Loading...
BP13379CITY OF BLAIR — APPLICATION FOR BUILDING PERMIT w .gpromize° p Permit # �'_-2 f -1i Date: �" a;2 Approximate Completion Date: a' Site Plan Attached: ✓ REScheck Attached: Complete Plans Attached �- Application for: Residential Commercial/Industrial ✓ New Construction Manufactured Home Modular Move -on: Home Accessory Building Other Remodel Addition Accessory Building: Garage Pole Barn Other Floor Type: Dirt Concrete Electricity: Yes No Sign Erecting, Awnings Decks/Handicap Ramps (plot plan required) Satellite Dishes/Radio Antenna/Cell Towers (plot pian required) Other Utilities: Public Water: Yes No Private Well If yes, responsible entity: Blair OPPD Line Kennard Agreement needed: Date Agreement Received: Public Sewer: Yes No Septic Drawing Provided: If yes, responsible entity: Blair Kennard County Road Permit Required: Yes No Submitted: Yes No Additional Description of project if necessary. Project Information: Job Address: a) Cy / -<,,- XV 947049 / 7& Legal. Description (if applicable) Owner: Address: Z d") g sr � Phone#: Contractor: /� /u G�/L�r Phone #: - Address: Email Address for Contractor: ezll o 6 Al cfE' /ate . c%acv Separate permits are required for electrical, plumbing, hearting, ventilating and air conditioning, and septic systems. By my signature below, I acknowledge this building permit application does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of a permit signed by the Building Inspector. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes/ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within a or is not completed withi two years of date of issue. l Signature of wner/Contractor Date For Building Permits other than One & Two Family Residential Structures: I hereby acknowledge and agree that I have/will submit a set of plans for this project to the Nebraska State Fire Marshal's Office for R Signature of Owner/Contractor Date ZONING REVIEW: Zoning/Flood Plain/Utilities: Current Zoning: Conditional Use Permit Required: Yes No Date CUP Approved: State Fire Marshal Required: Yes No Variance Required: Yes No Minimum Setbacks: Front Second Front I Side Side Rear Lot Square Footage: Length x Width: Lot Coverage % Driveways/Sidewalks: Sidewalk required: Yes No Sidewalk Waiver: Yes No Date Waiver Approved: Preexisting Garage requires driveway to be less than 3' from property line: Approved by: Flood Plain: Yes No If yes, specify special requirements: BUILDING INSPECTOR REVIEW: Number of Stories One Two Three Four jype of Residential Structure: Ranch Two Story Split Entry _ Rooms Bedrooms Bathrooms Egress in Basement: Required: Yes Yes >Four High Rise (>75 ft) Raised Ranch Other Fireplaces Gas Electric No Provided on Plans: Yes No Sleeping Rooms Living Area Other Egress Square Footage: Main Level: Second Level: Third Level Basement: (Unfinished) (Finished) Garage: 2 bay 3 bay 4 bay Detached Garage: Pole Barn: Addition: Remodel: Porch: Front Rear Side Deck that affect setbacks: Rear Front Side 5+ bay Occupancv Classification: Assembly, theaters, with stage Assembly, theater, without stage Assembly, nightclubs Assembly, restaurants, bars, banquet halls Assembly, churches Assembly, arenas Assembly, general, community halls, libraries, museums Business Educational Factory and industrial, moderate hazard Factory and industrial, low hazard High Hazard, explosives (section continued on next page) High Hazard HPM Institutional, supervised environment Institutional, incapacitated Institutional, restrained Institutional, day care facilities Mercantile Residential, hotels Residential, multiple family Residential, one- and two-family Residential, care/assisted living facilities