Loading...
BP13339 rw 0' C)h.i-f/ ~ ~ (JU~ CITY OF BLAIR - APPLICATION FOR BUILDING PERMIT Permit # j:3 33 cf Date: '0 I?:>o 10<1 Approximate Completion Date: -1-' - 30- 0 q Site Plan Attached: REScheck Attached: Complete Plans Attached Application for: Residential Commercial/Industrial _ New Construction Manufactured Home Modular Move-on: Home _ Accessory Building Other Remodel Addition Accessory Building: Garage _ Pole Barn_ Other Floor Type: Dirt Concrete _ Electricity: Yes _ No _ Sign Erecting, Awnings ~ Decks/Handicap Ramps (plot plan required) _ Satellite Dishes/Radio ~na/Cell Towers (plot plan required) _ Other Utilities: Public Water: Yes_ No Private Well If yes, responsible entity: Blair OPPD Line Kennard Agreement needed: _ Date Agreement Received: _ Public Sewer: Yes_ No Septic Drawing Provided: _ If yes, responsible entity: Blair _ Kennard County Road Permit Required: Yes_ No _ Submitted: Yes _ No _ Additional Description of project if necessary: St 'j nS- ~(ec f-flJ(o.v/ wJtl be Qddu~ Proiect Information: Job Address: '2-\ r s' ~ 1- "" 3)~ZI/i ;21 P Z o~ Legal Description (if applicable) j 1Le Owner: ~ 0, ~ 81cJ{)3C1830 Address: ~ Phone#: Contractor: CD;:) Sigil lfJ ' Address: '2\ q 2...a P{ (JI.-Hevu.-v1 eel C~'f..{v:), lo $502.~ ~ \ Cell #: Phone #: 2-00 Separate permits are required for electrical, plumbing, hearting, ventilating and air conditioning, and septic systems. By my signature below, I acknowledge this building permit application does not constitute issuance of this building permit. I further agree that construction covered by this permit application shall not be commenced until I have received a copy of a permit signed by the Building Inspector. I hereby agree to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes/ordinances of the City of Blair and the State of Nebraska. I understand that this permit is void if work is not commenced within 180 days or is not completed within two (2) years of date of issue. Signature of Owner/Contractor Date For Building Permits other than One & Two Family Residential Structures: ~I e e y cknowledge and agree that ave/will submit a set of plans for this project to the Nebraska State Fire Marshal's Office for Review.') l' 'V:~ (tJ (':SC) 0 CI t' of Own r/Contractor Date . ' ZONING REVIEW: Zonim!