Loading...
BP13440CITY OF BLAIR - APPLICATION FOR BUILDING PERMIT �P omsaa' Permit # Date:, (0 Approximate Completion Date: (s brq i b Site Plan Attached: REScheck Attached: Complete Plans Attached Application for: Resident Commercial/Industrial New Construction lManufactured Home Modular Move -on: Home Accessory Building Other Remodel Addition Accessory Building: Garage Pole Barn Other Floor Type: Dirt Concrete Electricity: Yes No Sign Erecting, Awnings Decks/Handicap Ramps (plot pian required) Satellite Dishes/Radio Antenna/Cell Towers (plot pian required) Other 0 Utilities: Public Water: Yes No Private Well If yes, responsible entity: Blair OPPD Line Kennard Agreement needed: Date Agreement Received: Public Sewer: Yes No Septic Drawing Provided: If yes, responsible entity: Blair Kennard County Road Permit Required: Yes No Submitted: Yes No Additional Description of project if necessary: l iry­,\ �� MV bld \eQ0 S . d \ YTI Project Information: Job Address: Legal. Description (if applicable) U D® z Z / Wa OwnerAddress: Phone#: Contractor: C!>C.6 0v--\ Phone #: Address:4 Nj () I "L "►`D bwxa- Cell #: q03---iV9 Email Address for Contractor: Separate permits are required for electrical, plumbing, hearting, ventilating and air conditioning, and septic systems. By my signature below, I acknowledge this building permit application does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of a permit signed by the Building Inspector. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes/ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days or is not completed within two (2) years of date of issue. Signature of Owner/Contractor Date For Building Permits other than One & Two Family Residential Structures: I hereby acknowledge and agree that I have/will submit a set of plans for this project to the Nebraska State Fire Marshal's Office for .Review. Signature of Owner/Contractor ZONING REVIEW: Zoning/Flood Plain/Utilities: Current Zoning: Conditional Use Permit Required: Yes No Date CUP Approved: State Fire Marshal Required: Yes No Variance Required: Yes No Minimum Setbacks: Front Second Front Side Side Rear Lot Square Footage: Length x Width: Lot Coverage % D ri veways/S i d ewa 1 ks: Sidewalk required: Yes No Sidewalk Waiver: Yes No Date Waiver Approved: Preexisting Garage requires driveway to be less than 3' from property line: Yes Approved by: Flood Plain: Yes No If yes, specify special requirements: BUILDING INSPECTOR REVIEW: Number of Stories One Two Three Four >Four High Rise (>75 ft) lyse of Residential Structure: Ranch Two Story Split Entry Raised Ranch Other Rooms Bedrooms Bathrooms Fireplaces Gas Electric Egress in Basement: Required: Yes ' . No Provided on Plans: Yes No Sleeping Rooms Living Area Other Egress Sauare Footage: Main Level: Second Level: Third Level Basement: (Unfinished) (Finished) Garage: 2 bay 3 bay 4 bay 5+ bay Detached Garage: Pole Barn: Addition: Remodel: Porch: Front Rear Side Deck that affect setbacks: Rear Front Side Occupancv Classification: Assembly, theaters, with stage Assembly, theater, without stage Assembly, nightclubs Assembly, restaurants, bars, banquet halls Assembly, churches Assembly, arenas Assembly, general, community halls, libraries, museums Business Educational Factory and industrial, moderate hazard _ Factory and industrial, low hazard High Hazard, explosives (section continued on next page) High Hazard HPM Institutional, supervised environment Institutional, incapacitated Institutional, restrained Institutional, day care facilities Mercantile Residential, hotels Residential, multiple family Residential, one- and two-family Residential, care/assisted living facilities Storage, moderate hazard Storage, low hazard Utility, miscellaneous Is building required to be protected by automatic fire sprinkler system?" No Only partially in some areas or rooms Please Specify Yes If yes, the standard to which the sprinkler system will be designed: NFPA 13 NFPS 13R NFPA 13D Driveway Grade: 20% grade or less? Yes No (Dale will review new residential construction. AI will review all second access requests and industrial and commercial driveway requests) Required Off Street Parking: Permit Fee Calculation: Building Permit Deposit Fee: Commercial, new homes and residential additions/remodels/accessory buildings valued $10,000 or greater $ Fee - $500.00 Residential additions/remodels/accessory buildings valued under $10,000 $ Fee = $200.00 All other permits Fee = $50.00 $ RESIDENTIAL - NEW CONSTRUCTION: Permit fee is: Finished sq/ft area X $92 (not including finished basement area) Finished basement sq/ft area X$56 Unfinished basement sq/ft area X $29 Garage sq/ft area X $25 Total Valuation: Total Valuation Multiplied by 0.006 = Issuance Fee: $ 25.00 Total Permit Fee = Deposit + Permit Fee + Issuance Fee $ nesVIn-iustftl/Ed-ucational/Assembly/Factory/Storage/Utility *Porches with roofs/screened patios are considered additions Construction valuation computation: Sq/ft area X $63 Except for the following: Accessory Buildings & Interior Remodeling Projects: sq/ft area X $43 Pole barns with no hard surface floor: sq/ft area X $25 Sign Erecting/Awnings and Decks/Handicap Ramps: sq/ft area X $25 (Minimum valuation of $2000) Construction valuation computation: Finished sq/ft area ` 1 X $ Log $®a> Construction valuation is ........... ........................Permit fee is: $0 TO$50...........................................................$0 $51 TO $500 ........................................................ $25 $501 TO $2,000........................................................$25 + $3 per additional $100 $2,001 TO $25,000........................................................ $70 +$13 per additional $1,000 $25,001 TO $50,000......................................................$370 +$10 per additional $1,000 $50,001 TO $100,000......................................................$620 + $7 per additional $1,000 $100,001 TO $500,000......................................................$970 + $5 per additional $1,000 $500,001 TO$1,000,000..................................................$2,970 + $4 per additional $1,000 $1,000,001 AND OVER..................................................$4,970 + $3 per additional $1,000 Permit Fee calculated from chart above $ `l • 04:) Issuance Fee: $ 25.00 100q. ° v Total Permit Fee = Deposit + Permit Fee + Issuance Fee $ ISO , dG Additional Comments: Approved by:Date: Cc Contingent On Approval by Fire Marshall Meet IBC, IPC, IMC and NEC Code Requirements Sleeping Rooms below Story and in Basement required to have egress For Office Use Only Date Permit Paid: Permit Fee: Deposit Amount Receipt # Deposit Paid by for return to: Building Inspection Pouch given: Yes No Z 7. d'O C z 0 _ W z0 0 1 V N T !� J 3/4" WATEFJ o N J / O o �j O C�I z 0 W z0 0 N D 9 a y m O N m � m D Cf) co c 0 0 C�I CITY OF BLAIR, NEBRASKA Phone 402-426-4191 THANK YOU KAPTHIS COPY FOR YOUR RECORDS. NO RECEIVED BY Pounds Printing, Blair, NE 68008 PLUMBING C T Jurisdiction of City otf1Blair, Nebraska h 16 Street (3q 218 Sout Blair, Nebraska 68008 Fax (402) 426-4195 P 2114 (402) 426-4191 Application Date: -,5-,-/,2`" / 6 Permit Fee: $ ' Job Address ,J (J d Owner � Cd , /) Z f Mai dress � 7 Zip Phone �/G (J Contrac or MaH Addressi / Zi . Phone 2. 