BP13335I pl��
1
EPX
11/12/2009 1 M 11027 -09
Christopher Holmes
NNE Pharmaplan
7868 -B US 70 Bus. Hwy West
Clayton, NC 27520
(919) 699 -1747
Novozymes Blair, Inc. Chiller Building NDK
600 S. First Street
Blair 68008-
Your items have been reviewed for compliance with the Nebraska State Fire Marshal Act.
Final Architectural Plan New Building
REMARKS:
Approved as submitted.
cc. District B
Page 1 of 2
PLEASE CONTACT OFFICE INDICATED BELOW FOR A FINAL INSPECTION.
FINAL ObI.SITE APPROVAL IS REQUIRED PRIOR TO OCCUPANCY OR USE.
SIGNED:
Jim Kennev
Reviewed By: Main Office Contact for Inspection: District B
246 South 14th Street 438 W Market
Lincoln, NE 68508 -1804 Albion NE 68620 -1241
(402) 471 -2027 (402) 395 -2164
11/12/2009 1 M 11027 -09
Christopher Holmes
NNE Pharmaplan
7868 -B US 70 Bus. Hwy West
Clayton, NC 27520-
(919) 699 -1747
e -D
Novozymes Blair, Inc. Chiller Building NDK
600 S. First Street
Blair 68008-
Your items have been reviewed for compliance with the Nebraska State Fire Marshal Act.
Final Architectural Plan New Building
Alt Phone: Email: CIHO @nnepharmaplan.com
Occupancy Type: Industrial Construction Type: Type 11 -B 8,675 SF
Estimated Start Date: 4/13/2010 Estimated Completion Date: 12/1/2010
Fire Protection Features:
Sprinkler Total ❑ Spinkler Partial ❑ Range Hood System ❑ Sprinkler Other:
Fire Alarm Manual Sys. ❑ Smoke Detection ❑d Heat Detection ❑ Fire Alarm Other:
Page 2 of 2
PLEASE CONTACT OFFICE INDICATED BELOW FOR A FINAL INSPECTION.
FINAL OUSITE APPROVAL IS REQUIRED PRIOR TO OCCUPANCY OR USE.
SIGNED:
Jim Kenney
Reviewed By: Main Office
246 South 14th Street
Lincoln, NE 68508 -1804
(402) 471 -2027
Contact for Inspection: District B
438 W Market
Albion NE 68620 -1241
(402) 395 -2164
- "TT
JDL)ILDING INSPECTIO REPORT
CITY OF BLAIR ❑ WASHINGTON COUNTY ❑ OTHER
LOCATION OF INSPECTION
-
NAME OFOWNER 91A CONTRACTOR
/7
-
DATE INSPECTION REQUESTED Ll- TIME INSPECTION REQUESTED: PERMIT NO
TYPE OF INSPECTION REQUESTED: EICONFERENCE
❑ STATUS CHECK
BUILDING: TOOTING F DECK FOOTING E:l FRAMING E:l DRYWALL E:l FINAL kPARTIAL
PASSED
FAILED
COMMENTS: T b- ec
❑
UTILITIES: ❑ SEWER TAP ❑ SEWER ❑ 'PTic F] WATER TAP ❑ REMOTE ❑ WATER SERVICE
PASSED
FAILED
FT4,ARTIAL
COMMENTS:
ELECTRICAL: ❑ ROUGH INT FINAL ❑ PERMANENT SERVICE ❑ TEMPORARY SERVICE ❑ PRECONNECT
PASSED
FAILED
❑ PARTIAL
1
F
COMMENTS:
MECHANICAL: ❑ ROUGH IN ❑ A/C ❑ FURNACE ❑ RADIANT HEAT F1 FINAL F1 PARTIAL
PASSED
FAILED
F
❑
COMMENTS:
PLUMBING: ❑ GROUNDWORK F ROUGH-IN ❑ FINAL ❑ WATER METER INSTALLED ❑ PARTIAL
PASSED
FAILED
F] PRESSURE TEST
El
El
COMMENTS:
[_1 OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED
NOTES/REMARKS C L_L_ Vs cc,� w &io
0
0 0
F
IN 7- SPECTOR - ell _,/ DATE OF INSPECTION MADE: -1 to
FAXED OPPD\BURT REA TO CONNECT SERVICE: O N
DATE OF INSPECTION MADE: 4 - 18 - ( O 7(Mg_�
)NNECT SERVICE:
I
1,46