Loading...
2013-01-31 Lacey Construction Inc $87,110.21BLAIR AIRPORT AUTHORITY 30315 Vendor Number LACEY CONSTRUCTION INC 4601 S 50TH ST #213 OMAHA NE 68117 Account Number 1/31/13 Claim Date 133-? Check Number 30 800 5516 14 2011-30001 1 87,110.21 Total $ 87,110.21 I do solemnly swear that the above is true and correct to the best of my knowledge. Subscribed and sworn to before me this 10th day of February, 2013. P Frahm City Treasurer Finance Committee Approval: STATE OF NEBRASKA DEPARTMENT OF AERONAUTICS Sponsor: Blair Airport Authority DESCRIPTION Mr. Rod Storm C.O. ADJUST AMOUNT 218 South 16th Street, Blair, NE 68008 Airport: Blair Municipal Airport (BTA) Assoc. Airport City: Blair, NE Notes Contractor: Lacey Construction Inc. _ 4601 S. 50th Street, #213 $ Omaha, NE 68117 PROGRESS ESTIMATE Estimate No.: Date: Project No. Project: Date of Contract: 4 COPIES TO DEPT. OF AERONAUTICS 4 (Quantities Through Week Ending 2/2/2013) February 7, 2013 }-oa Construction of 80'x90' Hangar 9/10/2012 y &CMoril ITEM NO. C.O. NO. DESCRIPTION ORIGINAL CONTRACT QUANT. C.O. ADJUST AMOUNT OVERALL REVISED CONT. QUANT. UNIT EST. QUANT. TO DATE UNIT PRICE TOTAL Notes BASE BID (4,587.00) _ Change Order No. 2 $ 3,676.96 Less 0 Days Of Part I Liq. Damages @ $500.00/Day, Change Order No. 3 $ I Less 0 Days O> Part II Liq. Damages @ $500.00/Day Site Preparation & Mobilization 1 I L.S. 0.90 S 8,444.00 S 7,599.60 ' -" C 2 Construction Staking 1 I L.S. 1$ 1,587.00 S 1,587.00 3 lEarthwork 1 I L.S. 0.83 S 17,216.00 $ 14,289.28 4 1 Crushed Rock Surfacing 195 195 S.Y. 0 $ 8.62 $ A 5 1P.C. Concrete Pavement (Hangar Approach) 37 37 S.Y. 36.00 $ 64.12 $ 2,308.32 6 1P.C. Concrete Pavement (Sidewalk) 336 336 S.F. 304.00 $ 3.35 S 1,018.40 7 Stoop 2 2 Ea. 2 S 494.11 $ 988.22 8 Temporary Erosion Control Measures (histaUUMaintain/Remove) 1 1 I L.S. 1 01 S 1,427.41 $ - 9 Airport Seeding With Mulch1 1 0 $ 1,976.41 S 10 Cover CropSeeding1 1 L.S.L.S. 0 $ 549.01 S 11 Remove And Replace P.C. Concrete Pavement (Apron) 87 87 S.Y. 1 87.001 S 50.15 S 4,363.05 Subtotal (Base Bid): S 32,153.87 OPTION 2 - 80'x90' Aircraft Hangar 2-1 80'x 90' Aircraft Hangar 1 1 L.S. 0.9067 $ 268,027.00 $ 243,007.00 %•_' 'B ' 24A 1 RoojConfigurationChange Deduct I I L.S. I $ 4,587.00 $ (4,587.00 2-1B 2 Fire Wall Change, BI -Fold Walk Door Location Change, Change To Bi -Fold Door Lift Straps 1 I L.S. 0.75 $ 3,676.96 $ 2,757.72 24E 3 Increase Conductor Size From The Main Electrical Panel To The Bi- Fold Door Motors From No. 10 To No. 8 - 1 I L.S. $ 334.00 $ 24F 3 Increase The Circuit Breaker In The Main Electrical Panel For The Bi -Fold Door Motors From 2512 To 4012 - 1 I L.S. $ 204.00 $ Subtotal (Option 2: Item 2.1): 1 $ 241,177.72 1 OPTION 2 - 80':90' Aircraft Hangar (NDA Hangar Loan Nan -Eligible) 2-2 1 Ifiasulation 1 1 I L.S. 1 0.901 S 16,246.00 1S 14,621.40 2-3 1 lHeating System 1 1 I L.S. 1 1 $ 11,602.00 1 $ Subtotal (Option 2: Items 2-2 & 2-3): 14,621.40 � Change Order No. 4 $ -_> - I ( — Revised Contract $ 337,233.00 As Project Engineer, I hereby certify that the quantities shown above have been completed - -" _ "� 2013 from measurements made by me or predecessors taken on part-time basis or on vent visits to the project site, and appear to represent that the work performed in general coaJtor.nance �a�+ with the plans and specifications.;' t �: A �anCA Andrew W. Beil, P.E. TOTAL DUE THIS ESTIMATE$ — 87,110.21 Less 10% Retained: 1 $ 28,795.30 Less Previous Estimates Progress Est No. 1 $ 16,483,59 Progress Est No, 2 S 33,388.95 Progress Est No. 3 $ 122,174.94 Progress Est S Progress Est $ Progress Est $ - A• i Per Plan Requirements, Crushed Rock Surfacing Is Not In Place Refer To Attached Schedule of Values For Hangar Building Bid Item 2-1 G '•' 90% Per