free to contact either Brandy Petersen or myself.
Thank you in advance for your cooperation in this matter.
Sincerely,
Brenda Wheeler'
City Clerk
Enc
do-
CIS Of bLAIIZ2
A copy of the inspection slips are enclosed for your reference.
218 South 16th Street • Blair, Nebraska 68008 • 402 - 426 -4191 • Fax 402 - 426 -4195 • E -mail cifyofblair @ci.blair.ne,us oo>o