3. Class of Work: l�OMMERCIAL O RESIDENTIAL O Addition O Alteration O Repair Cl Replacement Describe Work• �(� ✓� 4. /jCj TiN9 ./L rJ �7�i� d�G1 Pid �%C c' PLUMBING PERMIT FEES Comments: Modular Home ......................$50.00 Type of Fixture No. Kitchen .............................. $12.00 x Bath..... Residential/Single Stall $12.00 x ....................Multi -Stall $25.00 x Rough -In Bath ........................$8.00 x Additional Sinks.....................$6.00 x Slop Sink/Laundry Tray/Drain-....$6.00 x Water Heater .........................$10.00 x Notice Outside Water Faucet...................$6.00 x I hereby certify that I have read and examined this Drinking Fountain ........................$6.00 x application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or Backflow/Grease Trap$15.00 not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other Water Service .......................$15.00 state or local law regulating construction or the Sewer6) o performance of construction. .................................$15.00 Groundwork .........................$15.00 Septic Tank & Laterals............ $15.00 Lawn Sprinkler System ............ $10.00 Sprinkler System (Commercial).. $3 0.00 Gas/Water Piping System (Commercial)........................$50.00 Signature of Contractor or Authorized Agent Permit Issuance Fee.................$25.00 Total oCurrent License on File `'Yes O No O N/A Date Comment: WHEN FRUPEKL Y V ALIDA 1 hL) (1N 1 till �,YAUL) 1 rila la Y U U K Yrlclvll 1 Approved By: Rev. 2008-10 COMcheck Software Version 3.7.1 Section 1: Project Information Project Type: New Construction Project Title Novozymes Administration Building Construction Site: 600 South First Street Blair, NE 68008 Owner/Agent: Cindy Campbell Novozymes Blair, Inc. 600 South First Street Blair, NE 68008 402-237-3102 CYCB@novozymes.com Section 2: General Information Building Location (for weather data): Blair, Nebraska Climate Zone: 5a Vertical Glazing / Wall Area Pct.: 15% Activity Tvaefs) Floor Area Office 1620 Section 3: Requirements Checklist Climate -Specific Requirements: FILE CORT PERMIT O Designer/Contractor: Mark Lawlor Boyd Jones Construction 4360 Nicholas Street Omaha, NE 68131 402-553-1804 miawlor@boydjonesconstruction.com Component Name/Description Gross Area Cavity Cont. Proposed Budget or Perimeter R Value R -Value U -Factor 11.11-Factor(a) Roof 1: Attic Roof with Wood Joists 2994 30.9 0.0 0.033 0.034 Exterior Wall 1: Wood -Framed, 16" o.c. 1653 15.0 0.0 0.083 0.089 Window 1: Metal Frame:Double Pane with tow -E, Clear, SHGC 169 0.340 0.550 0.69, PF 0.33 Poor 1: Glass (> 50%glazing), Entrance Door, SHGC 0.69, PF 0.33 84 -- 0.340 1.200 Floor 1: Slab-On-Grade:Heated, Vertical 2 ft. 166 0.0 - (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements. Air Leakage, Component Certification, and Vapor Retarder Requirements: bd/1. All joints and penetrations are caulked, Basketed or covered with a moisture vapor -permeable wrapping material installed in accordance with the manufacturer's installation instructions. �2. windows, doors, and skylights certified as meeting leakage requirements. bd�3. Component R -values & U -factors labeled as certified.. L `'. Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that achieves the rated R -value without compressing the insulation. No roof insulation is installed on a suspended ceiling with removable ceiling panels. lM 6. 'Other' components have supporting documentation for proposed U -Factors. 7. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized dampers. U.U. Cargo doors and loading dock doors are weather sealed. Recessed lighting fixtures are: (i) Type IC rated and sealed or gasketed; or (ii) installed inside an appropriate air -tight assembly with a 0.5 inch clearance from combustible materials and with 3 inches clearance from insulation material Project Title Novozymes Administration Building Report date: 05/17/10 Data filename. C:\Documents and Settings\Martha\My Documents\COMcheck\novozymes.cek Page 1 of 12 May, 7. 2010 8:36AM CITY OF BLAIR (402. 426, 4191) No, 4587 P. 2/2 MECHANICAL PERMIT APPLICATION Jurisdiction of City of $lair, Nebraska 218 South 16th Street Blair, Nebraska 68008 Fax (402) 426-4195 (402) 426-4191 Application Date: l LJ M 1980 a o Permit Fee: $ 1 �/0 Job Addreg3 �. Owner ^ Meal A4dre Zip phone 1, v Contra for A r§ /• Zip Phone J t 3. Class of Work: 0 COMMERCIA R DENTIAL ew CJ Add[tton 0 Alteration 0 Repair 0 Replacement Dcsodbc Work: 4. Q % • �AQ.e� MECHANICAL PENT FEES Heat Pump _ Tons Central A/C _ Tons Furnace/Heat Pump/Air Conditioner (Per Unit) Pomace _ BTU/H Up to and including 100,000 BTU / 3Ton............................$15.00 # of Units A/C ftmace/Heat PumplAir Conditioner (Per Unit) • 00 Furnace Over 100,000 BTU/ 3 Ton.............................................$25.00 Completion bate: Refrigeration Units/Coolers/Lines/Compressor— Commercial or Replacement) (Per Unit) Boner Chart(New BTUFee ..................................................... ..............$15.00 Up to 100,000 ................................$15.00 100,000-500,000 ..............................$30.00 500,000-1,000,000 ...........................$40.00 1,000,000-1,750,000 ........................$60.00 Over 1,750,000... .........$100.00 Boiler (use BTU Chart to left).................... Appliance Vent/Fans ........................$10.00 • 06 Notice Duct System..................................$15.00 l C5. 6a I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of Gas/Air Outlets.................First 5 x $6.00 work will be complied with whether specified heroin or not. The granting of a permit does not presume to give .........Additional x $1.00 authority to violate or cancel the provisions of any other state or local law regulating construction or the Radiant Heat Systems/GaMater performance of construction. piping System................................$50.00 Modular Home ............................... $50.00 Signftwrc of Contractor or Authorized Agent � ` Q Permit Issuance Ree .................. .... $25.00 1 Total Current License on bile des 17 No 0 N/A Dace Comment: WHEN PROPERLY VALIDATED Approved By: C 1_j ;-J ll T� THIS SPACE) THIS IS YOUR PERMIT 2008-10 10.Building entrance doors have a vestibule equipped with closing devices. Exceptions: Building entrances with revolving doors. Doors that open directly from a space less than 3000 sq. IL in area. 1 "apor retarder Installed. Section 4: Compliance Statement Compliance Statement. • The proposed envelope design represented in and other calculations submitted with this permit application. The propc requirements in COMcheck Version 3.7.1 and to comply with the mand MMk I -6r C C Name - Title Signe Project Notes: 1,620 square feet wood -framed building with brick veneer and a stan ing seem i the building plans, specifications designed to meet the 2006 IECC 'ements Checklist. �tZ-td Date be used as an Administration Building. Project Title Novozymes Administration Building Report date: 05/17/10 Data filename: C:kDocuments and SettingsWarthaWiy DocumentskCOMcheckknovozYmes.cck Page 2 of 12 MECHANICAL PERMIT APPLICATION Jurisdiction of City of Blair, Nebraska 218 South 16th Street Blair, Nebraska 68008 Fax (402) 426-4195 M 1980 (402) 426-4191 //�� Application Date: / ! ® Permit Fee: $ / o Job Address 4? 