Loading...
BP13496Application for Permit Fee $40 + Issuance Fee $25 + $50 Deposit Fee $115.00 Egress Window (floor plan drawing required) Fences (plot plan required) Gazebos (plot plan required) Patios /Driveways /Sidewalks (new or replacement) Roof! ng/SidIng/Soffit and /or Eave Repair /Gutters Swimming Pools with Fence (plot plan required) Window /Door Replacement (size change only) Miscellaneous Building Permits (items not covered by one of the above) Description: Utility Excavation and Curb Grinding Curb Grind Fee: $75 plus bond Length Utility Excavation Length Lin. Ft.; Width Lin. Ft Type: Water ; Sewer ; Other PROJECT INFORMATION: Contractor: R f)( - (A \S aW, + i ( -- 1 c Phone #: 4n1 -- 1q2 Address: 2LL P CA (-f� IS-Y - Cell #: c Amount of Bond Posted: Bond Check # (Curb grind - $9.00 per Lin. Ft.; Utility Excavation - $6.00 per Sq. Ft.) PERMIT RENEWAL FEE: This fee is based on the amount of the original permit fee and is charged when work is not completed within two years and the permit expires. Renewals will only be allowed with the stipulation that all exterior site work and outside finish work is completed and interior life - safety issues have been properly address. Permit renewals are for one (1) year, with a maximum of two (2) renewals for a maximum permit span of four (4) years. Original valuation of $0- $50,000 $150.00 $ Original valuation of $50,000 - $100,000 $200.00 $ Original valuation of $100,000 - $500,000 $300.00 $ Original valuation of $500,000 or more $400.00 $ Issuance Fee: $ 25.00 Deposit: $ 50.00 Total Renewal Remit Fee = Permit Fee + Deposit + Issuance Fee $ Separate permits are required for electrical, plumbing, hearting, ventilating and air conditioning, and septic systems. By my signature below, I acknowledge this building permit application does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of a permit signed by the Building Inspector. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes /ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days or is not completed within two (2) years of date of issue. 7 , :, 7 - 3 /0 s" nature f Owner /Contractor Date For Office Use Only WHEN PROPERLY VALIDATED,,(BELOW) THIS IS YOUR PERMIT Date Permit Paid: A - d1'j Receipt # 77 v - 2 �-, Approved by: CITY OF BLAIR, NEBRASKA Phone 402-426-4191 RECEIVED OR 4-1 ADDRESS CITY STATE, ZIP CODE THANK YOU eKEEP THIS COPY FOR YOUR RECORDS. NO RECEIVED BY Pounds Printing, Blair, NE 68008 Parcel & Address Ownership Parcels BookPage 517 - 559 C alcArea 0.192704 Dissolve Shape Polygon Legal = BC LOT 6 & PT OF 'SAC BT BLIP 63 113 PC B Mail 1000 Mail2 d 912 PHEASANT CIF MaiIB BLAIR, NE OB3ECTID 24003 C� OBJECTI 1 86648 Owner r ADAMSON, DONALD C & NEVA G TRUSTEES OwnID $ 10044 Parc elID 89004555 ParcelIdenkiky 89004555 ParcelType i Single Owner Parcel PICA ;890045556 Problems PropClass 1000 PropType - REB Shape Area 8394.166605 Shape Length ; 411, $7363 Bitus 1871 ' GRANT BT BLA TransLevel B Zipcocle 68008 -0000 Friday, Jul 23, 2010 03:39 PM r'vunl BUILDING PERMIT DEPOSIT AGREEMENT A $500.00 refundable deposit is being collected for any new commercial, new residential, and any additions, remodels and accessory building valued $10,000 or greater at the time of your building permit application. A $200.00 refundable deposit is being collected for any residential remodel, addition or accessory building valued under $10,000. A $50.00 refundable deposit is being collected for all misc. permits. The City reserves the right to not refund this deposit if any of the following conditions occur during the construction period: 1) Theft of water service by the plumber, owner or general contractor. 2) All permits have not been obtained. 3) All required inspections have not been obtained. 4) Occupancy occurs prior to a final inspection. 5) The project is completed without a final inspection being done. 6) Storm Water Management Plan inspection not obtained. (If Required) If any or all of these situations occur during construction, you may forfeit your deposit. I hereby agree to the above conditions, and understand that should any or all of the above situations occur, the building permit deposit SHALL be forfeited or discounted upon the discretion of the City of Blair, Building and Inspections Department. ,r o r ctor /Owner Contractor /Owner City of Blair Dam CITY OF 5tAIQ ROOF PERMIT SUPPORTING DOCUMENTS This supporting document includes information dealing with particular code requirements and /or roofing permit requirements. it in no way includes ALL particular code items. Also, it is your responsibility to Know the 2006 International Building Code requirements that apply to your project. Please understand this document is only designed and distributed to aid you in your roofing permit process. A copy of the International Building Code is available for your use at the Blair Public Library. I have read the above disclosure and accept this building permit documentation on my own behalf assuming full responsibility as the owner /contractor for this project. ner/ ccupant City of Blair Contractor Date 218 South 16th Street • Blair, Nebraska 68008 • 402 - 426 -4191 • Fax 402 - 426 -4195 • E-mail cityofblair @ci,blair,ne.us