Loading...
BP13444CITY OF BLAIR —APPLICATION FOR BUILDING PERMIT ^.'9 Promise°po Permit# Vy Date: i' Approximate Completion Date: (� t Site Plan Attached: REScheck Attached: Complete Plans Attached Application for: Residential Commercial/Industrial New Construction Manufactured Home Modular Move -on: Home Accessory Building Other Remodel Addition Accessory Building: Garage Pole Barn Other%' Floor Type: Dirt Concrete Electricity: Yes No Sign Erecting, Awnings Decks/Handicap Ramps (plot plan required) Satellite Dishes/Radio Antenna/Cell Towers (plot plan required) Other Utilities: Public Water: Yes No Private Well If yes, responsible entity: Blair OPPD Line Kennard Agreement needed: Date Agreement Received: Public Sewer: Yes No Septic Drawing Provided: If yes, responsible entity: Blair Kennard County Road Permit Required: Yes No Submitted: Yes No Additional Description of project if necessary:° (d A , A d3 s_ , � �"e� ���� k,���. r �s.9 F � s. 4 a,� �,.1r 6 ��� x 3 _, ,v_, �s Project Information: Job Address: Legal Description (if applicable) - j /1 m 6 / Owner: Address: Phone#: Contractor Address: Email Address for Contractor: Separate permits are required for electrical, plumbing, hearting, ventilating and air conditioning, and septic systems. By my signature below, I acknowledge this building permit application does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of a permit signed by the Building Inspector. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within f> 180 d ys or is not pleted within two (2) year° ofAat of issue. _ s ign "ture of Owner/contractor Date For Building Permits other than One & Two Family Residential Structures: j,hereb acknowledg nd agree that I have/will submit a set of plans for this project to the Nebraska State Fire Marshal's Office for Revie inn ure ofOwner/C tractor _ ,y Date -e ` c 1 Phone #: 'b -� 't 1r � Cell #: Email Address for Contractor: Separate permits are required for electrical, plumbing, hearting, ventilating and air conditioning, and septic systems. By my signature below, I acknowledge this building permit application does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of a permit signed by the Building Inspector. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within f> 180 d ys or is not pleted within two (2) year° ofAat of issue. _ s ign "ture of Owner/contractor Date For Building Permits other than One & Two Family Residential Structures: j,hereb acknowledg nd agree that I have/will submit a set of plans for this project to the Nebraska State Fire Marshal's Office for Revie inn ure ofOwner/C tractor _ ,y Date ZONING REVIEW: W9T1Tr1T-�I; • • 4UF"1 limit=- Current Zoning:Conditional Use Permit Required: Yes No Date CUP Approved: State Fire Marshal Required: Yes No Variance Required: Yes No Minimum Setbacks: Front 74 Seco d Front Side Sideeae Lot Square Footage: Length x Width: Lot Coverage %'! Driveways/Sidewalks: Sidewalk required: Yes NoSidewalk Waiver: Yes No Date Waiver Approved: Preexisting Garage requires driv wa o be less than 3' from property line: Yes Approved by: Flood Plain: Yes No If yes, specify special requirements: BUILDING INSPECTOR REVIEW: Number of Stories One Two Three Four >Four High Rise (>75 ft) Type of Residential Structure: Ranch Two Story Split Entry Rooms Bedrooms Bathrooms Egress in Basement: Required: Yes No Sleeping Rooms Living