Storage, moderate hazard Storage, low hazard Utility, miscellaneous _ Is building reauired to be protected by automatic fire sprinkler system?" No Only partially in some areas or rooms Please Specify Yes If yes, the standard to which the sprinkler system will be designed: NFPA 13 NFPS 13R NFPA 13D Driveway Grade: 20% grade or less? Yes No (Dale will review new residential construction. Al will review all second access requests and industrial and commercial driveway requests) Required Off Street Parking: Permit Fee Calculation: Building Permit Deposit Fee: Commercial, new homes and residential additions/remodels/accessory buildings valued $10,000 or greater $ Fee - $500.00 Residential additions/remodels/accessory buildings valued under $10,000 $ Fee = $200.00 All other permits Fee = $50.00 $ RESIDENTIAL - NEW CONSTRUCTION: Permit fee is: Finished sq/ft area X $92 (not including finished basement area) Finished basement sq/ft area X$56 Unfinished basement sq/ft area X $29 Garage sq/ft area X$25 Total Valuation: Total Valuation Issuance Fee: Multiplied by 0.006 = $ 25.00 Total Permit Fee = Deposit + Permit Fee + Issuance Fee $- RESIDENTIAL - ADDITIONS / REMODELS and COMMERCIAL - NEW CONSTRUCTION / ADDITIONS / REMODELS: Business/Industrial/Educational/Assembly/Factory/Storage/Utility *Porches with roofs/screened patios are considered additions Construction valuation computation: Sq/ft area X $63 Except for the following: Accesso!y Buildings & Interior Remodeling Projects: sq/ft area X $43 Pole barns with no hard surface floor: sq/ft area X $25 Sign Erecting/Awnings and Decks/Handicap Ramps: sq/ft area X $25 (Minimum valuation of $2000) Construction valuation computation: Finished sq/ft area e d X $ $ 1. �� �� Construction valuation is ...................................Permit fee is: $0 TO$50 ...........................................................$0 $51 TO $500 ........................................................ $25 $501 TO $2,000 ........................................................ $25 + $3 per additional $100 $2,001 TO $25,000 $25,001 TO $50,000 ........................................................ $70 ......................................................$370 +$13 +$10 per additional $1,000 per additional $1,000 $50,001 TO $100,000 ......................................................$620 + $7 per additional $1,000 $100,001 TO $500,000 ......................................................$970 + $5 per additional $1,000 $500,001 TO$1,000,000 ..................................................$2,970 + $4 per additional $1,000 $1,000,001 AND OVER .................................................. $4,970 + $3 per additional $1,000 Permit Fee calculated from chart above $ CO3 b,5q . q Issuance Fee: $ 25.00 �r Total Permit Fee = Deposit + Permit Fee + Issuance Fee $ r11 Additional Comments: Approved by: IL1644k Date' f Contingent On Approval by Fire Marshall Meet IBC, IPC, IMC and NEC Code Requirements Sleeping Rooms below Story and in Basement required to have egress For Office Use Only Date Permit Paid: Permit Fee: Deposit Amount Receipt # Deposit Paid by for return to: Building Inspection Pouch given: Yes No CITY OF BLAIR, NEBRASKA Phone 402-426-4191 RECEIVED OF: v ADDRESS CITY, STATE, ZIP CODE j, r•l vinl.- BUILDING PERMIT DEPOSIT AGREEMENT A $500.00 refundable deposit is being collected for any new commercial, new residential, and any additions, remodels and accessory building valued $10,000 or greater at the time of your building permit application. A $200.00 refundable deposit is being collected for any residential remodel, addition or accessory building valued under $10,000. A $50.00 refundable deposit is being collected for all misc. permits. The City reserves the right to not refund this deposit if any of the following conditions occur during the construction period: 1) Theft of water service by the plumber, owner or general contractor. 