/Flood Plain/Utilities: Current Zoning: Conditional Use Permit Required: Yes _ No_ Date CUP Approved: Yes No Variance Required: Yes _ No_ Second Front Side Side Rear_ State Fire Marshal Required: Minimum Setbacks: Front lot Square Footage: length x Width: lot Coverage % Driveways/Sidewalks: Sidewalk required: Yes_ No_ Sidewalk Waiver: Yes Date Waiver Approved: Preexisting Garage requires driveway to be less than 3' from property line: Yes_ Approved by: No Flood Plain: Yes No If yes, specify special requirements: BUilDING INSPECTOR REVIEW: Number of Stories One Two Th ree Four >Four High Rise (>75 ft)_ Type of Residential Structure: Ranch _ Two Story _ Split Entry _ Raised Ranch _ Other Rooms _ Bedrooms _ Bathrooms _ Fireplaces _ Gas_ Electric_ Egress in Basement: Required: Yes _ No _ Provided on Plans: Yes No Sleeping Rooms Living Area Other Egress Sauare Footage: Main level: Basement: (Unfinished) Garage: Detached Garage: Addition: Porch: Front Deck that affect setbacks: Second level: Third level (Finished) 2 bay_ 3 bay_ 4 bay_ 5+ bay Pole Barn: Remodel: Side Front Side Rear Rear Occupancy Classification: Assembly, theaters, with stage Assembly, theater, without stage _ Assembly, nightclubs _ Assembly, restaurants, bars, banquet halls _ Assembly, churches _ Assembly, arenas _ Assembly, general, community halls, libraries, museums _ Business Educational Factory and industrial, moderate hazard _ Factory and industrial, low hazard _ High Hazard, explosives _ (section continued on next page) High Hazard HPM Institutional, incapacitated _ Institutional, day care facilities _ Residential, multiple family _ Residential, care/assisted living facilities Storage, moderate hazard _ Storage, low hazard _ Utility, miscellaneous _ Institutional, supervised environment _ Institutional, restrained _ Mercantile Residential, hotels _ Residential, one- and two-family Is building reauired to be protected by automatic fire sprinkler svstem?" No Only partially in some areas or rooms Please Specify Yes _ If yes, the standard to which the sprinkler system will be designed: NFPA 13 NFPS 13R NFPA 13D Driveway Grade: 20% grade or less? Yes _ No_ (Dale will review new residential construction. AI will review all second access requests and industrial and commercial driveway requests) Required Off Street Parking: Permit Fee Calculation: Suildim! Permit Deposit Fee: Commercial, new homes and residential additions/remodels/accessory buildings valued $10,000 or greater $ Fee - $500.00 Residential additions/remodels/accessory buildings valued under $10,000 $ Fee = $200.00 All other permits Fee = $50.00 $ RESIDENTIAL - NEW CONSTRUCTION: Permit fee is: Finished sqjft area (not including finished basement area) Finished basement sqjft area Unfinished basement sqjft area Garage sqjft area Total Valuation: X$92 X $56 X$29 X$25 $ $ $ $ $ $ Total Valuation Multiplied by 0.006 = Issuance Fee: $ $ 25.00 Total Permit Fee = Deposit + Permit Fee + Issuance