Loading...
2013-03-25 Lacey Construction Inc. $28,233.46BLAIR AIRPORT AUTHORITY 30315 3/25/13 Vendor Number Claim Date LACEY CONSTRUCTION INC 4601 S 50TH ST #213 OMAHA NE 68117 Check Number Account Number oescrlptlon 30 800 5516 15 2011-30001 28,233.46 I do solemnly swear that the above is true and correct to the best of my knowledge. Subscribed and sworn to before me this 10th day of March, 2013. P Finance Committee Approval: u Total $ 28,233.46 City Treasurer STATE OF NEBRASKA DEPARTMENT OF AERONAUTICS Sponsor: Blair Airport Authority Mr. Rod Storm 218 South 16th Street, Blair, NE 68008 Airport: Blair Municipal Airport (BTA) Assoc. Airport City: Blair, NE Contractor: Lacey Construction Inc. 4601 S. 50th Street, #213 Omaha, NE 68117 PROGRESS ESTIMATE Estimate No.: Date: Project No. Project: Date of Contract: 4 COPIES TO DEPT. OF AERONAUTICS 5 (Quantities Through Week Ending 3/2/2013) March 2, 2013 --- q_0 a Construction of 80'x90' Hangar 9/10/2012 AtoikoerFy ITEM NO. C.O. NO. DESCRIPTION ORIGINAL CONTRACT QUANT. C.O. ADJUST AMOUNT OVERALL REVISED CONT. QUANT. UNIT EST. QUANT. TO DATE UNIT PRICE TOTAL Notes BASE BED Change Order No. 2 $ 3,676.96 _ Less 0 Days Of Part I Liq. Damages @ $500.00/Day <'' Change Order No. 3 4 $ $ 538.00 Less 15 Days Of Part II Liq. Damages @ $500.00/Day $ 7 500.00 jK- CEIVEU 1 Site Preparation & Mobilization 1 1 L.S. 0.90 S 8,444.00 $ 7,599 60 ,.. C 2 iconstruction Staking 1 1 L.S. 1 $ 1,587.00 $ 1,587.00 3 lEarthwork 1 1 L.S. 0.83 S 17,216.00 S 14,289.28 4 1 Crushed Rock Surfacing 195 195 S.Y. 0 $ 8.62 $ 5 1P.C. Concrete Pavement (Hangar Approach) 37 37 S.Y. 36.00 $ 64.12 $ 2,308.32 6 1P.C. Concrete Pavement Sidewalk 336 336 S.F. 304.00 $ 3.35 $ 1,018.40 7 Istoop 2 2 Ea. 2 $ 494.11 $ 988.22 8 Temporary Erosion Control Measures (InstaWMaintain/Remove) 1 1 L.S. 0$ 1,427.41 $ 9 Airport Seeding With Mulch 1 1 L.S. 0 $ 1,976.41 $ 10 Cover Crop Seeding 1 I L.S. 0 $ 549.01 S - I1 Remove And Replace P.C. Concrete Pavement (Apron) 87 87 S.Y. 87.001 S 50.15 S 4,363.05 Subtotal (Base Bid): $ 32,153.87 OPTION 2 - 801x90' Aircraft Hangar 2-1 1 180'x 90' Aircraft Hangar 1 1 L.S. 1 $ 268,027.00 $ 268,027.00 " F3 24A I I Roof Configuration Change Deduct ---_- 1 I L.S. 1 $ 4,587.00 $ (4,587.00 2-1B 2 Fire Wall Change, Bi -Fold Walk Door Location Change, Change To Bi -Fold Door Lill Straps -- _ 1 I L.S. 1 $ 3,676.96 $ 3,676.96 2-]E 3 Increase Conductor Size From 77ie Main Electrical Panel To The Bi- Fold Door Motors From No. 10 To No. 8 -: ---.-- _, I 1 L.S. I $ 334.00 $ 334.00 2 IF 3 Increase The Circuit Breaker In The Main Electrical Panel For The Bi -Fold Door Motors From 2512 To 4012 - —_- 1 I L.S. 1 $ 204.00 $ 204.00 auu[ural kVpuUu G. 1LC. 41f: t o ­,...