151 Y, Owner Mail Addre �� zip Phone 1. ® Contractor 1 Ad r ss� zip Phone 2. B 3. Class of Work: O COMMERCIAL O R IDENTIAL ew O Addition O Alteration O Repair O Replacement Describe Work: MECHANICALPERMIT FEE Heat Pump Tons Central A/C Tons Furnace/Heat Pump/Air Conditioner (Per Unit) Furnace BTU/H Up to and including 100,000 BTU / 3Ton............................$15.00 # of Units A/C Furnace/Heat Pump/Air Conditioner (Per Unit) h9 ®. 00 Furnace Over 100,000 BTU / 3 Ton.............................................$25.00 Completion Date: Refrigeration Units/Coolers/Lines/Compressor — Commercial (New or Replacement) (Per Unit) Boiler Chart BTUFee ..............................................................................$15.00 Up to 100,000 ................................$15.00 100,000-500,000 ..............................$30.00 500,000-1,000,000 ........................... $40.00 1,000,000-1,750,000 ........................$60.00 Over 1,750,000 ..............................$100.00 Boiler (use BTU Chart to left).................... Appliance Vent/Fans ........................$10.00 /0.00 Notice Duct System..................................$15.00 , D 19 I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of Gas/Air Outlets.................First 5 x $6.00 work will be complied with whether specified herein or not. The granting of a permit does not presume to give .........Additional x $1.00 authority to violate or cancel the provisions of any other state or local law regulating construction or the Radiant Heat Systems/Gas/Water performance of construction. Piping System................................$50.00 Modular Home ............................... $50.00 Signature of Contractor or Authorized Agent ®v Permit Issuance Fee..........................$25.00 Total ®� Current License on File es O No O N/A Date Comment: WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT Approved By: 2./ Rev. 2008-10 COMcheck Software Interior Lighting Compliance Cert icate 20061ECC Section 1: Project information Project Type: New Construction Project Title : Novozymes Administration Building Construction Site: Owner/Agent: 600 South First Street Cindy Campbell Blair, NE 68008 Novozymes Blair, Inc. 600 South First Street Blair, NE 68008 402-237-3102 CYCB@novozymes.com Section 2: General information Building Use Description by: Activity Type Activity Tvne(s) Floor Area Office 1620 Section 3 Requirements Checklist Interior Lighting: 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Watts Proposed Watts Complies 1620 1513 YES Designer/Contractor. Mark Lawlor Boyd Jones Construction 4360 Nicholas Street Omaha, NE 68131 402-553-1804 miawlor@boydjonesconstruction.com Controls, Switching, and Wiring: 5af 2. independent controls for each space (switch/occupancy sensor). Exceptions: Areas designated as security or emergency areas that must be continuously illuminated. Lighting in stairways or corridors that are elements of the means of egress. 0 3. Master switch at entry to hotel/motel guest room. Lj 4. Individual dwelling units separately metered. 5. Each space provided with a manual control to provide uniform light reduction by at least 50%. Exceptions: Only one luminaire in space; An occupant -sensing device controls the area; The area is a corridor, storeroom, restroom, public lobby or sleeping unit. Areas that use less than 0.6 Watts/sq.ft. Lj 6. Automatic lighting shutoff control in buildings larger than 5,000 sq.ft. Exceptions: Sleeping units, patient care areas; and spaces where automatic shutoff would endanger safety orsecurity. 7. Photoceli/astronomical time switch on exterior lights. Exceptions: Lighting intended for 24 hour use. 08. Tandem wired one -lamp and three -lamp ballasted luminaires (No single -lamp ballasts). Exceptions:. Protect Title: Novozymes Administration Building T Y Report date: 05117/10 Data filename: CMacuments and Seihngs\Marthaft Documents\COMcheck\novozymes.cck Page 3 of 12 st Electronic high -frequency ballasts; Luminaires on emergency circuits or with no available pair. Section 4: Compliance Statement Compliance Statement. The proposed lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 2006 IECC requirements in COMcheck Version 3.7.1 and to comply with the ;ndatoyeqWIremrrn in the Requirements Checklist. 17 ff� Name -Tide �J na re Date Project Title: Novozymes Administration Building Report date: 05117110 Data filename: CADocuments and settingswartnaWy oocumentsNCOMcheck\novozymes.cck Page 4 of 12 20061ECC Section 1: Allowed Lighting Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts / ft2 (B x C) Office 1620 1 1620 Total Allowed Wafts = 1620 Section 2: Proposed Lighting Power Calculation A B C D E Fixture ID: Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Office (1620 sqA) Linear Fluorescent 1: A: 2x4 lensed troffer / 48" T8 32W 1 Electronic 2 24 58 1382 Linear Fluorescent 2: B: 4' Industrial Strip / 48" T8 32W / Electronic 2 1 49 49 Compact Fluorescent 1`. C; 6 / Triple 4 -pin 32W / Electronic 1 2 36 72 Total Proposed Watts = 1513 Project Title: Novozymes Administration Building Report date: 05117/10 Data filename: C:\Dooaments and Settings\Marthaft Documents\CCMcheck\novozymec.ock Page 5 or 42 2006 IECC Section 1: Project Information Project Type: New Construction Project Title: Novozymes Administration Building Construction Site: Owner/Agent: Designer/Contractor: 600 South First Street Cindy Campbell Mark Lawlor Blair, NE 68008 Novozymes Blair, Inc. Boyd Jones Construction 600 South First Street 4360 Nicholas Street Blair, NE 68008 Omaha, NE 68131 402-237-3102 402-553-1804 CYCB@novozymes.com mlawlor@boydjonesconstruction.com Section 2: Exterior Lighting Area/Surface Power Calculation A B C D E F Exterior Area/Surface Quantity Allowed Tradable Allowed Proposed Watts Wattage watts Watts Unit (C x D) Main entry/exit 6 ft of door width 30 Yes 180 86 Main entry/exit 3 it of door width 30 Yes 90 86 Main entry/exit 3 it of door width 30 Yes 90 86 Total Tradable Watts` = 360 258 Total Allowed Watts = 360 Total Allowed Supplemental Watts" = 18 Wattage tradeoffs are only allowed between tradable areastsurfaces. " A supplemental allowance equal to 5% of total allowed wattage may be applied toward compliance of both non -tradable and tradable areas/surfaces. Section 3: Exterior Lighting Fixture Schedule A B C O E Fixture ID: Description / Lamp 1 Wattage Per Lamp t Ballast Lamps/ # of Fixture (C X D) Fixture fixtures Watt. Main entry/exit (6 ft of door width): Tradable Wattage HID 1: W. Wall Pak / Metal Halide 70W /Pulse start 1 1 86 86 Main entry/exit (3 ft of door width): Tradable Wattage HID 2: W. Wall Pak t Metal Halide 70W / Pulse start 1 1 86 86 Main entry/exit (3 it of door width): Tradable Wattage HID 3: W: Wall Pak / Metal Halide 70W / Pulse start 1 1 86 86 Total Tradable Proposed Watts = 258 Section 4: Requirements Checklist Lighting Wattage: 1. Within each non -tradable area/surrace, total proposed watts must be less than or equal to total allowed watts. Across all tradable areas/surfaces, total proposed watts must be less than or equal to total allowed watts. Compliance: Passes. Controls, Switching, and Wiring: El 2_ All exemption claims are associated with fixtures that have a control device independent of the control of the nonexempt lighting. Project Title: Novozymes Administration Building Report eport date. 05117/10 Data filename: C:1Documents and SettingsWarthaWy DocumentskCOMcheck\novozymes.cck Page 6 of 12 3. All lighting fixtures are controlled by a photosensor or astronomical time switch that is capable of automatically turning off the fixture when sufficient daylight is available or the lighting is not required. Exceptions: Covered vehicle entrance/exit areas requiring lighting for safety, security and eye adaptation. Exterior Lighting Efficacy: 4. All exterior building grounds luminaires that operate at greater than 100W have minimum efficacy of 60 lumen/watt. Exceptions: Controlled by motion sensor or exempt from consideration under the provisions of Section 505.6.2. �- a s• s. Section 5: Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 2006 IECC requirements in CS�O//Mcheck Version 3.7.1 and to comply with the mandatory requirerrAorlts in the Requirements Checklist. Name - Title Signature -- Date Project Title: Novozymes Administration Building Report date: 05/17110 Data filename: c.mocuments and SettingsWiarthaWy DocumentsiCOMchecklnovozymes.cck Page 7 of 12 2®06 IEGC Section 1: Project Information Project Type: New Construction Project Title : Novozymes Administration Building Construction Site: OwnedAgent: Designer/Contractor: 600 South First Street Cindy Campbell Mark Lawlor Blair, NE 68008 Novozymes Blair, Inc. Boyd Jones Construction 600 South First Street 4360 Nicholas Street Blair, NE 68008 Omaha, NE 68131 402-237-3102 402-559-1804 CYCB@novozymes.com mlawlor@soydjonesconsVuction.com Section 2: General Information Building Location (for weather data): Blair, Nebraska Climate Zone; 5a Section 3: Mechanical Systems List Quantity SYe In Tye. Descrip nn 1 HVAC System 1: Split System Heat Pump, Heat Capacity 85300 kBtulh Cool Capacity 60000 kBtulh, Heat efficiency: 8.20 GOP. Cool efficiency: 16.00 EER, Cool efficiency: 16.00 EER ! Multiple -Zone 1 Water Heater 1: Electric Storage Water Heater, Capacity: 40 gallons wl Circulation Pump, Efficiency: 0.92 EF Section : Requirements Checklist Requirements Specific To: HVAC System 1 : iy�1. Equipment minimum efficlency. Heat Pump: 3.1 COP 9.0 EER (9.2 IPLV) d2. Minimum one temperature Control device per zone Rf3. Heat pump thermostat required when supplemental electric resistance heat is installed © 4. Water economizer is included and calculations required Exception: Air/evap condenser serving space with open -case refrigeration 5. Systems serving more than one zone must be VAV systems 0 6. Single -duct VAV terminals reduce primary air before reheating 0 7. Dual -duct VAV mixing boxes installed to minimize mixing Requirements Specific To: Water Heater 1 : Hot water system sized per manufacturer's sizing guide Electric Water Heater efficiency: 0.9 EF;241 SL, Btulh (If > 12 kW)) lj 3. All piping in circulating system insulated V4. temperature adjustable down to 120 degrees F or lower 0 6. Automatic time control of heat tapes and recirculating systems present 6. Controls will shut off operation of circulating pump between water heaterlboller and storage tanks within 6 minutes after end of beating cycle Generic Requirements: Must be met by all systems to which the requirement is applicable: Ef 1. Load calculations per ASHI' AE Fundamentals (r2, Plant equipment and system capacity no greater than needed to meet loads Project Title: Novozymes Administration Building Report date: 05/17110 Data filename: C:\Documents and Settings\MarthalMy DocumentslCOMchecklnovozymes,eck Page 8 of 12 Exception: Standby equipment automatically off when primary system is operating Exception: Multiple units controlled to sequence operation as a function of load 0"3. Minimum one temperature control device per system U d. Minimum one humidity control device per installed humidification/dehumidification system Automatic Controls: Setback to 55 degrees F (heat) and 85 degrees F (cool): 7 -day clock. 2 -hour occupant override, 10 -hour backup Exception: Continuously operating zones Exception: 2 kW demand or less, submit calculations m"'61 Outside -air source for ventilation; system capable of reducing OSA to required minimum i�(7. R-5 supply and return air duct insulation in unconditioned spaces R-8 supply and return air duct Insulation outside the building R-6 insulation between ducts and the building exterior when ducts are pad of a building assembly - Exception: Ducts located within equipment - Exception: Ducts with interior and exterior temperature difference not exceeding 15 degrees F. - Exception: Continuously welded and locking -type longitudinal joints and seams on ducts operating at static pressures less than 2 inches w.g. pressure classification d8. Mechanical fasteners and sealants used to conned ducts and air distribution equipment ®,'9. Ducts sealed -longitudinal seams on rigid ducts; transverse seams on all ducts; UL 181A or 181B tapes and mastics &1/10.Hot water pipe insulation: 1 In. for pipes <=1.5 in. and 2 in, for pipes >1.5 In. Chilled water/refrigeranilbrine pipe insulation: 1 in, for pipes <=1.5 in. and 1.5 in. for pipes >1.5 in. Stearn pipe insulations 1.5 in, for pipes z=1.5 in. and 3 in. for pipes >1.5 in. Exception: Piping within HVAC equipment. - Exception: Fluid temperatures between 55 and 105 degrees F. Exception: Fluid not heated or cooled with renewable energy. Exception: Runouts zq ft in length. iG�i :,Operation and maintenance manual provided to building owner 0 12.Piping, insulated to 1/2 in. if nominal diameter of pipe is <1-5 In,; Larger pipe insulated to 1 in. thickness 13.Lavatory faucet outlet temperatures in public restrooms limited to 110 degrees F (43 degrees G) & Id. Balancing devices provided in accordance with WC (2006) 603.17 di5.Motonzed, automatic shutoff dampers required on exhaust and outdoor air supply openings Exception: Gravity dampers acceptable in buildings <3 stories Exception: Gravity dampers acceptable in systems with outside or exhaust air flow rates less than 300 cfm where dampers are interlocked with fan O 16.Stair and elevator shaft vents are equipped with motorized dampers L] 17.Exhaust air heat recovery included for systems 5,000 ofm or greater with more than 70% outside air fraction or specifically exempted Section 5: Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2006 iECC requirements in COMcheck Version 3.7.1 and to comply with the mandatory requirements'n the P4quirements Checklist. Nam ° 4 Signalur Date Project Title: Novozymes Administration Building Report date: 05117110 Data filename: CADocuments and Settings\MarthakMy DocumentslCOMchecklnovozymes.cck Page 9 of 12 I COMcheck Software Version 3.7.1 Mechanical it Description 2006 IECC The following list provides more detailed descriptions of the requirements in Section 4 of the Mechanical Compliance Certificate. Requirements Specific To: HVAC System 1 1 The specified heating andtor cooling equipment is covered by the ASHRAE 90.1 Code and must meet the following minimum efficiency: Neat pump: 3.1 GOP 9.0 EER (9.2 IPLV) 2. Each zone of a multiple -zone system must have its own temperature control device. 