Loading...
BP13457CITY OF BLAIR - MISCELLANEOUS BUILDING PERMITi 'AA - Permit # % ° 7 °t '9 Promise Date: x"41 Approximate Completion Date.. r/ -3f - Site Plan Attached: Estimated Valuation of Project: 1 Obo - O° Application for: Permit Fee $40 + Issuance Fee $25 + $50 Deposit Fee: $115.00 Egress Window (floor plan drawing required) Fences (plot plan required) Gazebos (plot plan required) Patios/Driveways/Sidewalks (new or replacement) Roofing/Siding/Soffit and/or Eave Repair/Gutters Swimming Pools with Fence (plot plan required) Window/Door Replacement (size change only) Miscellaneous Building Permits (items not covered by one of the above) Description: -- Utility Excavation and Curb Grinding Fee: $75 plus bond Curb Grind Length Utility Excavation Length Lin. Ft.; Width Lin. Ft Type: Water ; Sewer ; Other Amount of Bond Posted: Bond Check # (Curb grind - $9.00 per Lin. Ft.; Utility Excavation - $6.00 per Sq. Ft.) PROJECT INFORMATION: Job Address: � /C�c,� I a.� a- VJ f IN PC Legal Description (if applicable)k wne • IF -a-12 Address: AP ��� °' � Phone#: Contractor /` c I Phone #: 5171 Address: /f415 . a #',--) Cell #: PERMIT RENEWAL FEE: This fee is based on the amount of the original permit fee and is charged when work is not completed within two years and the permit expires. Renewals will only be allowed with the stipulation that all exterior site work and outside finish work is completed and interior life - safety issues have been properly address. Permit renewals are for one (1) year, with a maximum of two (2) renewals for a maximum permit span of four (4) years. Original valuation of $0-$50,000 $150.00 $ Original valuation of $50,000 - $100,000 $200.00 $ Original valuation of $100,000 - $500,000 $300.00 $ Original valuation of $500,000 or more $400.00 $ Issuance Fee: $ 25.00 Deposit: $ 50.00 Total Renewal Remit Fee ® Permit Fee + Deposit + Issuance Fee $ Separate permits are required for electrical, plumbing, hearting, ventilating and air conditioning, and septic systems. By my signature below, I acknowledge this building permit application does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of a permit signed by the Building Inspector. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes/ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days or is not completed within two (2) years of date of issue. d IC Signature of Owner/Contractor D e For Office Use Only WHEN PROPERLY VALIDATED (BELOW) THIS IS YOUR PERMIT Date Permit Paid:Yom-_' 1 Receipt #` Approved by: �d� CITY OF BLAIR, NEBRASKA Phone 402-426-4191 THANK YOU KEEP THIS COPY FOR YOUR RECORDS. NO RECEIVED BY Pounds Printing, Blair, NE 68008 COMMENTS: F OCCUPANCY GRANTED F1 CONDITIONAL OCCUPANCY GRANTED INSPECTOR :-- DATE OF INSPECTION6- MADE: �' -� - / 0 E- & 3 0 FAXED OPPD\BURT REA TO CONNECT SERVICE: BUILDING INSPECTION REPORT CITY OF BLAIR ❑ WASHINGTON COUNTY ❑ OTHER LOCATION OF INSPECTION NAME OF OWNER', CONTRACTOR - DATE INSPECTION REQUESTED' Z TIME INSPECTION REQUESTED-- PERMIT NO TYPE OF INSPECTION REQUESTED: El CONFERENCE F1 STATUS CHECK BUILDING: F-1 FOOTING El DECK FOOTING Ej DRYWALL E:l FINAL [:] PARTIAL PASSED FAILED El COMMENTS: UTILITIES: F-1 SEWER TAP F1 SEWER F1 SEPTIC F1 WATER TAP F1 REMOTE 0 WATER SERVICE PASSED FAILED F1 PARTIAL El F-1 