Loading...
2009-11-13 Luxa Construction $5,310.1230100 Vendor Number .LURA CONSTRUCTION P O BOX 105 BLAIR NE 68008 11/13/09 Z71M Vale Cheep Number Account Number Description 3080055116 2 - ADDITIONAL AMOUNT DUE 51310.12= AIP 3-31-0109-09 I Total $ 5,310.12 I do solemnly swear that the above is true and correct to the best of myknowledge. Subscribed ;and sworn#o. before meMs 13thday of November, 2Qo9. Finance Committee Approval: P Frahin City Treasurer DATE 1.8/23/09 BLAIR AIRPORT AUTHORITY CK# 583 INVOICE DESCRIPTION DISTRIBUTION AMOUNT INVOICE DESCRIPTION DISTRIBUTION AMOUNT NUMBER NUMBER 3080055116 100,891.00 2 AIP 3-31-0109-09 BLAIR AIRPORT AUTHORITY CHECK NO. 000583 218 S. 16TH ST. DATE 10/23/09 BLAIR, NEBRASKA 68008 TWO RIVERS STATE BANK 76-359, (402) 426-4191 BLAIR, NEBRASKA 1049 AMOUNT One hundred thousand, eight hundred ninety-one dollars & no/1 3100- - ----- PAY TO: (Do k( LU CONSTRUCTION PO BOX 105 CHAIRMAN BLAIR, NE 68068 TREASURER 11100058.31111 1U&0k9MS9S1c1 009GY7?9110 i 30100 Vendar Number LUXA CONSTRUCTION Pr 0 BOX 105 BLAIR NE 68008 ME Date Check Number Account Number Description 3080055116 2 I00,89I.(f AT 3-31-0109-09 I. Total $ 100,891.00 I do solezrady swear that the above is true and correct to the best of my Imewledge. SOgcribed.agd.swjomiA Jefore-nte tlds 22tH dayof{3ctober, 2049. P Frahm city Treaer- Finance Committee Approval: PROGRESS ESTIMATE STATE OF NEBRASKA DEPARTMENT OF AERONAUTICS Sponsor: Blair Airport Authority 218 South 16th Street Blair, Nebraska Airport Name: Blair Municipal Airport (BTA) Contractor: Luxa Construction Co., Inc. 925 E. Dixon Road / P.O. Box 105 Blair, NE 68008 A wfima r� 4 COPIES TO DEPT. OF AERONAUTICS Estimate No.: 2 Date: September 30, 2009 Project No. AIP 3-31-0109-09 Project: Parallel Taxiway to Runway 13/31 Date of Contract: July 24, 2009 ITEM NO, CHG ORDER TY DESCRIPTION ORIGINAL CONTRACT QUANTITY CHG ORDER QTY REVISED CONTRACT QUANTITY UNIT ESTIMATED QUANTITY TO DATE UNIT PRICE TOTAL SECTION 1' SOUTH TAXIWAY PAVING 101 Site Preparation 1 1 L.S. 0.02 $ 61960.00 1,239.20 102 Mobilization 1 1 L.S. $ 16,525.00 103 Barricades And Warning Markers 1 1 L.S. 0.50 1 $ 4,494.00 2,247.001 104 Construction Staking 1 1 L.S. 0.40 $ 4,600.00 $ 1,840.00 105 Remove Paint 666 666 S.F. $ 2.10 $ 106 Remove Reflector With Protector 3 3 Each 2 $ 32.00 64.00 107 Unclassified Excavation 6,430 6,430 C,Y. 2,230 $ 2.51 $ 5,597.30 108 6" Crushed P-208 Aggregate Base Course 9,307 9,307 S.Y. 10.05 109 8" P-501 P.C. Concrete Pavement 7,956 7,956 S.Y. $ 30.60 110 Duct Marker In Pavement 2 2 Each $ 100.00 $ iii Smoothness Test i i L.S. 1,605.00 $ 112 Silt Fence 500 500 L.F. 1.75 $ 113 Erosion Control Maintenance 40 40 Hr. $ 90.00 114 Remove Silt Fence 500 500 L.F. 0.25 115 Paintin With Reflective Media 2100 