Area Sauare Footage: Raised Ranch Fireplaces Other Gas Electric Provided on Plans: Yes Other Egress Hal Main Level: Second Level Third Level Basement: (Unfinished) (Finished) Garage: 2 bay 3 bay 4 bay 5+ bay Detached Garage: Pole Barn: Addition: Remodel: Porch: Front Rear Side Deck that affect setbacks: Rear Front Side Occuaancv Classification: Assembly, theaters, with stage Assembly, theater, without stage Assembly, nightclubs Assembly, restaurants, bars, banquet halls Assembly, churches Assembly, arenas Assembly, general, community halls, libraries, museums Business Educational Factory and industrial, moderate hazard Factory and industrial, low hazard High Hazard, explosives (section continued on next page) High Hazard HPM Institutional, incapacitated Institutional, day care facilities Residential, multiple family Residential, care/assisted living facilities Institutional, supervised environment Institutional, restrained Mercantile Residential, hotels Residential, one- and two-family Storage, moderate hazard Storage, low hazard Utility, miscellaneous Is building required to be protected by automatic fire sprinkler system?" No Only partially in some areas or rooms Please Specify Yes If yes, the standard to which the sprinkler system will be designed: NFPA 13 NFPS 13R NFPA 13D Driveway Grade: 20% grade or less? Yes No (Dale will review new residential construction. AI will review all second access requests and industrial and commercial driveway requests) Required Off Street Parking: Permit Fee Calculation: Building Permit Deposit Fee: Commercial, new homes and residential additions/remodels/accessory buildings valued $10,000 or greater $ Fee - $500.00 Residential additions/remodels/accessory buildings valued under $10,000 $ Fee = $200.00 All other permits Fee = $50.00 $ RESIDENTIAL - NEW CONSTRUCTION: Permit fee is: Finished sq/ft area X $92 (not including finished basement area) Finished basement sq/ft area X$56 Unfinished basement sq/ft area X $29 Garage sq/ft area X$25 Total Valuation: Total Valuation Issuance Fee: Multiplied by 0.006 = $ 25.00 Total Permit Fee = Deposit + Permit Fee + Issuance Fee $ esV—industrial/Educational/Assembly/Factory/Storage/Utility *Porches with roofs/screened patios are considered additions Construction valuation computation: Sq/ft area X $63 Except for the following: Accessory Buildings & Interior Remodeling Projects: sq/ft area X $43 Pole barns with no hard surface floor: sq/ft area X $25 Sign Erecting/Awnings and Decks/Handicap Ramps: sq/ft area X $25 (Minimum valuation of $2000) Construction valuation computation: Finished sq/ft area a gym„ x $ $ Construction valuation is ...................................Permit fee is: $0 TO$50...........................................................$0 $51 TO $500 ........................................................ $25 $501 TO $2,000........................................................$25 + $3 per additional $100 $2,001 TO $25,000........................................................ $70 + $13 per additional $1,000 $25,001 TO $50,000......................................................$370 + $10 per additional $1,000 $50,001 TO $100,000......................................................$620 + $7 per additional $1,000 $100,001 TO $500,000......................................................