3. Heat pumps having supplementary electric resistance heat must have controls that, except during defrost, prevent supplementary heat operation when the heat pump can meet the heating load. 4, A water economizer is required with the specified system. Calculations must be submitted demonstrating that the water economizer is capable of meeting the entire cooling load at an outside air temperature of 50 degrees F dry bulb and 45 degrees F wet bulb. Exception: An economizer is not required for systems having air or evaporatively cooled condensers that serve spaces with open -case refrigeration. 5. Systems serving multiple thermostatic control zones must be variable -flow systems. Zone terminal controls must reduce the flow of primary supply air before reheating, recooling, or mixing air streams. 6. The specified multiple -zone system is equipped with single -duct VAV terminals. These terminals must be equipped with dampers, air valves, or other means to reduce the supply of primary supply air to a minimum prior to reheating. 7. The specified system includes both warm -air and cool -air ducts. Zone terminal devices must be installed that reduce the flow of air through each duct to a minimum before mixing with air from the other duct. Requirements Specific To: Water Heater 1 : 1. Service water heating system design loads for the purpose of sizing systems and equipment must be determined in accordance with manufacturers` published sizing guidelines. 2. Service water heating equipment used solely for heating potable water, pool heaters, and hot water storage tanks must meet the following miniumum efficiency: Electric Water Heater efficiency: 0.9 EF (241 SL, Btu/h (it} 12 kW)) 3. Insulation must be provided for recirculating system piping, including the supply and return piping of a circulating tank type water heater. 4. Temperature controls must be provided that allow for storage temperature adjustment from 120 degrees F or lower to a maximum temperature compatible with the intended use except when the manufacturer's installation instructions specify a higher minimum thermostat setting to minimize condensation and resulting corrosion. Documentation of the installation instructions must be provided to be exempted from this requirement, 5. Systems designed to maintain usage temperatures in hot water pipes, such as recirculating hot water systems or heat trace, must be equipped with automatic time switches or other controls that can be set to switch off the temperature maintenance system during extended periods when hot water is not required. 6. When used to maintain storage tank water temperature, recirculating pumps must be equipped with controls limiting operation to the start of the heating cycle to a maximum of 5 minutes after the end of the heating cycle. Generic Requirements: Must be met by all systems to which the requirement is applicable: 1. design heating and cooling loads for the building must be determined using procedures in the ASHRAE Handbook of Fundamentals or an approved equivalent calculation procedure. 2. All equipment and systems must be sized to be no greater than needed to meet calculated toads. A single piece of equipment providing both heating and cooling must satisfy this provision for one function with the capacity for the other function as small as possible, within available equipment options. - Exception: The equipment and/or system capacity maybe greater than calculated loads for standby purposes. Standby equipment must be automatically controlled to be off when the primary equipment and/or system is operating. - Exception: Multiple units of the same equipment type whose combined capacities exceed the calculated load are allowed if they are provided with controls to sequence operation of the units as the load increases or decreases. 3. Each heating or cooling system serving a single zone must have its own temperature control device. 4. Each humidification system must have its own humidity control device. 5. The system or zone control must be a programmable thermostat or other automatic control meeting the following criteria: a) capable of setting back temperature to 55 degrees F during heating and setting up to 85 degrees F during cooling, b) capable of automatically setting back or shutting down systems during unoccupied hours using 7 different day schedules, c) have an accessible 2 -hour occupant override, d) have a battery back-up capable of maintaining programmed settings for at least 10 hours without power. Exception: A setback or shutoff control Is not required on thermostats that control systems serving areas that operate continuously. Exception: A setback or shutoff control is not required on systems with total energy demand of 2 kW (6,826 Stuih) or less. Project Title: Novozymes Administration Building Report date: 05117110 Data filename; C:1Docurnents and SettingsWarthaNy Documents\COMchecklnovozymes.cck Page 10 of 12 6. The system must supply outside ventilation air as required by Chapter 4 of the International Mechanical Code. It the ventilation system is designed to supply outdoor -air quantities exceeding minimum required levels, the system must be capable of reducing outdoor -air flow to the minimum required levels. 7. Air ducts must be insulated to the following levels: a) Supply and return air ducts for conditioned air located in unconditioned spaces (spaces neither heated nor cooled) must be insulated with a minimum of R-5. Unconditioned spaces include attics, crawl spaces, unheated basements, and unheated garages. b) Supply and return air ducts and plenums must be Insulated to a minimum of R-8 when located outside the building.. c) When ducts are located within exterior components (e.g., floors or roofs), minimum R-6 insulation is required only between the duct and the building exterior. Exception`. Duct insulation is not required on ducts located within equipment. Exception_ Duct insulation is not required when the design temperature difference between the interior and exterior of the duct or plenum does not exceed 15 degrees F. Exception: Continuously welded and locking -type longitudinal joints and seams on ducts operating at static pressures less than 2 inches w.g. pressure classification. 