2100 S.F. $ 2.00 $ 116 Painting Without Reflective Media 4,269 4,269 S.F. 1.50 $ 117 Cover Crop Seeding 10.20 10.20 Acre 134.00 $ 118 Airport Seeding10.20 10.20 Acre $ 754.00 $ SECTION 2 - NORTH TAXIWAI:-GRADING AND PAGING 201 Site Preparation 1 L.S. 0.50 $ 32,465.00 $ 16,232.50 202 Mobilization 1 L.S. 0.90 $ 6,680.00 6,012.00 203 Barricades And WarningMarkers 1 L.S. 0.50 $ 4,494.00 $ 2,247.00 204 Construction Stakin N333 1 L.S. 0.60 9,09S.00 $ 5,457.00 205 Remove Paint 333 S.F. 2.10 $ - 206 Remove Reflector With Protector 21 Each 21 32.00 $ 672.00 207 Unclassified Excavation 77,200 77,200 C.Y. 77,200 2,48 191456.00 208 Type 1 Pavement Removal 1,788 1,788 S.Y. 1,788 $ 10.65 19,042.20 209 Type 2 Pavement Removal 2,137 2,137 S.Y. 2,137 7.60 $ 16,241.20 210 Type 3 Pavement Removal 964 964 S.Y. 230 $ 3.20 $ 736.00 211 Type 4 Pavement Removal 663 663 S.Y. $ 2.35 $ - 212 18" Galvanized CSP 130 130 L.F. 130 $ 36.34 $ 4,724.20 213 18" Galvanized CSP FES 2 2 1 Each 2 367.001 $ 734.00 214 24" R.C.P. Class III 234 234 L.F. 232 $ 41.90 $ 9,720.80 215 24" R.C.P. F.E.S. 1 1 Each 1 564.00 $ 564.00 216 Grate Inlet 1 1 Each $ 6,270.00 $ - 217 Concrete Channel Pavement Culvert End Treatment 34 34 S.Y. 26 $ 86.40 $ 2,246.40 218 6" Crushed P-208 Aggregate Base Course 10,317 10,317 S.Y. 8,601 10.50 $ 90 310.50 219 W P-501 P.C. Concrete Pavement 7,568 7,568 S.Y. 30.60 $ - 220 P-405 Hot Mix Asphalt Pavement' 460 460 Ton 153.89 $ 97.00 $ 14,927.33 Duct Marker In Pavement 2 2 Ea. 10.00 $ Smoothness Test 1 1 L.S. 1,605.00 $ - Slit Fence 3,808 3,808 L.F. 4 380 1.75 $ 7,665.00 P224 Erosion Control Maintenance 80 80 Hr. 8 90.00 $ 720.00 Turf Reinforcin Mat, Class 2B, T e AA w/ Fertilizer & Seed 2,272 2,272 S.Y. 233 $ 4.75 1,106.75 Erosion Control Blanket, Class 1B, Type B w Fertilizer & Seed 9,000 9,000 S.Y. $ 1.18 $ - 227 Temporary Erosion Check Straw Wattle 415 415 L.F. 155 3.05 472.75 Remove Silt Fence 3,808 3,808 L.F. 129 $ 0.25 32.25 PaintingWith Reflective Media 1,991 1,991 S.F. $ 2.00 $ - Paintin Without Reflective Media 2,932 2,932 S.F. 1.50 $ N232 Cover CropSeeding33.3 33.3 Acre $ 134.00 $ Air ort Seedin 33.3 33.3 Acre 754.00 $ L-853 Elevated Ede Reflector And Protector Installed 25 25 Each $ 235.00 HWS S 52.59.1124 Page I Or 2 BTA 09 Est 2.xlsx ITEM NO. CHG ORDER TY i DESCRIPTION I ORIGINAL CONTRACT QUANTITY CHG ORDER QTY REVISED CONTRACT QUANTITY UNIT I ESTIMATED QUANTITY TO DATE Progress Est 2 UNIT PRICE TOTAL SECTION 3 = $Q.UTH TAXIWAY LIGHTING Progress Est 4 $ Progress Est 5 $ - Progress Est 6 $ 301 Site Pre aration .. 