++ I OPTION 2 - 80'x90' Aircraft Hangar (NDA Hangar Loan Non -Eligible) 2-2 lInsulation 1 1 L.S. 1 $ 16,246.00$ 16,246.00 2-3 Heating System 1 1 L.S. 1 $ 11,602,00 $ 11,602.00 Subtotal (Option 2: Items 2.2 & 2-3): 1 $ 27,848A0 Change Order Revised Contract $ 337,233.00 0 2013 As Project Engineer, I hereby certify that the quantities shown above liave completed from measurements made by me or predecessors taken on part-time basis or infrequent visits to the project site, and appear to represent that the work performed i4 gene with the plans and specifications. ; t)FPT. OF AERORi-4LT O Date drew W, Beil, P.E. TOTAL DUE THIS ESTIMATE1 $ 28,233.46 Project Engineer -Alfred Benesch'c Co. NDA i Approved For Pa tPer Project Engieer's Certification Aooroved: la,4� Sponsor s Per Plan Requirements, Crushed Rock Surfacing Is Not In Place Refer To Attached Schedule of Values For Hangar Building Bid Item 2-1 90% Per Specifications, Page 0102 00-3 Date: --7> �G J Date: Less 10% Retained: I $ 32,765.68 Less Previous Estimates Progress Est TOTAL COMPLETE (Base Bid + Option 2): $ 327,656.83 Original Contract $ 337,605.04 Current Contract Amount w/ C.O. 1, 2 & Change Order No. I $ (4,587.00). " Change Order No. 2 $ 3,676.96 _ Less 0 Days Of Part I Liq. Damages @ $500.00/Day <'' Change Order No. 3 4 $ $ 538.00 Less 15 Days Of Part II Liq. Damages @ $500.00/Day $ 7 500.00 jK- CEIVEU Change Order Revised Contract $ 337,233.00 0 2013 As Project Engineer, I hereby certify that the quantities shown above liave completed from measurements made by me or predecessors taken on part-time basis or infrequent visits to the project site, and appear to represent that the work performed i4 gene with the plans and specifications. ; t)FPT. OF AERORi-4LT O Date drew W, Beil, P.E. TOTAL DUE THIS ESTIMATE1 $ 28,233.46 Project Engineer -Alfred Benesch'c Co. NDA i Approved For Pa tPer Project Engieer's Certification Aooroved: la,4� Sponsor s Per Plan Requirements, Crushed Rock Surfacing Is Not In Place Refer To Attached Schedule of Values For Hangar Building Bid Item 2-1 90% Per Specifications, Page 0102 00-3 Date: --7> �G J Date: Less 10% Retained: I $ 32,765.68 Less Previous Estimates Progress Est No. 1 $ 16,483.59 Progress Est No. 2 $ 33,388.95 Progress Est No. 3 S 122,174.94 Progress Est No.4 $ 87,110.21 Progress Est $ Progress Est $ Calendar Days of 35 Calendar Days Utilized Through 26 (Site Work/Concrete) 3/2/2013 Calendar Days of 60 Calendar Days Utilized Through 75 (Bldg ErectionMectdcal) 3/2/2013 3/15/2013 Page 1 Of 1 Pay Est. r+ i 2 EIIIIIIIIII 0 > 69 69 69 69 64 69 69 69 69 H e W o \ o \ e \ o \ 0 \ o \ e \ o \ 0 \ 0 \ Cl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O � U O o 0 0 0 0 0 o 0 o 0 0 0 0 0 0 0 0 0 0 ►� W�toriri��tv�N�t F" to N O N 00 0 0 ON 00 .--� 00 W) O — N "o O— dt N O M N M 'cl' "o N .. P-4 U W 69 69 1 6e I 69 I 69 1 69 69 69 69 GO) A A o 0 0 0 0 000 00 ~ WO V) oo O O M M to 'ct O N V1 W O 69 69 6`116,116,11 96969 69 0 0 0 0 0 0 , . O Nk It CA m /H-'n��o cin- 110 O 00 d' O r -a W) O N 5� o 69 69 69 69 69 69 69 69 69 69 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 O. O O d O MM �O ct t— N d r M N O N oo O O ON 00 00 q ti -tO N M o O C) M N N N 69 669 6S 69 69 � 69 69 EA 69 0