Specifications, Page 0102 00-3 Date: Z-67 '' Date: �-11-13 Calendar Days of 35 Calendar Days Utilized Through 26 2/2/2013 (Site WorkfConcrete) Calendar Days of 60 Calendar Days Utilized Through 47 (Bldg Erection/Electrical) 2/2/2013 2/7/2013 Pagel Of 2 Pay Est. TOTAL COMPLETE (Base Bid +Option 2): S 287,952.99 Original Contract $ 337,605.04 Current Contract Amount (w/ C.O.1, 2 & 3):1 S 337,233.00 Change Order No. 1 $ (4,587.00) _ Change Order No. 2 $ 3,676.96 Less 0 Days Of Part I Liq. Damages @ $500.00/Day, Change Order No. 3 $ 538.00 Less 0 Days O> Part II Liq. Damages @ $500.00/Day $ Change Order No. 4 $ -_> - I ( — Revised Contract $ 337,233.00 As Project Engineer, I hereby certify that the quantities shown above have been completed - -" _ "� 2013 from measurements made by me or predecessors taken on part-time basis or on vent visits to the project site, and appear to represent that the work performed in general coaJtor.nance �a�+ with the plans and specifications.;' t �: A �anCA Andrew W. Beil, P.E. TOTAL DUE THIS ESTIMATE$ — 87,110.21 Less 10% Retained: 1 $ 28,795.30 Less Previous Estimates Progress Est No. 1 $ 16,483,59 Progress Est No, 2 S 33,388.95 Progress Est No. 3 $ 122,174.94 Progress Est S Progress Est $ Progress Est $ - A• i Per Plan Requirements, Crushed Rock Surfacing Is Not In Place Refer To Attached Schedule of Values For Hangar Building Bid Item 2-1 G '•' 90% Per Specifications, Page 0102 00-3 Date: Z-67 '' Date: �-11-13 Calendar Days of 35 Calendar Days Utilized Through 26 2/2/2013 (Site WorkfConcrete) Calendar Days of 60 Calendar Days Utilized Through 47 (Bldg Erection/Electrical) 2/2/2013 2/7/2013 Pagel Of 2 Pay Est. b x w� 000 41A A .- o s. 0 0 v + 3. p 0 Vl W w ' wO:i �aoo�C7awaWW tH-t F-�I.--iI C`1I MI�'I V�I�Oli�loOl °�I �IO miIIIIIIIIII 0 0 0 0 0 0 b x w� 000 41A A .- o s. 0 0 v + 3. p 0 Vl W w ' wO:i �aoo�C7awaWW tH-t F-�I.--iI C`1I MI�'I V�I�Oli�loOl °�I �IO 0 0 0 0 0 0 (D t' - M M 7 N 6s 6s 6s 69 69 GO) 69 6s H W a o o o o en Gi C> CS 00 ,°,, O U A H Cl o I O O H� r-+ ' V'1 tn r-;, N llO O O H (� �10 00 It V1 O 00 N M' O W) O N - r. U W Pr 16S 6s 6s 4&S 69 69 I ss 69 61!3 69 6s 0 0 0 0 b o o W O (V O O O 00 O oI:to � C O o0� O 0, O64 69 69 6R 69 ffj 6s A o 0 0 0 o N 00 a M t a oa`00,� 0 P, U 69 69 69 69 6s 69 69 69 69 69 6s O O O O O O O O b O 0 0 0 0 0 0 0 0 0 0 H It t- O M M N M O 110 N It oo d' O t- O N o" � 00 M �o M " O N N N 69 69 69 64 ss 69 6s f{� 69 b x w� 000 41A A .- o s. 0 0 v + 3. p 0 Vl W w ' wO:i �aoo�C7awaWW tH-t F-�I.--iI C`1I MI�'I V�I�Oli�loOl °�I �IO DATE PAYEE INV # AMOUNT 9/30/12 Benesch 56772/56773/56774 2,122.41 9/30/12 Johnson & Mock 66816 656.00 9/30/12 S & W Fence 37280 8,193.00 10/31/12 Benesch 57448/57447 7,097.20 10/31/12 Johnson & Mock 66978 4,873.50 10/31/12 Lacey Const 1 16,483.59 11/30/12 Benesch 58053 3,069.27 11/30/12 Johnson & Mock 67343 1,521.00 12/27/12 Lacey Const 2 33,388.95 (State Pmnt for Lacey 1 & 2 $31,419.70) 12/31/12 Benesch 58737 6,927.09 84,332.01 84,332.01 Ck #119944 12/31/12 Johnson & Mock 67658 5,599.67 1/8/13 Lacey Const 3 122,174.94 (State Pmnt for Lacey 3 $76,970.22) 127,774.61 127,774.61 Ck #120081 5/28/13 Sherrets Bruno & Vogt Gary Petersen 710,189.00 WCB Paid Sherrets Bruno 710,189.00 Ck #120766 12/13/13 Sherrets Bruno & Vogt Gary Petersen 323,200.00 323,200.00 Ck #121091 1/31/13 Lacey Const 4 53,372.13 ($87,110.21 - $33,738.08 (State Pmnt) 1/31/13 Benesch 59386 2,148.33 1/31/13 Benesch 60059 3,006.71 2/28/13 Johnson & Mock 68166 2,912.00 3/31/13 Johnson & Mock 68545 599.00 3/25/13 Lacey Const 5 12,441.46 ($28,233.46 - $15,792.00 (State Pmnt) 6/30/13 Benesch 63491 279.37 7/3/13 Lacey Const 6 -Final 33,725.83 No State Pmnt 108,484.83 Less State Pmnt on 1-3 (108,389.92) ($31,419.70 + $76,970.22) 94.91