1 1 L.S. Charged As Of 30 3,424.00 09/26/2009: 302 Mobilization 1 1 L.S. $ 4,301,00 303 Barricades And Warning Markers 1 1 L.S. 4,494,00 $ 304 Place And Maintain X Each Time Placed And Removed 2 2 Ea. $ 100,00 $ 305 Construction Staking 1 1 L.S. 535,00 306 Remove Reflector With Protector 26 26 Ea. $ 32.00 307 Remove And Salvage Sign 2 2 Ea, 236.00 $ 308 1-Way2" Schedule 40 PVC Dud In Trench 4,968 4,968 L.F. 2.50 $ 309 1 c #8 SKV L-824 Cable In Duct 9,254 9,254 L.F. 1.70 310 1/c #6 Green Safety Ground AWG XHHW, In Dud 5,214 5,214 L.F. 1.70 $ 311 #6 Solid Bare Counterpoise In Trench 4,968 4,968 L.F. 1,30 312 L -861T Taxiway Ede Light, Quartz Base Mounted 53 53 Ea, 792.00 313 L -858R Sign, LED, 1 Module (Complete) 1 1 Ea, 5,564.00 $ 314 L-858R/Y Sign, LED, 2 Module Com fete 1 1 Ea, 6,152,00 315 Ede Light Tags 80 80 Ea, $ 17.00 Eledrical Vault Work(With 10 KW Regulator) 1 1 L.S. $ 13,535.00 $ SECTION 3 - ADD/DEDUCT ITEMS Add 3-1 L-861TT Ede Light, LED Fixture In Lieu Of Quartz Fixture Malll Onl 53 53 Each $ 178.00 $ Add 3-2 L -861T Taxiway Ede Light, LED New Equipment Onl 27 27 Each 1 $ 417.00 $ Deduct 3-3 • L-828 10 KW Regulator (Equipment Onl 1 1 L.S. 1 $ 1,360,00 SECTION.4 - NORT4:TA)QWAY'1?GK5NG 401 Site Preparation 1 1 L.S. $ 2 354.00 $ 402 Mobilization 1 1 L.S. 1969,00 $ 403 Barricades And WarningMarkers 1 1 L.S. $ 4 494.00 404 Construction Stakin 1 1 L.S. $ 535.00 $ 405 Remove Reflector With Protector 26 26 Ea, 2 32.00 $ 64.00 406 Remove And Salvage Sin 1 1 Ea, $ 236.00 $ - 407 1 -Way 2" Schedule 40 PVC Duct In Trench 4,657 4,657 L.F, 2,50 $ 408 1 -Way 2" HDPE Duct In Trench 106 L.F. 3,75 409 1/c #8 SKV L-824 Cable In Dud 5,516 L.F. $ 1,70 $ 410 1 c #6 Green Safe Ground AWG XHHW, In Dud 4,951 L.F. $ 1.70 $ 411 #6 Solid Bare Counterpoise In Trench N4,763 4,763 L,F. $ 1.30 $ 412 L -861T Taxiwa Ede Li ht, Quartz Base Mounted 61 Ea. $ 792.00 $ 413 L -858R Sin LED, 1 Module, Cam lete 1 Ea, $ 5,564,00 $ 414 Ede Li htTa s 61 Ea. 17,00 $ SECTION 4 ADD ITEM Add 4-1 L -861T Twy Edge Ught, LED Fixture In Lieu Of Quartz Fixture (Mat'I Only) 61 61 Ea, $ 197,00 $ - Total Complete as of 09-26-09 402,371,38 Original Contract Amount: 1 $1,505, 91.15 As Project Engineer, I hereby certify that the quantities shown above have been completed from measurements made by me or my assignees and that the work has been performed In reasonable close co ormity with the plans and specifications, 0iItii7-'� Date: q-3 0— 0? Allen F. Jambor, P.E. Project Engineer - HWS Consulting Group In . Date: NDA Pproject Engineer Approved For Payment r Project Engineer's Certification Approved: Date: Sponsor Less 10% Retained: $ 40,237.14 Less Liquidated Damages: $ - Less Previous Estimates Progress Est 1 $ 255,933,12 Progress Est 2 $ - Progress Est 3 $ Progress Est 4 $ Progress Est 5 $ - Progress Est 6 $ Progress Est 7 $ - TOTAL DUE THIS ESTIMATE 1 — 106,201.12 Working Days Charged As Of 30 of 65 Working Days 09/26/2009: OGT - 12009 D T. OF AER ON - I - HWS # 52-59.1124 Page 2 Or 2 BTA 09 Est 2.xlsx