$970 + $5 per additional $1,000 $500,001 TO$1,000,000..................................................$2,970 + $4 per additional $1,000 $1,000,001 AND OVER..................................................$4,970 + $3 per additional $1,000 Permit Fee calculated from chart above $e3a0 Issuance Fee: $ 25.00 m m 0 Total Permit Fee = Deposit + Permit Fee + Issuance Fee $00 Additional Comments: Approved by: Date: Contingent On Approval by Fire Marshall Meet IBC, IPC, IMC and NEC Code Requirements Sleeping Rooms below Story and in Basement required to have egress For Office Use Only Date Permit Paid. Permit Fee: Deposit Amount Receipt # Deposit Paid by for return to: Building Inspection Pouch given: Yes No i��Wlffi RECEIVED OF: ADDRESS CITY, STATE, ZIPCODE THANK YOU KEEPTHIS COPY FOR YOUR RECORDS. NO RECEIVED BY Pounds Printing, Blair, NE 68008 ml u z 0 z "110 % *1 GiTy 0� BLAIR V) NEBRASKA APPROVED PLANNING ---- -- ---- FIRE DE 0 FILE Copy ADDRESS—� ?,�- S - ILP Cr ,PERMIT NO: I ml W-l—*vl`w.Xlq- OF A VIOLATION OF THE CODE OR OF OTHER OP ail �II JURISDICTION. A-1 e ell Ae). e - z �,,, �,,- ev r1l , -/,, C1111/ IMA' IN Wb,,_. =,. ! f!, • �. �r�u Component Specification (Post -in -Ground Column) Cable Truss Loadings are dependent on Truss Style specified and bay spacing 2x4 Purlins (x,24"o.c. 25 hi e �4 M Beveled f arae Purih 2x4 Lower Chord Stabilizers. w� 24 C3irts E (See chart for numb. er & spacing) MI,G Optional 4" Concrete Floor Treated Plank A= Interior Clear height (IGH) ` 1.2" Heel on spans 36' and under B = Eave he (Top of truss) 13" Heel on spans over 36' iJ = Hole depth.(including foolting) D Girt spacing E = Column iength denotes spliced column) ES `ans less tiianop e . a1 6 y �1 h . � 5'-3" 1 Mt . u .. , Note — Number of rows and standard girt spacing may be affected by such items as overhangs, insulation, wainscoting, eave lites, etc. 7'-4" 8'-4" 5'-6" 2 2'-31/2" " 14' 8'-4" 9'-4" 4'-6" 3 1'-10'/4" 14' . 9'-4" 10'-4" 5'-6" 3 2'-11/4" 16' 10'-4" 11'-4" 4'-6" 3 2'-4'/4" 16' 11'-4" 12'-4" 5'-6" 4 2'-0" 18' 12'-4" 13'-4" 4'-6" 1 4 2'-21/4" 18' 13'-4" 14'-4" 5'-6" 4 2'-41/2" 20' 14'-4" 15'-4" 4'-6" 5 2'-1" 20' 15'-4" 16'-4" 5'-6" 5 2'-3" *22' 16'-4" 17'-4" 4'-6" 5 2'-5" *22' 17'-4" 18'-4" 5'-6" 6 2'-13/4" *24' 18'-4" 19'4" 4'-6" 6 2'-31/2" *24' 19'-4" 20'-4" T-6" 6 2'-5'/4" *26' 20'-4" 21'-4" 4'-6" 7 2'-21/2" *26' Note — Number of rows and standard girt spacing may be affected by such items as overhangs, insulation, wainscoting, eave lites, etc. 7-4" 8'-7" 5'-3" 1 2 2'-41/2" 14' 8'-4" 9'-7" 4'-3" 3 1'-11" 14' 9'-4" 10'-7" 5'-3" 3 2'-2" 16' 10'-4" 11'-7" 4'-3" 3 2'-5" 16' 11'-4" 12'-7" 5'-3" 4 2'-01/2" 18' 12'-4" 13'-7" 4'-3" 4 2'-3" 18' 14'4• 15'-7" 4'-3" 5 2'-11/2" 20' 16'-4" 17'-7" 4'-3" 5 2'-51/2" *22' 17'-4" 18'-7" 5'-3" 6 2'-21/4" *24' 18'-4" 19'-7" 4'-3" 6 21-4" *24' 19'-4" 20'-7" 5'-3" 6 2'-53/4" *26' 20'-4" 21'-7" 4'-3" 7 2'-23/4" *26' Page CE -4 July 2008 � � a Z m� N U) ry O z y J }a Pa N r� X 7 N � U) N m ~ d D O -a N U m o Z �r � o Z Z m O Q N „ v W Y ZJ U U O Q O 010 O J o z Q B ti :1O Z - m O w p gg 0 ._. p J z aD7 v _ OZ j ^O O U rn tw d x ON v N O ca J O Z� w O G W LL O Z C) N , AO 9 W w O o q 2 � O O u Q Q �wU Y 7a �- O ~ ZvOQm O OQ :� Z F U � o Z o m , c' -1U m� .. t0 to _ _ i �� il min YN Of � CO k `� pa° umi f-� O � � p, p.