2021-26RESOLUTION NO. 2021-26
COUNCIMEMBER WILLIS INTRODUCED THE FOLLOWING RESOLUTION:
WHEREAS, pursuant to Resolution Number 2021-2, the Mayor and City Council of the
City of Blair, Nebraska, adopted the Year 2021 One- and Six -Year plan for the construction and
maintenance and repair of the streets of the City of Blair, Nebraska,
WHEREAS, certain amendments have been made to said One- and Six -Year Plan
necessitating and amendment to such Plan,
BE IT RESOLVED by the Mayor and City Council of the City of Blair, Nebraska, that the
Year 2021 One and Six Year plan for the construction and maintenance and repair of the streets of
the City of Blair, Nebraska, as prepared by the City Street Superintendent and dated January 26,
2021, be hereby is amended to add the 10th Street Improvement Project from Wilbur Street South
to Highway 75.
BE IT FURTHER RESOLVED that the amendments to said One- and Six -Year Plan be
filed with the Department of Transportation, State of Nebraska.
COUNCIL MEMBER WILLIS MOVED THAT THE RESOLUTION BE ADOPTED AS READ,
WHICH SAID MOTION WAS SECONDED BY COUNCIL MEMBER RUMP. UPON ROLL
CALL, COUNCIL MEMBERS SHEPARD, STEWART, RUMP, WILLIS, WOLFF, SCHANK,
HALL AND JENSEN VOTING "AYE", AND COUNCIL MEMBERS NONE VOTING "NAY",
THE MAYOR DECLARED THE FOREGOING RESOLUTION PASSED AND ADOPTED
THIS 14TH DAY OF SEPTEMBER 2021.
CITY OF BLAIR, NEBRASKA
BY
RICHARD HANSEN, MAYOR
ATTEST:
BRENDA WHEELER, CITY CLERK
STATE OF NEBRASKA )
) :ss:
WASHINGTON COUNTY )
BRENDA WHEELER, hereby certifies that she is the duly appointed, qualified and acting City
Clerk of the City of Blair, Nebraska, and that the above and foregoing Resolution was passed and
adopted at a regular meeting of the Mayor and City Council of said City held on the 14th day of
September, 2021.
BRENDA WHEELER, CITY CLERK
BOARD OF PUBLIC ROADS CLASSIFICATIONS AND STANDARDS
FORM 10
NOTIFICATION OF REVISION OF ONE-YEAR PLAN
COUNTY:
CITY: VILLAGE:
Blair
REASON FOR REVISION:
New Development in the Cit
LOCATION DESCRIPTION:
-----------------------------------------------------------------------------------------------------------------------------------------
1 0th Street from-Weibur Street south -to Highway 75_________________________________
-----------------------------------------------------------------------------------------------------------------------------------------
EXISTING SURFACE TYPE AND STRUCTURES: (such as dirt, gravel, asphalt, concrete, culvert or bridge) Dirt
-----------------------------------------------------------------------------------------------------------------------------------------
AVERAGE DAILY TRAFFIC:CLASSIFICATION
TYPE: (as shown on Functional Classification Map)
20 21 = 0
, 20 1500 = 400
Local
PROPOSEDIMPROVEMENT
DESIGN STANDARD NUMBER:
-----------MUnlCpal ------ SURFACING: 12:00 THICKNESS 31'
WIDTH
X GRADING
X CONCRETE X RIGHT OF WAY QX LIGHTING
AGGREGATE
X CURB & GUTTER UTILITY ADJUSTMENTS
ARMOR COAT
X DRAINAGE STRUCTURES FENCING
ASPHALT
X EROSION CONTROL X SIDEWALKS
BRIDGE TO REMAIN IN PLACE
---------------ROADWAY WIDTH --_---- LENGTH -----------------------------------------
TYPE
NEW BRIDGE:
---------------ROADWAY WIDTH ------- LENGTH -----------------------------------------
TYPE
BOX CULVERT: -----------------------------SPAN
RISE-------•LENGTH----------------------------------------.TYPE
CULVERT:
DIAMETER LENGTH
TYPE
❑X YES [rN/A
Bridges and Culverts Sized Hydraulic Analysis Pending
OTHER CONSTRUCTION FEATURES: Construct new PCC street to serve new Industrial development________________________
------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------------
ESTIMATED COST *COUNTY *CITY *STATE *FEDERAL *OTHER
TOTAL
(IN THOUSANDS)
1.2 1
1.2
*OPTIONAL
(Nearest Tenth)
PROJECT NUMBER:
Project Length = ----------------------
0.33 (state Unit of Measure)
B -205(Y-21 Z
----------------------- ----- ---------
SIGNATURE:
TITLE:
DATE:
Director of Public Works
Page I