Fee RESIDENTIAL - ADDITIONS / REMODELS and COMMERCIAL - NEW CONSTRUCTION / ADDITIONS / REMODELS: Businessjl nd ustrial/Ed ucationa 1/ Assem blyjF actoryjStoragejUtility *Porches with roofs/screened patios are considered additions Construction valuation computation: Sqjft area X $63 Except for the followin~: Accessory Buildings & Interior Remodeling Proiects: sqjft area X $43 Pole barns with no hard surface floor: sqjft area X $25 Si~n Erecting/Awnings and Decks/Handicap Ramps: sqjft area X $25 (Minimum valuation of $2000) - '6/0 ,~,ft. . . . 1 s( (J \1\ Construction valuation computation: Finished sqjft area Z,^c:I S/91\ ::.- 3S~ 2,% -::.. 2- L{ - <;{~ '7 ~o ,llf X$ ~,S- $ ) :'>-03_ S~O Construction valuation is ...................................Permit fee is: $0 TO $50...........................................................$0 $51 TO $500........................................................ $25 $501 TO $2,000........................................................ $25 + $3 per additional $100 $2,001 TO $25,000........................................................ $70 + $13 per additional $1,000 $25,001 TO $50,000......................................................$370 + $10 per additional $1,000 $50,001 TO $100,000......................................................$620 + $7 per additional $1,000 $100,001 TO $500,000......................................................$970 + $5 per additional $1,000 $500,001 TO$1,OOO,OOO.................................................. $2,970 + $4 per additional $1,000 $1,000,001 AND OVER.................................................. $4,970 + $3 per additional $1,000 Permit Fee calculated from chart above $ B 5'. CO Issuance Fee: $ 25.00 50,CU $ / ex),- ()() Total Permit Fee = Deposit + Permit Fee + Issuance Fee Additional Comments: Approved by: I) <~).... I ,> < iA .1,. j" 'If f, j,;,',,/Kf >"', ii/V'" 1 "',~" I Date: II ? ()'1 Contingent On Approval by Fire Marshall Meet IBC, IPC, IMC and NEC Code Requirements Sleeping Rooms below Story and in Basement required to have egress For Office Use Only Date Permit Paid: Permit Fee: Deposit Amount Receipt # Deposit Paid by for return to: Building Inspection Pouch given: Yes _ No CITY OF BLAIR, NEBRASKA Phone 402-426-4191 RECEIVED OF: ADDRESS CITY, STATE, ZIP CODE THANK YOU KEEP THIS COPY FOR YOUR RECORDS, NO RECEIVED BY Pounds Printing, Blair, NE 68008 lL\' ~* 1/,..P \ (;) V 0cc- y. ~\ ~ 't- . h /\(v\ tstJ~ t \ t-- 0 tA, 5" '3 ~~> ce-J.-- ~.t2..- ,<::/; '(:7{, 0- LJL \ ~~ c9-- ~~Ck l\ _ {r VA . ,L-(.C/l-' 6 f \ ~t.>> f}eJ) \.l ~e ~CV\.f r" " ~ d-t'x-Cs ~'-~ l c: ~'5 \2ace~ 6 l cOeu (C;' u...J w LC) C t{e.