�rn O p W _ N N �Oz O 9 x N O 3 oHN LO A Z Ln 2 CL •� t0 10 �aR V�y°�NVi (O 2v O a- O Of Z)QD lla � Z °°� ai OH -j X N x w zO o�x a N\ `r� m m�Na aNp brq kd ww ::)U ^¢ w —ZO wmau �x N ao Jed O~ m \\ Q 2 ,2 f N O I/ O oZY cn F- Z O� J U —WU �0m jW� (n m z X Z llillrillllll ® ti m _L Q m Q W O > llillllilllll p Z d h ' r z r Z w N cV unnuum A Q w 111 . Vlp V) V) p __j Z _j Z In D f- U O z J 2 Q W D H- Z w D Z W w H 0- , �. aao dzwn _ a �Qop WZ-L� f �` o JJ z :�001'z .Q� -0 a wx JO IX J�QF LL f W NZSW N ONG » W a m = U 'Fwz > w U N N w .0 Z O�4 cn Z Z O O m O N N d' cD � 00 � N N d' d' c0 � c0 t z Z � N N N N N N N N S �� trl �''� � d' 0 W Z Z0W0 "d JZ LLJ L1 U z W ILo aawaz w� �J :U= W Z Q= N N N N N N N N N N N N N N N N N ZO�m -.j Z Q w Ln Ln Ln D �O CLn Waz U Q ° z �Zm¢ QW �UwQQ zUVS U U U U Qza 2T U m Z -� l J Z = E � J J d' O co O N � a0 - � � co rn N � O Z - O F- O J � N f7 Nj '�' d' d' It F- W W C' v uJ (JIt �tnr It p J J= z�nmr e w J L —Z— to _ _ _ _ CO I� CO � � m t0 10 (0 (O 2x4 Lower Chord Stabilizer 1 60d Nail 10d Nails When lower chord stabilizer crosses truss, use (1) 60d 2) 10d Nails nail through top of LC Stab toenailed and (1) 10d nail toenailed to lower chord of truss. When lower chord stabilizers lap on truss, use (1) 60d nail through top of each LC Stab, (4) 1 O nails to tie LC Stabs together, and (2) 10d nails toenailed to lower chord of truss. 2x4 Lo at eac ,Od Nail <4 LC Stab (1) 10d Nail Girt in endwall truss (3) 10d Nails 2x4 Scrap Nailer 2x4 Lower Chord Stabilizer 10d Nails Lower chord of endwall truss Lower Chord Stabilizer Attaching to Endwall LC Stabibzer.dwg (ve)muff Elm Buildings® 3 P -'q -Ws lord Lower Chord Stabilizers are to be placed 10' o,c. MAX, unless specified otherwise on construction drawing or truss drawing, On Buildings with extra rows of lower chord stabilizers priced in, Lower Chord Stabilizers are to be placed 6' o,c. Max LCStab By: JK Lower Chord Stabilizers Date: 12-21-94 Scale: L A. Construction Manual Page: Construction ,,Da"! Date: 3/246/073 CB, Scale = 1'=3/16" Page: C O p7 L C c o O 3 a- 0 O En O O V) O Ol o a� •U d�L-+ `O C O O 0 O C L, j ~O 3 O T N N 2 7 - m F- u C U-0 O O 0 L C U C: O It F- X N -2 O C Q LLL — U OO` 7 > L Q W F- .0 r d q � m CD w "F+ N c di U °, n c io 'E5 H L T * 00 m O u Q7 0 m z A p o O m c b O � N 'tl vrn m D v .O 0 o m � ° � ° o U C O O � 1] U N C O '3 C 00 O U1 o m 0 o W �' Z rn O 0 C O v O N O L Cl od�u C —C, O k wmaw CL c T U L ° O N L O Y O O _0O . N L O °l O C L U 0 O U •� C O 3 rn O O O O C c O O L L N UI ol U C C O O N 9 cn ol C C 7 7 � L L m a N DO O O O d' N N N N O1 ol C C 'O U O 1] .O O O' I 2X4 Corner Bracing is positioned from the top of the highest 2x6 girt down to 2x8 T&G treated 2" above 100' mark on all eave heights as indicated on chart below. (4) 10d nails at each connection. *Corner Braces not required for clear heights less than 10'-4", unless otherwise specified on plans. See price book for options to add or convert to 2x6. 2x4 Corner Bracing is installed in all corner bays (8 bays per building) unless a door or window fall in that corner bay; if so, install Corner Brace in very next bay. USE THIS CHART UNLESS PLANS STATE A DIFFERENT CORNER BRACE LAYOUT. CORNER BRACING JART * Interior Clear ght (ICH) BAY 7'— 4 8 —4" 9'-4" 10'-4" 1 1'-4" 12'-4" 13'-4" 14'-4" 15'-4" 16'-4" 17'-4" 18'-4" WIDTH 7'-1" 8'-1" 9'-1" 10'-1" 11'-1" 12'-1" 13'-1" 14'-1" 15'-1" 16'-1" 17'-1" 18'-1" 6' 8' 8' 9' 10' 12' 12' 14' 14' 14' 16' 16' 18' 7' 9' 9' 10' 12' 12' 12' 14' 14' 