COMMENTS: ELECTRICAL: n ROUGH IN F1 FINAL F1 PERMANENT SERVICE 0 TEMPORARY SERVICEE] PRECONNECT PASSED FAILED El PARTIAL F-1 n COMMENTS: MECHANICAL:F-1 ROUGH -IN F1 A/C 0 FURNACE El RADIANT HEAT F1 FINAL [I PARTIAL PASSED FAILED F-1 Fl COMMENTS: PLUMBING: F-1 GROUNDWORK El ROUGH -IN El FINALE] WATER METER INSTALLED El PARTIAL PASSED FAILED F-1 PRESSURE TEST Fl F -I COMMENTS: F OCCUPANCY GRANTED F1 CONDITIONAL OCCUPANCY GRANTED INSPECTOR :-- DATE OF INSPECTION6- MADE: �' -� - / 0 E- & 3 0 FAXED OPPD\BURT REA TO CONNECT SERVICE: r' U11111 - BUILDING PERMIT DEPOSIT AGREEMENT A $500.00 refundable deposit is being collected for any new commercial, new residential, and any additions, remodels and accessory building valued $10,000 or greater at the time of your building permit application. A $200.00 refundable deposit is being collected for any residential remodel, addi ' ccessory building valued under $10,000. A $50.00 r undable deposit is being collected for all misc. permits. ity reserves the right to not refund this deposit if any of the following conditions occur during the construction period: 1) Theft -of _water_service by_the plumber,- owner or- general contractor. 2) All permits have not been obtained. 3) All required inspections have not been obtained. 4) Occupancy occurs prior to a final inspection. 5) The project is completed without a final inspection being done. 6) Storm Water Management Plan inspection not obtained. (If Required) If any or all of these situations occur during construction, you may forfeit your deposit. I hereby agree to the above conditions, and understand that should any or all of the above situations occur, the building permit deposit SHALL be forfeited or discounted upon the discretion of the City of Blair, Building and Inspections Department. Contractor/Owner Contractor/Owner City of Blair Date 06/04/2010 10:54 4023595808 R-SIDING,INC PAGE 02/02 .►A .... ... ... . 06/04/2010 10:54 4023595808 R-SIDING,INC PAGE 01/02 Jun. 4, 2010 11, 22AM CITY Of BLAI R (402,426-4191) Na. 4808 P. I city of Btslr 218 S le MMM Mir, NE 68008 Voice (402) 426.41$1 fax (402)426.4185 r- aer,.. joPM& A A i!1 �tybiYiA P'11om no C49 E3 jrMot is pox ftvkw u pkmm ftmmoat D Plow* Reply Li Plan!* 00YO o .Of ,, A% HIS Ah 44s ,Y Co 00 f 0.4 tj �� -BUILDING INSPECTION REPORT CITY OF BLAIR ❑ WASHINGTON COUNTY El OTHER LOCATION OF INSPECTION' _J-V .. . . ....... NAME OFOWNER-', CONTRACTOR - DATE INSPECTION REQUESTED TIME INSPECTION REQUESTED-- PERMIT N TYPE OF INSPECTION REQUESTED: El CONFERENCE El STATUS CHECK BUILDING: ❑ FOOTING E] DECK FOOTING Ej,-FRAMING E] DRYWALL El FINAL El PARTIAL PASSED FAILED COMMENTS: UTILITIES: ❑ SEWER TAPE] SEWER E SEPTIC El WATER TAP F1 REMOTE D WATER SERVICE PASSED FAILED F] PARTIAL F1 F� COMMENTS: ELECTRICAL: ❑ ROUGH IN El FINALE] PERMANENT SERVICE F1 TEMPORARY SERVICE El PRECONNECT PASSED FAILED El PARTIAL 1-1 El COMMENTS: MECHANICAL: 1-1 ROUGH -IN El A/C 0 FURNACE El RADIANT HEAT El FINAL F1 PARTIAL PASSED FAILED F] F] COMMENTS: PLUMBING: F -I GROUNDWORK F1 ROUGH -IN EI FINAL El WATER METER INSTALLED El PARTIAL PASSED FAILED F] PRESSURE TEST El El COMMENTS: P OCCUPANCY GRANTED El CONDITIONAL OCCUPANCY GRANTED INSPECTOR: DATE OF INSPECTION MADE: o , C) 1 FAXED OPPD\BURT REA TO CONNECT SERVICE: ON B