8. Mechanical fasteners and seals, mastics, or gaskets must be used when connecting ducts to tans and other air distribution equipment, including multiple -zone terminal units. 9. All joints, longitudinal and transverse seams, and connections in ductwork must be securely sealed using weldments; mechanical fasteners with seals, gaskets, or mastics; mesh and mastic sealing systems; or tapes. Tapes and mastics must be listed and labeled in accordance with UL 181A and shall be marked '181A-P'for pressure sensitive tape, '181A -M' for mastic or'181A-H' for heat -sensitive tape. Tapes and mastics used to seat flexible air ducts and flexible air connectors shall comply with UL 181B and shall be marked '1818 -FX for pressure -sensitive tape or'1818-M' for mastic. Unlisted duct tape is not permitted as a sealant on any metal ducts. 10. All pipes serving space -conditioning systema must be insulated as follows: Hot water piping for heating systems:1 in. for pipes <=1 1124n. nominal diameter, 2 in. for pipes y1 1124n, nominal diameter. Chilled water, refrigerant, and brine piping systems: 1 in. insulation for pipes <=1 1/2 -in. nominal diameter, 1 112 in, insulation for pipes >1 1/2 -in. nominal diameter. Steam piping: 1 112 in. insulation for pipes -I nominal diameter, 3 in. insulation for pipes>1 112 -in. nominal diameter. Exception: Pipe insulation is not required for factory -installed piping within HVAC equipment, Exception: Pipe insulation is not required for piping that conveys fluids having a design operating temperature range between 55 degrees i= and 105 degrees F. Exception: Pipe insulation is not required for piping that conveys fluids that have not been heated or cooled through the use of fossil fuels or electric power. Exception: Pipe insulation is not required for runout piping not exceeding 4 ft in length and 1 in. in diameter between the control valve and HVAC coil. 11. Operation and maintenance documentation must be provided to the owner that includes at least the following Information. a) equipment capacity (input and output) and required maintenance actions b) equipment operation and maintenance manuals c) HVAC system control maintenance and calibration information, including wiring diagrams, schematics, and control sequence descriptions; desired or field -determined set points must be permanently recorded on control drawings, at control devices, or, for digital control systems, In programming comments d) complete narrative of how each system is intended to operate. 12. Service hot water piping, where required, must be insulated to 1/2 in. if pipe less than 1.5 In, nominal diameter. Larger pipe must be insulated to 1 in.. Pipe insulation will have a conductivity of less than 0.28 Stu.inl(h-ft2-degrees F). 13. Temperature controlling means must be provided to limit the maximum temperature of water delivered from lavatory faucets in public facility restrooms to 110 degrees F. 14. Balancing devices provided in accordance with IMC (2006) 603.17. 15, Outdoor air supply and exhaust systems must have motorized dampers that automatically shut when the systems or spaces served are not in use. hampers must be capable of automatically shutting off during preoccupancy building warm-up, cowl -down, and setback, except when ventilation reduces energy costs (e.g., night purge) or when ventilation must be supplied to meet code requirements. Both outdoor air supply and exhaust air dampers must have a maximum leakage rate of 3 cfrnIR2 at 1.0 in w.g. when tested in accordance with AMCA Standard 500. Exception: Gravity (non -motorized) dampers are acceptable in buildings less than three stories in height. Exception: Systems with a design outside air intake or exhaust capacity of 300 cfm (140 Us) or less that are equipped with motor operated dampers that open and dose when the unit is energized and de -energized, respectively. 16. Stair and elevator shaft vents must be equipped with motorized dampers capable of being automatically closed during normal building operation and interlocked to open as requited by fire and smoke detection systems. All gravity outdoor air supply and exhaust hoods, vents, and ventilators must be equipped with motorized dampers that will automatically shut when The spaces served are not in use. Exception: Gravity (non -motorized) dampers are acceptable in buildings less than three stories in height above grade. Exception: Ventilation systems serving unconditioned spaces. 17, individual fan systems with a design supply air capacity of 5000 cfm or greater and minimum outside air supply of 70% or greater of the supply air rapacity must have an energy recovery system with at least a 50% effectiveness. if an air economizer is also required, heat recovery must be bypassed or controlled to permit air economizer operation. Exception: Systems serving spaces that are not cooled and heated to <60 degrees F. Exception: Commercial kitchen hoods (grease) classified as Type 1 by NFPA W Exception: Systems exhausting toxic, flammable, paint, or corrosive fumes or dust. Project Title: Novozymes Administration Building Report date: 05/17/10 Data filename: C:\Documents and Settings\Martha\My Documents\COMchecklnovozymes,cck Page 11 of 12 Exception Where the largest exhaust source is fess than 75% of the design outdoor airflow. Exception: Systems requiring dehumidification that employ energy recovery in series Wth the cooling coil. Project Title: Novozymes Administration Building Report date: 05/17/10 Data filename; C:1Documents and 5ettingsWarthaNy Documents\COMcheckinovozymes.cck Page 12 of 12 [:unur d _ BUILDING PERMIT DEPOSIT AGREEMENT �esidential, $500.00_refu dable deposit is being collected for any new commercial, new a any additions, remodels and accessory building valued $10,000 or greater a e time of your building permit application. A $200.00 refundable deposit is being collected for any residential remodel, addition or accessory building valued under $10,000. A $50.00 refundable deposit is being collected for all misc. permits. The City reserves the right to not refund this deposit if any of the following conditions occur during the construction period: 1) Theft of water service_by the plumber,- owner or -general contractor. 2) All permits have not been obtained. 3) All required inspections have not been obtained. 4) Occupancy occurs prior to a final inspection. 