- f:T' G l4 13 CA-( ~ ... "-.) E ... 4S ~"IIIII ~ ~ :: In n ~ - ~G1 ;zm .... ~gm ""'. ~ . ~ ~ ~ u u CI:l (l) (l) ~ en VJ Cb riQ"ciQ" ~ ::l ::l (l) ~ Z ~ .. 0 0 : . ? l' >- Q g 8: (ii' e Cil g o' Ul ? Ul c... > ~ t!'j 00 00 "'tI o ~ 00 t:= > ~ Ro C'.l ~ t"" t"" IJ:i s- :=;. Z trl ..... '-< C:l c:r"::l ""C:j ::;'.....:J ~ ~ ~ 5' = ~ V;' [ ~ ~ ~t~ ;. g. ~. V;' ::"~~~~'-<::lg =. 2. :::5 Vi ~ g- ~ =' ~ 0 a. 2. n o..~. ~ ~. g- CY ~ B; g' ~. <: :-' ~ ~ '--< ~d ;: 5. ? s:- g g ~ ~ ~ ~ ~ ~ ~ ~.~] s' g ~ o~ a 2 ~ S. ~. ~ ~ ~ ~ ~. S:Jg~,<:::-.~r.s N' tn {J': C'll a (".l rD f'tl ......::: ;;-: (1) t:.:l c.. c..On~~:::c:r s::: C:l 0"'0 0..0...:::: ~~~=;!~n ~ g 0 g Vi' ~ g; @~;a8a~ "g c ~ <.=.::: ~ 0":: t ~ ~ 11~: ~ ~ o '" rr It....,)> ..- ..0)_ ~ -n-- tll -,CD ::E ::J ::J c.._, tll tll~, o ;;::J ::J S. - c.. to 00 ~ -,tll i5:_::J::J CD :::!. ~ a. n n tll CD oe!.~m 3 ::r c.. n "'Co_=:- tll 0 0 o' ::J ^ tll '<cc- '-orn _000 0-03 o-CD-o CD 9, 0 (") ~~ o tll ::J 3g:u;- ~::Jtll CDoo~ CD' CD c.. C r uCl:lu"OulJ:i ~~~ae~ ct[ct~~~ ~ .. o' ? ~\t ~ ~ '"', ~' <:::> ~ I ". I .' ../ '. I ~~ ~ -+:; ~ '" w & .,. b ... """ , ......~ C) "" ('\L1 Vi ~ :' "'I -1- " t (j)t-, o w CD ~ 1\ ;:-- ~ ""1)' "3', ..l.., \ (' I \.,..J ~ ~ [' !' ,. \. ~L!::: " ~ ),.. ~ .+, ~~ l-'I ~ &. ,.......1' ",.. o 01 " .. rt- \" 0, .... f\ t." )." .,,;: (. ~ i I r !! "'0 "'0 lIJ ::D C ~ C m lIJ I C Z C Z CJ ( 0 m z z ~ "'0 :E (j) (j) '- --I ... 0 ~ ::D ^ F en ~ r. ~ re. :XJ c::> rn C"? ' C) ~ !"'-oJ rn CD '2 '25 = rn c.CJ c::J ~ '" ~ ~ : [N ~ (, 0 ~ "" 0 z i= z m v\, ~ r- ~ ~ r- Ji L 'n ~ 7-? 0 rri ------------ ~ ~ ~ I r- eee ~5 zC -tz ~-I m zC o -I :::0 o ::tI U)~ 8 0 -m (!) :E ~ ~ e. VI ;;'., ~ ..L-.; ~. k ~ -0 c;) :::-- cee c;)ooe~e ~~~~~~~~~~ o C""J 3::em . - r- CJ ""C :5 g ~.g;~~~~~. ~~~~.~~~~~[ p ~CL::rC.CCDC"JtJ:I ~ ~~5!~=;;m;; r- ~~a~~.~~R ~ ~g~~~:;!~.~ c ~g;g3g9[3 a. ~ :::l.. C""J en . CIJ ~ ncc_=.,,:c ~_ ~ ~~~"C~['" -- ~ ~~s "'...,; CD' Q:I <' co. '" '" "'C ~ ~ ~ ~. =r . ~..: co. co. ~ ~ c g ~. c;; ~ ~ lJ ""1"\ ~ e;- ~ ~ ;. ? c ~ 0/'. en :g <: " en i c "', ..... I , ~.~ ,-' . ~ ,......, . ...,,, ~, I " ~ ~- , ~""... ~ ....., ~, I. ' . h-,'-'" , IR1 ~ ~ 'I (friJ r-l I :r-,.... , I i , ' ~ I, ~l 1 ' ~ ~ j ......., "~ I 1111 ~......... ;/. ..I' , ..?'. I ! ~ I (~J ~ 1 ',~"- :e:lJ -''" : ~B-: '~~ :! i'<li~ f- II~ ~~, '~.G ~ II ~~; () I~ I~ I I ,..,.,., 8 .~ ! '~r~'1 --V '~r ,~'.. 1\"''"'" L. ........ ^ " \. \-., :"" -. ..........'. " -.' t'i ~~, ~ ji ...' ~ .... rI'....~. ......."'