2) All permits have not been obtained. 3) All required inspections have not been obtained. 4) Occupancy occurs prior to a final inspection. 5) The project is completed without a final inspection being done. 6) Storm Water Management Plan inspection not obtained. (If Required) If any or all of these situations occur during construction, you may forfeit your deposit. hereby agree to the above conditions, and understand that should any or all of the above situations occur, the building permit deposit SHALL be forfeited or discounted upon the discretion of the City of Blair, Building and Inspections Department. UC oq �Lfv Date Contractor/Owner i Ci of lair bro�/se of a`�a\` CITY Of BLAIQ BUILDING PERMIT SUPPORTING DOCUMENTS This building permit packet includes various items dealing with particular code requirements and/or building permit requirements. It in no way includes ALL particular code items. Also, it is your responsibility to know the 2006 International Building Code requirements that apply to your project. Please understand this packet is only designed and distributed to aid you in your building permit process. A copy of the International Building Code is available for your use at the Blair Public Library. I have read the above disclosure and accept this building permit documentation on my own behalf assuming full responsibility as the owner/contractor for this project. Owner/Occupant City of Blair QLi'- "/ - Contractor QV JL)L IL2 Date 218 South 16th Street • Blair, Nebraska 68008 • 402-426-4191 • Fax 402-426-4195 • E-mail cityofblair@ci.blair,ne.us ]BUILDING INSPECTION REPORT, ;CITY OF BLAIR ❑ WASHINGTON COUNTY IZ ❑ OTHE 7, LOCATION OF INSPECTION - NAME OF OWNER ° ` f <• CONTRACTOR: DATE INSPECTION REQUESTED Lfl TIME INSPECTION REQUESTED -_. r PERMIT NO TYPE OF INSPECTION REQUESTED: ❑ CONFERENCE ❑ STATUS CHECK BUILDING: ❑ FOOTING ❑ DECK FOOTING ❑ FRAMING ❑ DRYWALL ❑ FINAL ❑ PARTIAL PASSED FAILED COMMENTS: ❑ UTILITIES: ❑ SEWER TAP ❑ SEWER ❑ SEPTIC ❑ WATER TAP ❑ REMOTE ❑ WATER SERVICE PASSED FAILED ❑ PARTIAL El ElCOMMENTS: ELECTRICAL: ❑ ROUGH IN ❑ FINAL ❑ PERMANENT SERVICE ❑ TEMPORARY SERVICE ❑ PRECONNECT PASSED FAILED F1 PARTIAL ❑ F1COMMENTS: MECHANICAL: ❑ ROUGH -IN ❑ A/C ❑ FURNACE ❑ RADIANT HEAT ❑ FINAL ❑ PARTIAL PASSED FAILED ❑ ❑ COMMENTS: PLUMBING: ❑ GROUNDWORK ❑ ROUGH -IN ❑ FINAL ❑ WATER METER INSTALLED ❑ PARTIAL PASSED FAILED F-1 PRESSURETEST E] ElCOMMENTS: ❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED INSPECTOR•_�__� DATE OF INSPECTION MADE: CJ I o FAXED OPPD\BURT REA TO CONNECT SERVICE: ON BY J 37� IMR tp �. Nq• IIM I W *I n 4/27/2010 1 M 04027-10 Christopher Holmes NNE Pharmaplan 3005 Carrington Mill Blvd, Suite 380 Morrisville, NC 27560- (919) 699-1747 NEBRASKA STATE FIRE MARSHAL ; PLANS DIVISION `�� ����s Code Review Jfl ti lis Novozymes Blair C - Mixing Building NEM 600 S First Street W Blair 68008 - Your items have been reviewed for compliance with the Nebraska State Fire Marshal Act. 0 • 6".11=9111111M. 0 • • . -11"...