16' 16' 16' 18' 8' 9' 10' 10' 12' 12' 14' 14' 14' 16' 16' 18' 18' 9' 10' 12' 12' 12' 14' 14' 14' 16' 16' 18' 18' 18' 10' 12' 12' 12' 14' 14' 14' 16' 16' 16' 18' 18' 20' 1 1 ' 12' 12' 14' 14' 14' 16' 16 16' 18' 18' 18' 20' 12' 14' 14' 14' 14' 16' 16' 16' 18' 18' 18' 20' 20' Comer Braeing.dwg MW EVAVEW Buildings® View: eorbrace Drawn By: MjW Origin Date: 03-07-95 Revision Date: 4/5/01 AW 48 Scale = V=1/4" Corner Bracing Construction Manual Page: Construction D tail Packet Page: 2nd Refer to Floor Plan for number of Jack Braces Required. Jack Bracing is not needed on Buildings with Ceilings or Ceiling Runners SII Column sion Nail 2x4 to top of 2x6 w/ (1) 10d Nail every 16" 2x4 Scrap Steel Banding (3) 16d Nails toenoiled (4) 16d Nails Top chord of first > interior truss— A Sidewall Column A�� ?x6 •V• Endwall Truss dwall Column Ext. 2x4 & 2x6 Jack Brace —, ( ) Material List 2x4 2x6 Len the rit fQ ID X Y Z 8' 1 1 9' 1 4' 1 R 1 R' 20' Scale: 7 V Construction Manual Scale 6 16d Nails X i Steel Bonding: Use scrap an shipped as strapping. Extend banding 18" down jack bracing & to edge of top chord of truss. Nail w/ (6) 1 1/4" stormguards along top 2x4 of jack bracing & top chord of truss. J3Ck BT1C171� Ile: F:\...\Jack Bracing.dwg View: Jack Wick Drawn By; RR 0 n„IIr•___� OrioinDate: vi -i1 -VV 6UIIU1111�5- Revision Date: Page: Construction Detail Paclzet Page: � W H rTT a m O') D d � W rWii v W00 Q a c� W m W -J d Z 5 ro Q M .9 00 o 0 0 Y W d < o CD z Q m O Q o m O O 0.l ,o z� Oo 0.�C', O Y dp oFl It, Q 00 m 16 'CO, J =� vJ Oa0 h� N Q W W p v d h LLJ m O F— coo Li 'mN b o tWO D U u7mau� �z m O W N O t- 2 H O LLJ U) J � ou p. W O Q d w ® "2 O ZN OQ O N -� W � L W J z F W c�7 O g � N z N 1 W W Y 0 O 0 �0 ` m Q W N azN W L!1 Q Q W v cn N G� O N 0 -,o U1 x00m w U1 o � m q IN V � 2 Z- (2) 2X4X8" — TREATED BLOCK W/(3) 1 O ' _ 4" BUILDING SPECS TRUSS RAFTER COLUMN — ROW TRUSS (2) 1/2' BOLT HEIGHT 2—P TR S LENGTH HIGH SID GIRTS 1\ \ (4) 16D NAILS PER SIDE 14' (2) 1/2" BOLT 2 RAFTE (1) /2" BOLT \ 12,, I / / � TRUSS TO (8) TOTAL 3 PLY COLUMN TRUSS T (8) 16D NAILS 3 PLY COLUMN RAFTER TO 16D NAILS OW SIDE COL MN 16' 5'-3" COLUMN CONNECTION COLU ON ION 10'-4" COLUMN CONNECT N (2 PL 3 PLY, OR SOL ) 3 STANDARD INSTALLATION OF TRUSSES INSTALLATION OF TRUS S ST DARD INSTALLATION 0 N CH OUTSIDE & MIDDLE P AND L RAFTERS NOTCH OUTBID SET TRUSS IN NOTCHED MIDDLE PLY 4'-3" 4 14'-7" SET TRUSS IN NOTCH P Y AND SET RAFTER IN NOTC 2 Z- (2) 2X4X8" — TREATED BLOCK W/(3) 1 O ' _ 4" BUILDING SPECS EAVE ICH COLUMN HOLE # ROW HEIGHT LENGTH DEPTH GIRTS (3) 16D NAILS 8'-7" 7'-4" 14' 5'-3" 2 (2) PLACES 9'-7" 8'-4" 14' 4'-3" 3 10'-7" 9'-4" 16' 5'-3" 3 11'-7" 10'-4" 16' 1 4'-3" 3 GIRT, BEVELED 12'-7" 11'-4" 18' 5'-3" 4 PURLIN, OR T&G PLANK 13'-7" 12'-4" 18' 4'-3" 4 14'-7" ,-4„ _ „ 15'-7" 14'-4" 20' 4'-3" 5 16'-7" 15'-4" 22' 5'-3" 5 (3) 16D NAILS 17'-7" 16'-4" 22' 4'-3" 5 (1) EA LAMINATE 18'-7" 17'-4" 24' 5'=3" 6 COLUMN 19'-7" 18'-4" 24' 4'-3" 6 (SEE FLOOR PLAN 20'-7" 19'-4" 26' 5'-3" 6 FOR SIZE) 21'-7" 20'-4" 26' 4'-3" 7 100'-0" MARK 0 1 4"X4" PRECAST FOOTINGS WG" ,Section over36 I>aGround,dwg View: Section ® Drawn By: CAH ick Buildings' nr;o n Date: 5-25-00 Rev ebecie by: Date: Revision Date: 3/26/03 C GIRT SPACING 2'-4 1/2" 1'-11" 2'— 2' 2'-5" 2'-0 1/2" 2'— 3' 2 5 1/4„ 2- 2'-3 1 /2" 2'-5 1/2" 2'-2 1/4" 2'-4" 2'-5 3/4" 2'-2 3/4" LBYSUCH STANDARD GIRT SPACING MAY BE