.. . IIU )>:3~=~S:: =ocC_w ~ 5 :3 ~. CD ~ ~ CD S' ffi (il OJ' -c..C-wo :::!" :3 CD ..., C- O c..CD..., ~ Ol~u:!CD ~ 0 -. - w o CDS'c..:::l ..., ~ CDc.. 7' w;;o CD _. - '< m-o :::l o S'O~!!l. 0- W r~~ CD -m:::J- C (ii' 0 OJ~ r -g!'l S;:'Q' ~ -. -i () :::l -0 ~:::J^CD ..., CD CD fJl ~ c.. -0 ro CD CD ~O..-"- c.. o~~s. :3 CD :::l _. W ~ _fJl ~ ncOCD :::J-o ;;0 3 S'"'Q..)> ~ CD ~ Z-< ""O()= ~:,mc Q. :::J OJ' :3 w CD 0 S' g~m~ _- CD o~~c.. ~ fJl ~ 0 :::J~:::J:::J -. -' OJ w o = r:::l :::Jo-)>:::l S'CD()~ CDO^CD ~~s:~ CDCD:3(il (ilc..ow w S't\) fJl ..., fJl -:? fJl CD -. :::J ~l'Oo w w ~ :::l ro ? i3\. (0 !~ -''I c...c 0 0 en )> O'TIIIJ :D )> -..., en ~ )> r" ,IJ C <10 (5002< -I:D 0)> - s;: '-l r Zo 0 -I OJ :t> 'TI-m(J) . 0 OZO)> -I 0 IOZ:n m'TIenm :D-I-Ifj) I::OC O c_ mrr:~ :D""tJO Q:O-lO ZOO"TI )><OJ)> Zenmz 0-)> mOZZ en enZ )::> (J) -""1J ~O'1Jm "TI:11() -I ,0-1 I-j<- -I)>O enmr-z I "'0 ~ t-i Z 0 . . -.... ~ & -i) (j) () o "'U m o T1 ~ o ;;0 ^ (j) o w ~ w ~ 11 --" ~~ ~ ~ c:: IMJ C') :::r t>> :::> ~ 0- "" ~ :::r t>> <: '" '" ~ ~ =< '" '" ~ m ;:: 0 ;! C -0;;0 0 m m .- o m 00 .- ::;: 0 n CD en' !'; .- :;0 en fJlm 'U () 0- ~ ~ -< ..... ~ 0 :::::!. ~ z () =;' ~' Ol ~ (D () 3 () Ol ~ 0 ::J en ~ '" I~ < en I 0 ~ ..,.'" N~ni ;:: ~I~~ ~i~~ :5 C-c ?l" 3-< ~ roo"TI [!l Z Ol "" cr en ~.. () Ol ..... O' ::J (f) -g () ~ '" ~~ en () ~--; ~~ 0 DiD ::J en ~~ n ~~ ~ ~~~ I I ~fT , )> C C ~ m en en ~ ~ L-::J, ~ "1: ~ 1-' " - r- m () o -0 -< Howard Wolfe From: Sent: To: Subject: Attachments: Jay Muller [JayMuller@cbssigns.com] Friday, November 06, 2009 8:40 AM Howard Wolfe Installation information on signs for Blair Plaza Blank Bkgrd.gif; CBS 123131.jpg; 101_0187,JPG; 101_0188,JPG Howard Let me know if you need anything else Jay Muller CBS Sign Co Office: 402 332-0080 Cell: 402740-1784 1 BUILDING INSPECTION REPORT , E]'- -' CITY OF BLAIR ❑ WASHINGTON COUNTY ❑ OTHER LOCATION OF INSPECTION - NAME OF OWNER J� CONTRACTOR Ko% - my r. DATE INSPECTION REQUESTED TIME INSPECTION REQUESTED: A PERMIT NO: TYPE OF INSPECTION REQUESTED: ❑ CONFERENCE ❑ STATUS CHECK BUILDING: F FOOTING ❑ DECK FOOTING E:l FRAMING E:l DRYWALL F INAL ❑ PARTIAL R4SSED FAILED F-I COMMENTS: UTILITIES: F SEWER TAP ❑ SEWER ❑ SEPTIC WATER TAP ❑ REMOTE ❑ WATER SERVICE PASSED FAILED [_1 PARTIAL F ❑ COMMENTS: ELECTRICAL: F ROUGH INF FINAL F PERMANENT SERVICE ❑ TEMPORARY SERVICE ❑ PRECONNECT PASSED FAILED ❑ PARTIAL 1 F COMMENTS: MECHANICAL: ❑ ROUGH-IN ❑ A/C ❑ FURNACE ❑ RADIANT HEAT ❑ FINAL ❑ PARTIAL PASSED FAILED COMMENTS: PLUMBING: F GROUNDWORK F ROUGH-IN ❑ FINAL ❑ WATER METER INSTALLED ❑ PARTIAL PASSED FAILED ❑ PRESSURE TEST ❑ ❑ COMMENTS: ❑ OCCUPANCY GRANTED ❑ CONDITIONAL OCCUPANCY GRANTED NOTES/REMARKS - n INSPECTOR DATE OF INSPECTION MAD TI F. FAXED OPPD\BURT REA TO CONNECT SERVICE: ON By