-H - "11111101 Final Architectural Plan New Building REMARKS: Approved as submitted. Return postage is not provided. Please contact this office within 10 days if you intend to pick up plans or send return postage. If contact is not made, plans will be discarded after 10 days. Alt Phone: Occupancy Type: Industrial Estimated Start Date: 4/28/2010 Fire Protection Features: Email: CIHO@nnepharmaptan.com Construction Type: Type II -A 8,300 SF Estimated Completion Date: 2/20/2011 Sprinkler Total Spinkler Partial ❑ Range Hood System ❑ Sprinkler Other: Fire Alarm Manual Sys. ❑ Smoke Detection Fv-1 Heat Detection ❑ Fire Alarm Other: Page I of 1 PLEASE CONTACT OFFICE INDICATED BELOW FOR A FINAL INSPECTION. FINAL ONSITE APPROVAL IS REQUIRED PRIOR TO OCCUPANCY OR USE. Reviewed By: Main Office 246 South 14th Street Lincoln, NE 68508-1804 (402) 471-2027 David Autry Contact for Inspection: District B 438 W Market Albion NE 68620-1241 (402) 395-2164 BUILDING INSPECTION REPORT, ❑--CITY OF BLAIR ❑ WASHINGTON COUNTY ❑ OTHE 1 o. LOCATION OF INSPECTION NAME OF OWNER CONTRALTO', _ 1> DATE INSPECTION REQUESTED -} c TIME INSPECTION REQUESTED i„ PERMIT NO y TYPE OF INSPECTION REQUESTED: ❑ CONFERENCE ❑ STATUS CHECK BUILDING: ❑ FOOTING ❑ DECK FOOTING] ❑ FRAMING 1:1 DRYWALLS ❑ FINAL ❑ PARTIAL PASSED FAILED COMMENTS: k` / MVV r ` l �� I d�✓d (/ WWATER ❑ UTILITIES: ❑ SEWER TAP ❑ SEWER ❑ SEPTIC ❑ TAP ❑ REMOTE ❑ WATER SERVICE PASSED FAILED ❑ PARTIAL ❑ ❑ COMMENTS: ELECTRICAL: ❑ ROUGH IN ❑ FINAL ❑ PERMANENT SERVICE ❑ TEMPORARY SERVICE ❑ PRECONNECT PASSED FAILED ❑ PARTIAL ❑ ❑ COMMENTS: MECHANICAL: ❑ ROUGH -IN ❑ COMMENTS: ❑ RADIANT HEAT ❑ FINAL ❑ PARTIAL PASSED FAILED ❑ ❑ PLUMBING: ❑ GROUNDWORK ❑ ROUGH -IN; ❑ FINAL ❑ WATER METER INSTALLED ❑ PARTIAL PASSED FAILED ❑ PRESSURE TEST ❑ ❑ COMMENTS: ❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED INSPECTOR: _ DATE OF INSPECTION MADE: �(J TIME FAXED OPPDIBURT REA TO CONNECT SERVICE: ON BY I 'plH I N U 1 .0 --al -0,"CITY OF BLAIR ❑ WASHINGTON COUNTY ❑ OTHER LOCATION OF INSPECTION ' � 4 NAME OF OWNER• p � Y CONTRACTOR• DATE INSPECTION REQUESTED t w .; s' -° °� �� IME INSPECTION REQUESTED ° ` 3 0' PERMIT NO- O , TYPE OF INSPECTION REQUESTED: ❑ CONFERENCE TYPE ❑ STATUS CHECK BUILDING: ❑ FOOTING ❑ DECKFOOTING ❑ FRAMING ❑ DRYWALL ❑ FINAL ❑ PARTIALS tPASSED FAILED { El COMMENTS tr 9 t.0 t /,i :�, , x UTILITIES: ❑ SEWER TAP ❑ SEWER ❑ SEPTIC ❑ WATER TAP ❑ REMOTE ❑ WATER SERVICE PASSED FAILED ❑ PARTIAL ❑ ❑ COMMENTS: ELECTRICAL: ❑ ROUGH IN ❑ FINAL ❑ PERMANENT SERVICE ❑ TEMPORARY SERVICE ❑ PRECONNECT PASSED FAILED ❑ PARTIAL ❑ ❑ COMMENTS: MECHANICAL: ❑ ROUGH -IN❑ A/C El FURNACE ❑ RADIANT HEAT ❑ FINALS❑ PARTIAL PASSED FAILED ❑ ❑ } COMMENTS: PLUMBING: ❑ GROUNDWORK ❑ ROUGH -IN ❑ FINAL ❑ WATER METER INSTALLED ❑ PARTIAL PASSED FAILED ❑ PRESSURE TEST ❑ ❑ COMMENTS: ❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED ® 'A Rr® NOTES/REMARKS: INSPECTOR. �� DATE OF INSPECTION MADE: �` 7- c TIMF. Z.47 FAXED OPPD\BURT REA TO CONNECT SERVICE: ON BY CITY OF BLAIR ❑ WASHINGTON COUNTY ❑ OTHER p ter` �..' r LOCATION OF INSPECTION: t.` L L ,' ',,(,Vi b`„'., NAME OF OWNER " ��; -� � ' CONTRACTOR- - ' d ' '' '� " DATE INSPECTION REQUESTED: �� _` F TIME INSPECTION REQUESTED_ e� PERMIT N0 ; TYPE OF INSPECTION REQUESTED: ❑ CONFERENCE ❑ STATUS CHECK BUILDING: ❑„ FOOTING F] DECKFOOTING [:1FRAMING [IDRYWALL ❑ FINAL ❑ PARTIAL ASSED FAILED COMMENTS:w✓" ❑ UTILITIES: ❑ SEWER TAP ❑ SEWER ❑ SEPTIC ❑ WATER TAP ❑ REMOTE ❑ WATER SERVICE ❑ PARTIAL COMMENTS: ELECTRICAL: ❑ ROUGH IN ❑ FINAL ❑ PERMANENT SERVICE ❑ TEMPORARY SERVICE ❑ PRECONNECT ❑ PARTIAL COMMENTS: MECHANICAL: ❑ ROUGH -IN ❑ A/C ❑ FURNACE ❑ RADIANT HEAT ❑ FINAL ❑ PARTIAL COMMENTS PLUMBING: ❑ GROUNDWORK ❑ ROUGH -IN ❑ FINAL ❑ WATER METER INSTALLED ❑ PARTIAL ❑ PRESSURE TEST COMMENTS: ❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED NOTES/REMARKS- C 1i✓IZi9%C QtJ 133 L4 5 PASSED FAILED ❑ ❑ PASSED FAILED ❑ ❑ PASSED FAILED ❑ ❑ PASSED FAILED ❑ ❑ INSPECTOR �+� il�� DATE OF INSPECTION MADE: 7r ( o TIME FAXED OPPD\BURT REA TO CONNECT SERVICE: ON BY MP6-J -" r"" 7 \\ L.y a