AFFECTED ITEMS AS OVERHANGS, INSULATION,COTING, EAVELITES, ETC. SEE ACCOMPANYING S FOR THESE SPECIAL SITUATIONS. wick Gable Building Specifications Over 36' Span In Ground Scale: 30 �1('_n.trj_±;on ivlanoal Page 1('—+—c6on Detail Pack.Pave: DO NOT SCALE I 111SIF 0.1 1 .If AoAl"w r J7�0,e%3 se Aa/w 61-v f� CITY OF BLAIR ® APPLICATION FOR BUILDING PERMIT �•gpam=a°Q Permit I wyy Date: Approximate Completion Date: '� 1 Site Plan Attached: `REScheck Attached: Complete Plans Attached Application for: Residential Commercial/Industrial r✓ New Construction ✓ Manufactured Home Modular Move -on: Home Accessory Building Other Remodel Addition Accessory Building: Garage Pole Barn Other LJ' Ll W5 Floor Type: Dirt Concrete ✓" Electricity: Yes No Sign Erecting, Awnings Decks/Handicap Ramps (plot plan required) Satellite Dishes/Radio Antenna/Cell Towers (plot plan required) Other Utilities: Public Water: Yes No `� Private Well If yes, responsible entity: Blair OPPD Line Kennard Agreement needed: Date Agreement Received: Public Sewer: Yes No Septic Drawing Provided: If yes, responsible entity: Blair Kennard County Road Permit Required: Yes No Submitted: Yes No Additional Description of project if necessary: �- n, a /J ;X(L.' , n P.!\�{,Y) 1IJ Cil Q --,, rJ Y__ -- 0 r A .gym 0 � ®r` /2 .x 1 Project Information: Job Address: 9-'7 9— -5 s Legal. Description (if applicable) e Owner: PAe_k4y Address: a b Y14&,I I G Contractor: rkXS-PH Address: 3 ��o'� `ST Email Address for Contractor: Phone#: �� (__?d,��% Phone #: V1 b _V VV 0 Cell #: Separate permits are required for electrical, plumbing, hearting, ventilating and air conditioning, and septic systems. By my signature below, I acknowledge this building permit application does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until i have received a copy of a permit signed by the Building Inspector. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the 0 ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 d ys or is not r4mpteted within two (2) year5.of W of issue. Z19 For Building Permits than One & Two Family Residential Structures: agree that I have/will submit a set of plans for this project to the Nebraska State Fire Marshal's Office for of Owner/Codtractor Date CITY Of t)LAIQ- U01412:14 V &I k 1&111:2 This supporting document includes information dealing with particular code requirements and/or roofing permit requirements. It in no way includes ALL particular code items. Also, it is your responsibility to know the 2006 International Building Code requirements that apply to your project. Please understand this document is only designed and distributed to aid you in your roofing permit process. A copy of the International Building Code is available for your use at the Blair Public Library. I have read the above disclosure and accept this building permit documentation on my own behalf assuming full responsibility as the owner/contractor for this project. Owner/Occupant City of Blair Date 218 South 16th Street • Blair, Nebraska 68008 • 402-426-4191 > Fax 402-426-4195 - E-mail cityofblair@ci,blair,ne.us oPooA. x" NI 01111-- A $500.00 refundable deposit is being collected for any new commercial, new residential, and any additions, remodels and accessory building valued $10,000 or greater at the time of your building permit application. A $200.00 refundable deposit is being collected for any residential remodel, addition or accessory building valued under $10,000. A $50.00 refundable deposit is being collected for all misc. permits. The City reserves the right to not refund this deposit if any of the following conditions occur during the construction period: 1) Theft of water service by the plumber, owner or, general contractor. 