Loading...
2022-05-12 Water Tower Experts-PaintingCONTRACT FOR SERVICES This contract made and entered into this 12 - day of May, 2022 , by and between BLAIR, NE -hereinafter called the "Owner" or "Customer" and Maguire Iron, Inc., a South Dakota Corporation with its principal office located in Sioux Falls, South Dakota, hereinafter called the "Contractor" or "Company" for and in consideration of the mutual covenants and promises hereinafter contained. Blair 1 MMG Composite Tank / Exterior and Interior Paint WITNESSETH: Contractor agrees ' to make the following repairs and improvements on the Owner's water supply tank, and to furnish the necessary equipment, labor, material, as well as Workmen's Compensation Insurance and Contractor's Liability Insurance, and to do the work hereinafter stated in a good and workmanlike manner. Exterior Renovation • Contractor will pressure wash the complete exterior (1100%) in accordance with SSPC SP No. 12. • Contractor will SSPC SP No. 2 / 3 Hand tool clean / Power tool clean all rusted areas. • Contractor will apply one (1) spot coat of epoxy to the rusted and abraded areas. Coatings shall be applied to manufacturer's recommended film thickness (2.0 - 4.0 mils DFT). - Contractor will apply one (1) finish coat of polyurethane to the complete exterior (100%) shall be applied to the manufacturer's recommendations (2.0 - 3.0 mils DFT). Interior Wet Renovation - Contractor will abrasive blast clean the complete interior (100%) to an SSPC - SP No. 10 "Near White Metal". After abrasive blast cleaning, all surfaces shall be cleaned of any dust residue or foreign debris. - Contractor will apply one (1) prime coat of NSF -61 approved zinc rich primer to the complete interior (100%) shall be applied to manufacturer's recommended film thickness (2.5 - 3.5 mils DFT). - Contractor will apply one (1) additional coat of NSF -61 approved epoxy to be applied by brush and roller to all edges, weld seams and sharp angles. - Contractor will apply one (1) finish coat of NSF -61 approved epoxy to the complete interior (100%) shall be applied to the manufacturer's recommendations (8.0 - 14.0 mils DFT). Portable Pressure Tank Rental Generator Rental and Hook Up Dicks Electrical Generator Hook up and Removal Interior Wet Disinfection Method • Contractor will disinfect the interior of the tank as per AWWA Standard C652-02, Chlorine Method #3 prior to the owner filling the tank. • Water samples and testing is the responsibility of the owner. Additional Items • Maguire will provide (2) portable pressure tanks for the city and assist with hook up while tower in drained. • A generator will be provided as a back up power source for pumps in case of power failure. • This project comes with a 2 year labor and material warranty. • This project includes site clean up upon completion of the project. • All state required permits for this project will be the responsibility of Maguire iron to obtain. The city will be responsible for water testing upon completion. Owner will inspect the work as it progresses and upon completion and acceptance by Owner of the above work, the sum of $ 426,410.00 plus applicable sales, excise, and/or use tax shall become due and payable in full. Terms: Net 30 days from acceptance and invoicing, plus applicable sales, use, excise, transfer or similar taxes required by law. A service charge of 1 Y2% per month (annual rate of 18%) will be charged on past due accounts. During any exterior painting, Owner shall assist in removing any vehicles in the area which might receive paint damage. Contractor will exercise reasonable care and caution to avoid, but will accept no liability for damage to antenna, communication, telemetry and/or electrical system(s) which may be attached to the structure. Removal, repair and/or replacement of the antenna, communication, telemetry and/or electrical system(s) shall be the responsibility of the Owner. Contractor may apply a temporary surcharge to amounts otherwise payable under this Agreement to reflect significant cost increases for materials, supplies, and/or fuel during high inflationary periods. Owner and the authorized agents signing this contract as such agents do hereby expressly warrant that Owner has authority to make and enter into this contract and that it becomes a party hereto pursuant to a lawful resolution duly and regularly adopted by the governing board of said Owner pursuant to the applicable statutes of this State. Customer shall reimburse Company for all travel, meal and entertainment expenses incurred by Company and its employees in connection with Company's performance under the contract. To the extent that any meal or entertainment expenses incurred by Company or its employees are subject to the limitation on deductibility under IRC Section 274(n) (1) and the Regulations thereunder, Customer shall be subject to the limitation and shall reduce its deduction accordingly. This is included in the contract amount. The owner will be responsible to the Company for the cost (at current market rates) of any work that has been performed prior to termination. HAZARDOUS MATERIAL DISCLAIMER: In the event that hazardous materials are on the water tank and this information is not addressed in the specification or made known to Maguire Iron, Inc. prior to the price or bid being supplied by Maguire Iron, Inc., any additional means of hazardous material abatement or disposal costs will be born upon the Owner. This constitutes the entire contract. No verbal agreements or additions will be honored. Any amendments or additions hereto must be in writing and executed by the duly authorized agents and officers of the parties hereto. IN WITNESS WHEREOF, we have set our hands and seals the day and year above written. Owner: BLAIR, NE By: (Name) (Tftle) By: -4 _Aft � 4 (Name) (1-itle) Date Accepted: /'76 ?,?— Upon acceptance, please provide two (2) signatures and date the agreement. MAGUIRE IRON, INC. By: Jake Duffer 05/12/2022 (Authorized Agent) (Date)