5) The project is completed without a final inspection being done. 6) Storm Water Management Plan inspection not obtained. (If Required) If any or all of these situations occur during construction, you may forfeit your deposit. I hereby agree to the above conditions, and understand that should any or all of the above situations occur, the building permit deposit SHALL be forfeited or discounted upon the discretion of the City of Blair, Building and Inspections Department. ontractor/Owner Contr ctor/Owner 1� - /9- /6 City of Blair ate o�/se of CO CITI' OF 5tAIQ BUILDING PERMIT SUPPORTING DOCUMENTS This building permit packet includes various items dealing with particular code requirements and/or building permit requirements. It in no way includes ALL particular code items. Also, it is your responsibility to know the 2006 International Building Code requirements that apply to your project. Please understand this packet is only designed and distributed to aid you in your building permit process. A copy of the International Building Code is available for your use at the Blair Public Library. I have read the above disclosure and accept this building permit documentation on my own behalf assuming full responsibility as the owner/contractor for this project. -L cr-y - Owner/Occupant )O-ntractor City of Blair & 1< X� )ate :4 MIV- 218 South 16th Street • Blair, Nebraska 68008 • 402-426-4191 • Fax 402-426-4195 • E-mail cityofblair@cLblair.ne,us BUILDING INSPECTION REPORT CITY OF BLAIR ❑ WASHINGTON COUNTY ❑ OTHER LOCATION OF INSPECTION NAME OF OWNER CONTRACTOR 64' DATE INSPECTION REQUESTED _� TIME INSPECTION REQUESTED ` 'a i r`a ° PERMIT N0: TYPE OF INSPECTION REQUESTED: CONFERENCE ❑ STATUS CHECK BUILDING: �> FOOTING ❑ DECK FOOTING ❑ FRAMING ❑ DRYWALL ❑ FINAL ❑ PARTIAL PASSED FAILED COMMENTS: ❑ UTILITIES: ❑ SEWER TAP ❑ SEWER ❑ SEPTIC ❑ WATER TAP ❑ REMOTE ❑ WATER SERVICE PASSED FAILED El PARTIAL 1:1 E]COMMENTS: ELECTRICAL: ❑ ROUGH IN ❑ FINAL ❑ PERMANENT SERVICE ❑ TEMPORARY SERVICE ❑ PRECONNECT PASSED FAILED FlPARTIAL ❑ ❑ COMMENTS: MECHANICAL: ❑ ROUGH—IN ❑ A/C ❑ FURNACE x ❑ RADIANT HEAT ❑ FINAL ❑ PARTIAL PASSED FAILED ❑ ❑ COMMENTS: PLUMBING: ❑ GROUNDWORK ❑ ROUGH—IN ❑ FINAL ❑ WATER METER INSTALLED ❑ PARTIAL PASSED FAILED ❑ PRESSURE TEST El ElCOMMENTS: ❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED INSPECTOR: � `DATE OF INSPECTION MADE: _�( -I ® TIME— FAXED %y'kUA_ FAXED OPPD\BURT REA TO CONNECT SERVICE: at (,f ❑r CITY OF BLAIR ❑ WASHINGTON COUNTY ❑ t� LOCATION OF INSPECTION NAME OF OWNER 1 " - � `E- CO] r DATE INSPECTION REQUESTED L, TIME INSPECTION REQUESTED �� PERMIT TYPE OF INSPECTION REQUESTED: ❑ CONFERENCE ❑ STATUS CHECK BUILDING: ❑ FOOTING ❑ DECK FOOTING ❑ FRAMING ❑ DRYWALL ❑ FINAL ❑ PARTIAL PASSED FAILED ❑ ❑ COMMENTS: UTILITIES: ❑ SEWER TAP ❑ SEWER ❑ SEPTIC ❑ WATER TAP ❑ REMOTE ❑ WATER SERVICE PASSED FAILED F] PARTIAL F] ElCOMMENTS: ELECTRICAL: ❑ ROUGH IN ❑ FINAL ❑ PERMANENT SERVICE ❑ TEMPORARY SERVICE ❑ PRECONNECT PASSED FAILED ❑ PARTIAL ❑ F]COMMENTS: MECHANICAL: ❑ ROUGH -IN ❑ A/C ❑ FURNACE ❑ RADIANT HEAT ❑ FINAL ❑ PARTIAL PASSED,p FAILED �. ❑ ❑ PLUMBING:,' ❑ GROUNDWORK ❑ ROUGH -IN ❑ FINAL ❑ WATER METER INSTALLED ❑ PARTIAL PASSED FAILED COMMENTS: •PRESSURE TEST ❑ ' ❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED 5so INSPECTOR�j b DATE OF INSPECTION MADE: "`� ` / T ` © TIME• FAXED OPPD\BURT REA TO CONNECT SERVICE: BY INSPECTOR DATE OF INSPECTION MADE: S o -3 TIME ��Vn FAXED OPPD\BURT REA TO CONNECT SERVICE: TITTILDING INSPECTION REPORT 'ElC'ITY OF BLAIR E WASHINGTON COUNTY El OTHER_f� �`t LOCATION OF INSPECTION: NAME OF OWNER j CONTRACTORS V DATE INSPECTION REQUESTED- TIME INSPECTION REQUESTED- PERMIT NO. TYPE OF INSPECTION REQUESTED: El CONFERENCE El STATUS CHECK BUILDING: ❑ FOOTING El DECK FOOTING El FRAMING El DRYWALL El FINAL El PARTIAL PASSED FAILED F -I F1 COMMENTS: UTILITIES: F] SEWER TAPE] SEWER F I SEPTIC El WATER TAPE] REMOTE l,..'M,-"WATER SERVIC PASSED FAILED El COMMENTS: PARTIAL DEl L,� L/ i i Lv vo_ ELECTRICAL: F1 ROUGH IN El FINAL El PERMANENT SERVICE ❑ TEMPORARY SERVICE El PRECONNECT PASSED FAILED El PARTIAL ❑ ❑ COMMENTS: MECHANICAL: ❑ ROUGH -IN El A/C El FURNACE El RADIANT HEAT El FINALE] PARTIAL PASSED FAILED F -I F1 COMMENTS: PLUMBING: F -I GROUNDWORK El ROUGH -IN El FINALE] WATER METER INSTALLED El PARTIAL PASSED FAILED El PRESSURE TEST COMMENTS: F -I OCCUPANCY GRANTED El CONDITIONAL OCCUPANCY GRANTED INSPECTOR DATE OF INSPECTION MADE: S o -3 TIME ��Vn FAXED OPPD\BURT REA TO CONNECT SERVICE: "M,Lf,A�/�� CJ .4/ <J � SEI Aj 0512612010 V31 Apo - - ►� Vii_ r - 0512812010 C32,edw t P. '-�,s#_'- �y ` `;. C, 2�t.. tR_ l` ma t 0511312010 03:00 PM tBJLAIR ❑ WASHINGTON COUNTY LOCATION OF INSPECTION• NAME OF OWNER- DATE WNER i�,Uf lel jmj ❑ OTHI t DATE INSPECTION REQUESTED ' TIME INSPECTION REQUESTED _� �� ' ° PERMIT NO: ` �-.j 0 t TYPE OF INSPECTION REQUESTED: ❑ CONFERENCE ❑ STATUS CHECK BUILDING: ❑ FOOTING ❑ DECK FOOTING ❑ FRAMING ❑ DRYWALL ❑ FINAL ❑ PARTIAL PASSED FAILED COMMENTS: UTILITIES: ❑ SEWER T ER ❑ SEPTIC ❑ WATER TAP ❑ REMOTE ❑ WATER SERVICE PASSED FAILED ❑ PARTIAL ,v ❑ ❑ COMMENTS: ELECTRICAL: ❑ ROUGH IN ❑ FINAL ❑ PERMANENT SERVICE ❑ TEMPORARY SERVICE ❑ PRECONNECT PASSED FAILED ❑ PARTIAL ❑ ❑ COMMENTS: MECHANICAL: ❑ ROUGH -IN ❑ A/C ❑ FURNACE ❑ RADIANT HEAT ❑ FINAL ❑ PARTIAL PASSED FAILED ❑ ❑ COMMENTS: PLUMBING: GROUNDWORK ❑ ROUGH -IN E­1FINAL ❑ WATER METER INSTALLED ❑ PARTIAL PASSED FAILED F]PRESSURE TEST r , Y _. L�� (� ❑ COMMENTS: W ❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED INSPECTOR t �""y DATE OF INSPECTION MADE: : 3® FAXED OPPD\BURT REA TO CONNECT SERVICE: TYPE OF INSPECTION REQUESTED: ❑ CONFERENCE ❑ STATUS CHECK BUILDING: ❑ FOOTING ❑ DECK FOOTING ❑ FRAMING ❑ DRYWALL ❑ FINAL ❑ PARTIAL f> CITY OF BLAIR ❑ WASHINGTON COUNTY ❑ OTHERS ❑ ❑ COMMENTS: LOCATION OF INSPECTION NAME OF OWNER' ✓ r , r`+� x CONTRACTOR ❑ DATE INSPECTION REQUESTED ❑ TIME INSPECTION REQUESTED: PERMIT NO: TYPE OF INSPECTION REQUESTED: ❑ CONFERENCE ❑ STATUS CHECK BUILDING: ❑ FOOTING ❑ DECK FOOTING ❑ FRAMING ❑ DRYWALL ❑ FINAL ❑ PARTIAL PASSED FAILED ❑ ❑ COMMENTS: UTILITIES: ❑ SEWER TAP ❑ SEWER ❑ SEPTIC ❑ WATER TAP ❑ REMOTE ❑ WATER SERVICE PASSED FAILED ❑ PARTIAL ❑ ❑ COMMENTS: ELECTRICAL: ❑ ROUGH IN ❑ FINAL ❑ PERMANENT SERVICE NTEMPORARY SERVICE ❑ PRECONNECT PASS AILED ❑ PARTIAL ' F{ COMMENTS: MECHANICAL: ❑ ROUGH -IN ❑ A/C ❑ FURNACE ❑ RADIANT HEAT ❑ FINAL ❑ PARTIAL PASSED FAILED ❑ ❑ COMMENTS: PLUMBING: ❑ GROUNDWORK ❑ ROUGH -IN ❑ FINAL ❑ WATER METER INSTALLED ❑ PARTIAL PASSED FAILED ❑ PRESSURE TEST ❑ ❑ COMMENTS: ❑ OCCUPANCY GRANTED CONDITIONQAL OCCUPANCY GRANTED NOTES/REMARKS: /❑ �"�� �" ` D�PD\BURT REA -'?Mn/6-3-5 DATE OF INSPECTION MADE: 0 _ �` T 4 � TO CONNECT SERVICE: BY R_ jj.,'jeS a �rAN,fEX�� 6/1/2010 I M 05085-10 Mark Lawlor Boyd Jones Construction 4360 Nicholas Omaha, NE 68131- (402) 553-1804 NEBRASKA STATE FIRE MARSHAL PLANS DIVISIONCode Review nvl:. �F8 R ASS P Novozymes Administration Building 600 South First Street Blair 68008- 13 Lf If Your items have been reviewed for compliance with the Nebraska State Fire Marshal Act. Final Architectural Plan New Building REMARKS: Plan review applies to the security training building. Occupant load 37. 