2) All permits have not been obtained. 3) All required inspections have not been obtained. 4) Occupancy occurs prior to a final inspection. 5) The project is completed without a final inspection being done. 6) Storm Water Management Plan inspection not obtained. (If Required) If any or all of these situations occur during construction, you may forfeit your deposit. I hereby agree to the above conditions, and understand that should any or all of the above situations occur, the building permit deposit SHALL be forfeited or discounted upon the discretion of the City of Blair, Building and Inspections Department. City of Blair nates NFPX 6/29/2010 1 M 06085-10 Jerry Jorgensen Jorgensen Contracting, Inc. 530 Front St. Blair, NE 68008- (402) 426-4440 NEBRASKA STATE FIRE MARSHAL PLANS DIVISION Michail Borer Warehouse 575 South 1 st St Blair 68008- Your items have been reviewed for compliance with the Nebraska State Fire Marshal Act. ■ ».�,.... s�,„„a. �v�� .ter-��a.._a�...r..rs.��,, ,._ .,,.�;:.�, �_ ..>�'.: � �� �:,�,�.. r�� w,,., - ,a c... _ . , -=t^ 1. .r.�..._ �ak�r ,.�. ',� .�..�-�;- ::::- � . „ _ �,, .� ,�.,,_k REMARKS: Plan review is for a new storage building. 1. Every building or structure used for storage shall have not less than two separate means of egress. The walk doors shall be located not less than 45 feet away from each other. LSC 42.2.4.1 2. Interior and exterior illumination shall be provided leading to each exit and extending outside of the building to a public way. LSC 42.2.8 3. Exit signage shall be provided. LSC 42.2.10 This code review does not determine compliance with the State of Nebraska Accessibility Guidelines. This determination shall be done by the local jurisdiction in which the project is located. cc. Blair Codes District B Page 1 of 2 SIGNED: PLEASE CONTACT OFFICE INDICATED BELOW FOR A FINAL INSPECTION. FINAL 0 ITE APPROVAL IS REQUIRED PRIOR TO OCCUPANCY OR USE. e,� Jim Kenney Reviewed By: Main Office 246 South 14th Street Lincoln, NE 68508-1804 (402) 471-2027 Contact for Inspection: District B 438 W Market Albion NE 68620-1241 (402) 395-2164 6/29/2010 1 M 06085-10 Jerry Jorgensen Jorgensen Contracting, Inc. Michail Borer Warehouse 530 Front St. 575 South 1 st St Blair, NE 68008- Blair 68008- f f (402) 426-4440 Your items have been reviewed for compliance with the Nebraska State Fire Marshal Act. Final Architectural Plan Alt Phone: Email: Occupancy Type: Storage Construction Type: Post Frame Estimated Start Date: 7/1/2010 Estimated Completion Date: 11/1/2010 Fire Protection Features: Sprinkler Total ❑ Spinkler Partial ❑ Range Hood System ❑ Sprinkler Other: Fire Alarm Manual Sys. ❑ Smoke Detection ❑ Heat Detection ❑ Fire Alarm Other: Page 2 of 2 PLEASE CONTACT OFFICE INDICATED BELOW FOR A FINAL INSPECTION. FINAL OUSITE APPROVAL IS REQUIRED PRIOR TO OCCUPANCY OR USE. SIGNED: ,/ r-'"� Jim Kennev Reviewed By: Main Office 246 South 14th Street Lincoln, NE 68508-1804 (402) 471-2027 Contact for Inspection: District B 438 W Market Albion NE 68620-1241 (402) 395-2164