Loading...
2021-26RESOLUTION NO. 2021-26 COUNCIMEMBER WILLIS INTRODUCED THE FOLLOWING RESOLUTION: WHEREAS, pursuant to Resolution Number 2021-2, the Mayor and City Council of the City of Blair, Nebraska, adopted the Year 2021 One- and Six -Year plan for the construction and maintenance and repair of the streets of the City of Blair, Nebraska, WHEREAS, certain amendments have been made to said One- and Six -Year Plan necessitating and amendment to such Plan, BE IT RESOLVED by the Mayor and City Council of the City of Blair, Nebraska, that the Year 2021 One and Six Year plan for the construction and maintenance and repair of the streets of the City of Blair, Nebraska, as prepared by the City Street Superintendent and dated January 26, 2021, be hereby is amended to add the 10th Street Improvement Project from Wilbur Street South to Highway 75. BE IT FURTHER RESOLVED that the amendments to said One- and Six -Year Plan be filed with the Department of Transportation, State of Nebraska. COUNCIL MEMBER WILLIS MOVED THAT THE RESOLUTION BE ADOPTED AS READ, WHICH SAID MOTION WAS SECONDED BY COUNCIL MEMBER RUMP. UPON ROLL CALL, COUNCIL MEMBERS SHEPARD, STEWART, RUMP, WILLIS, WOLFF, SCHANK, HALL AND JENSEN VOTING "AYE", AND COUNCIL MEMBERS NONE VOTING "NAY", THE MAYOR DECLARED THE FOREGOING RESOLUTION PASSED AND ADOPTED THIS 14TH DAY OF SEPTEMBER 2021. CITY OF BLAIR, NEBRASKA BY RICHARD HANSEN, MAYOR ATTEST: BRENDA WHEELER, CITY CLERK STATE OF NEBRASKA ) ) :ss: WASHINGTON COUNTY ) BRENDA WHEELER, hereby certifies that she is the duly appointed, qualified and acting City Clerk of the City of Blair, Nebraska, and that the above and foregoing Resolution was passed and adopted at a regular meeting of the Mayor and City Council of said City held on the 14th day of September, 2021. BRENDA WHEELER, CITY CLERK BOARD OF PUBLIC ROADS CLASSIFICATIONS AND STANDARDS FORM 10 NOTIFICATION OF REVISION OF ONE-YEAR PLAN COUNTY: CITY: VILLAGE: Blair REASON FOR REVISION: New Development in the Cit LOCATION DESCRIPTION: ----------------------------------------------------------------------------------------------------------------------------------------- 1 0th Street from-Weibur Street south -to Highway 75_________________________________ ----------------------------------------------------------------------------------------------------------------------------------------- EXISTING SURFACE TYPE AND STRUCTURES: (such as dirt, gravel, asphalt, concrete, culvert or bridge) Dirt ----------------------------------------------------------------------------------------------------------------------------------------- AVERAGE DAILY TRAFFIC:CLASSIFICATION TYPE: (as shown on Functional Classification Map) 20 21 = 0 , 20 1500 = 400 Local PROPOSEDIMPROVEMENT DESIGN STANDARD NUMBER: -----------MUnlCpal ------ SURFACING: 12:00 THICKNESS 31' WIDTH X GRADING X CONCRETE X RIGHT OF WAY QX LIGHTING AGGREGATE X CURB & GUTTER UTILITY ADJUSTMENTS ARMOR COAT X DRAINAGE STRUCTURES FENCING ASPHALT X EROSION CONTROL X SIDEWALKS BRIDGE TO REMAIN IN PLACE ---------------ROADWAY WIDTH --_---- LENGTH ----------------------------------------- TYPE NEW BRIDGE: ---------------ROADWAY WIDTH ------- LENGTH ----------------------------------------- TYPE BOX CULVERT: -----------------------------SPAN RISE-------•LENGTH----------------------------------------.TYPE CULVERT: DIAMETER LENGTH TYPE ❑X YES [rN/A Bridges and Culverts Sized Hydraulic Analysis Pending OTHER CONSTRUCTION FEATURES: Construct new PCC street to serve new Industrial development________________________ ------------------------------------------------------------------ ----------------------------------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------------------------------- ESTIMATED COST *COUNTY *CITY *STATE *FEDERAL *OTHER TOTAL (IN THOUSANDS) 1.2 1 1.2 *OPTIONAL (Nearest Tenth) PROJECT NUMBER: Project Length = ---------------------- 0.33 (state Unit of Measure) B -205(Y-21 Z ----------------------- ----- --------- SIGNATURE: TITLE: DATE: Director of Public Works Page I