1. Dead end corridors shall not exceed 20 feet. LSC 38.2.5.2 2. Mechanical room shall be separated by one-hour rated construction extending from the floor to the underside of the roof deck or to a rated ceiling assembly, the doors shall be 45 minute fire resistance rated and self closing. LSC 38.3.2 3. A portable fire extinguisher shall be installed, maintained and inspected in accordance with NFPA 10. LSC 38.3.5 4. Restrooms 103 and 104, two doors in a series, the minimum space between two hinged or pivoting doors in a series shall be 48 inches plus the width of any door swinging into the space. Doors in a series shall swing either in the same direction or away from the space between the doors. NAG 4.13.7 This code review does not guarantee compliance with the Federal Americans with Disabilities Act. cc. District B Blair Codes Page 1 of 2 PLEASE CONTACT OFFICE INDICATED BELOW FOR A FINAL INSPECTION. FINAL 01IZITE APPROVAL IS REQUIRED PRIOR TO OCCUPANCY OR USE. SIGNED: Reviewed By: Main Office 246 South 14th Street Lincoln, NE 68508-1804 (402) 471-2027 Jim Kenney Contact for Inspection: District B 438 W Market Albion NE 68620-1241 (402) 395-2164 6/1/2010 I M 05085-10 Mark Lawlor Boyd Jones Construction 4360 Nicholas Omaha, NE 68131- (402) 553-1804 Novozymes Administration Building 600 South First Street Blair 68008- L� If0 Your items have been reviewed for compliance with the Nebraska State Fire Marshal Act. Final Architectural Plan New Building Alt Phone: Email: mlawlor@boydjonesconstructi Occupancy Type: Industrial Construction Type: wood frame 1,620 SF Estimated Start Date: 6/1/2010 Estimated Completion Date: 9/1/2010 Fire Protection Features: Sprinkler Total ❑ Spinkler Partial ❑ Range Hood System ❑ Sprinkler Other: Fire Alarm Manual Sys. ❑ Smoke Detection ❑ Heat Detection ❑ Fire Alarm Other: Page 2 of 2 PLEASE CONTACT OFFICE INDICATED BELOW FOR A FINAL INSPECTION. FINAL MITE APPROVAL IS REQUIRED PRIOR TO OCCUPANCY OR USE. ■ Reviewed By: Main Office 246 South 14th Street Lincoln, NE 68508-1804 (402) 471-2027 Jim Kenney Contact for Inspection: District B 438 W Market Albion NE 68620-1241 (402) 395-2164 NOTES/REMARKS- INSPECTOR- �� S"/�.� DATE OF INSPECTION MADE: ®� TIME FAXED OPPD\BURT REA TO CONNECT SERVICE: ON BY BUILDING INSPECTION «„,CITY OF BLAIR ❑ WASHINGTON COUNTY ❑ OTHER LOCATION OF INSPECTION • , , °�� NAME OF OWNER: r F ? F r r ., E �'? 7 , " . __ CONTRACTORS` ..a' 1 ,.°� ;' " �� ;, ,c .a " DATE INSPECTION REQUESTED' TIME INSPECTION REQUESTED"` a' k "' PERMIT F NO. 3 f` TYPE OF INSPECTION REQUESTED: ❑ CONFERENCE ❑ STATUS CHECK BUILDING: ❑ FOOTING ❑ DECK FOOTING ❑'" G ❑ DRYWALL ❑ FINAL ❑ PARTIAL PASSED FAILED COMMENTS: ❑ UTILITIES: ❑ SEWER TAP ❑ SEWER ❑ SEPTIC ❑ WATER TAP ❑ REMOTE ❑ WATER SERVICE PASSED FAILED ❑ PARTIAL ❑ ❑ COMMENTS: ELECTRICAL: ❑ ROUGH IN ❑ FINAL ❑ PERMANENT SERVICE ❑ TEMPORARY SERVICE ❑ PRECONNECT PASSED FAILED ❑ PARTIAL ❑ ❑ COMMENTS: MECHANICAL: ❑ ROUGH -IN ❑ A/C ❑ FURNACE ❑ RADIANT HEAT ❑ FINALm ❑ PARTIAL PASSED FAILED ❑ ❑ COMMENTS: PLUMBING: ❑ GROUNDWORK ❑ ROUGH -IN ❑ FINAL ❑ WATER METER INSTALLED ❑ PARTIAL � PASSED FAILED ❑ PRESSURE TEST ❑ ❑ COMMENTS: ❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED NOTES/REMARKS- INSPECTOR- �� S"/�.� DATE OF INSPECTION MADE: ®� TIME FAXED OPPD\BURT REA TO CONNECT SERVICE: ON BY ❑ CITY OF BLAIR LOCATION OF INSPECTION - NAME OF OWNER• ❑ WASHINGTON COUNTY ❑ OTHER N W► b N ❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED v'X z, �s 4 e,K INSPECTOR �/ DATE OF INSPECTION MADE:_` ®(6 7IMF�� 0 FAXED OPPD\BURT REA TO CONNECT SERVICE: ON BY I DATE INSPECTION REQUESTED < TIME INSPECTION REQUESTED ' "� PERMIT NO � TYPE OF INSPECTION REQUESTED: ❑ CONFERENCE ❑ STATUS CHECK BUILDING: ❑ FOOTING ❑ DECK FOOTING ❑ FRAMING ❑ DRYWALL ❑ FINAL ❑ PARTIAL PASSED FAILED ❑ ❑ COMMENTS: UTILITIES: ❑ SEWER TAP ❑ SEWER ❑ SEPTIC ❑ WATER TAP ❑ REMOTE ❑ WATER SERVICE PASSED FAILED ❑ PARTIAL ❑ ❑ COMMENTS: ELECTRICAL: ❑ ROUGH IN ❑ FINAL ❑ PERMANENT SERVICE ❑ TEMPORARY SERVICE ❑ PRECONNECT PASSED FAILED ❑ PARTIAL ❑ ❑ COMMENTS: MECHANICAL: ❑ ROUGH -IN ❑ A/C ❑ FURNACE ❑ RADIANT HEAT ❑ FINAL ❑ PARTIAL PASSED FAILED ❑ ❑ COMMENTS: PLUMBING: ❑ GROUNDWORK ,El` ROUGH -IN ❑ FINAL ❑ WATER METER INSTAL PASSED FAILED El PRESSURE TEST AA C�� 4 4-44o {< /' — e � COMMENTS: ❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED v'X z, �s 4 e,K INSPECTOR �/ DATE OF INSPECTION MADE:_` ®(6 7IMF�� 0 FAXED OPPD\BURT REA TO CONNECT SERVICE: ON BY ❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED NOTES/REMARKS- P INSPECTODATE OF INSPECTION MADE: TIME- FAXED IM • FAXED OPPD\BURT REA TO CONNECT SERVICE: ON BY BUILDING INSPECTION REPORT ❑. CITY OF BLAIR ❑ WASHINGTON COUNTY ❑ OTHER LOCATION OF INSPECTION: tt /°*` a NAME OF OWNER f "� ` ` CONTRACTOR. ,w s DATE INSPECTION REQUESTED- TIME INSPECTION REQUESTED PERMIT NO - TYPE OF INSPECTION REQUESTED: ❑ CONFERENCE ❑ STATUS CHECK BUILDING: ❑ FOOTING ❑ DECK FOOTING ❑ FRAMING ❑ DRYWALL ❑ FINALE] PARTIAL PASSED FAILED COMMENTS: UTILITIES: ❑ SEWER TAP ❑ SEWER ❑ SEPTIC ❑ WATER TAP ❑ REMOTE ❑ WATER SERVICE PASSED FAILED ❑ PARTIAL ❑ ❑ COMMENTS: ELECTRICAL: ❑ ROUGH IN ❑ FINAL ❑ PERMANENT SERVICE ❑ TEMPORARY SERVICE ❑ PRECONNECT PASSED FAILED ❑ PARTIAL ❑ ❑ COMMENTS: MECHANICAL: ❑ ROUGH -IN ❑ A/C ❑ FURNACE ❑ RADIANT HEAT ❑ FINALE] PARTIAL PASSED FAILED COMMENTS: PLUMBING: ❑ GROUNDWORK ❑ ROUGH -IN ❑ FINAL ❑ WATER METER INSTALLED ❑ PARTIAL PASSED FAILED COMMENTS Ej`,:,PRESSURE TEST g6 Uo ri U"'t, N-1 K ❑ ❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED NOTES/REMARKS- P INSPECTODATE OF INSPECTION MADE: TIME- FAXED IM • FAXED OPPD\BURT REA TO CONNECT SERVICE: ON BY ❑,,.CITY OF BLAIR LOCATION OF NAME OF ❑ WASHINGTON COUNTY 4 ❑ OTHER CONTRACTOR - DATE INSPECTION REQUESTED TIME INSPECTION REQUESTED- _ `PERMIT NO• TYPE OF INSPECTION REQUESTED: ❑ CONFERENCE ❑ STATUS CHECK BUILDING: ❑ FOOTING ❑ DECK FOOTING ❑FRAMING ❑ DRYWALL ❑ FINAL ❑ PARTIAL ASSED FAILED El COMMENTS: UTILITIES: ❑ SEWER TAP ❑ SEWER ❑ SEPTIC ❑ WATER TAP ❑ REMOTE ❑ WATER SERVICE�PASSEDFAILED ❑ PARTIAL ❑ ❑ COMMENTS: ELECTRICAL: ❑ ROUGH IN ❑ FINAL ❑ PERMANENT SERVICE ❑ TEMPORARY SERVICE ❑ PRECONNECT PASSED FAILED ❑ PARTIAL ❑ ❑ COMMENTS: MECHANICAL ❑ 'ROUGH -IN ❑ A/C ❑ FURNACE ❑ RADIANT HEAT ❑ FINAL ❑PARTIAL PASSED FAILED COMMENTS: PLUMBING: ❑ GROUNDWORK ❑ ROUGH -IN ❑" FINAL 'F1 WATER METER INSTALLED ❑ PARTIAL PASSED FAILED ❑ PRESSURE TEST ❑ ❑ COMMENTS: ❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED �w m o0 • _s INSPECTOR / 0 d v �inp� `�(KJ OF INSPECTION MADE:— (1cAb�s�` FAXED OPPD\BURT REA TO CONNECT SERVICE: ON B ]BUILDING INSPECTION CITY OF BLAIR ❑ WASHINGTON COUNTY ❑ OTHER LOCATION OF INSPECTION � V� ��NAME OF OWNER. r QCONTRACTOR: t, > r F DATE INSPECTION REQUESTED TIME INSPECTION REQUESTED. PERMIT NO E TYPE OF INSPECTION REQUESTED ❑ CONFERENCE ❑ STATUS CHECK BUILDING: ❑ FOOTING ❑ DECK FOOTING ❑ FRAMING L ❑ FINAL [�, PARTIAL PASSED FAILED El COMMENTS: ir. . J v UTILITIES: ❑ SEWER TAP ❑ SEWER ❑ SEPTIC ❑ WATER TAP ❑ REMOTE ❑ WATER SERVICE PASSED FAILED [_1 PARTIAL F] ❑ COMMENTS: ELECTRICAL: ❑ ROUGH IN ❑ FINAL ❑ PERMANENT SERVICE ❑ TEMPORARY SERVICE ❑ PRECONNECT PASSED FAILED F1 PARTIAL ❑ ❑ COMMENTS: MECHANICAL: ❑ ROUGH -IN ❑ A/C ❑ FURNACE ❑ RADIANT HEAT ❑ FINAL ❑PARTIAL PASSED FAILED ❑ ❑ COMMENTS: PLUMBING: ❑ GROUNDWORK ❑ ROUGH -IN ❑ FINAL ❑ WATER METER INSTALLED ❑ PARTIALS PASSED FAILED ❑ PRESSURE TEST ❑ ElCOMMENTS: ❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED NOTES/REMARKS: ! �t 4 P�d (J l GX e T/S iJ Imo{ c* do co INSPECTOR/ .p DATE OF INSPECTION MADE: `" `` % b TIME• __ FAXED OPPD\BURT REA TO CONNECT SERVICE: