Loading...
2008-03-17 Henningsen Construction $7,500.00-3x`1.%/06 C J0 2.50 ATEBLAIR AIRPORT AUTHORITY INVOICE DESCRIPTION DISTRIBUTION AMOUNT INVOICE DESCRIPTION DISTRIBUTION AMOUNT NUMBER NUMBER 3080055116 7 s, wo, %)A 11-01 Est. - Hangar Project 2006-10002 PAY TO: FIENNINGSEN CON STPUTGTJONT '.(PC CHAIRMAN r PO BOX 407 NON-HES 0TUBLIE AT)_ANTIC, 1A 500/22 TREASURER BLAIR AIRPORT AUTHORITY CHECK NO. 000 218 S. 16TH ST. DATE 3/1.7/08 BLAIR, NEBRASKA 68008 TWO RIVERS STATE BANK -76:3-59 t (402) 4264191 BLAIR, NEBRASKA 1049 AMOUNT $ 7,500.00 PAY TO: FIENNINGSEN CON STPUTGTJONT '.(PC CHAIRMAN r PO BOX 407 NON-HES 0TUBLIE AT)_ANTIC, 1A 500/22 TREASURER BLAIR AIRPORT AUTHORITY 30075 Vendor Number HENNINGSEN CONSTRUCTION INC P O BOX 407 ATLANTIC IA 50022 Account Number 3080055116 NDA H-01 EST 7 3/17/08 Claim ate A—b V Check Number Description 2006-30002 7,500.00 Total $ 7,500.00 I do solemnly swear that the above is true and correct to the best of my knowledge. Subscribed and sworn to before me this 17TH day of MARCH, 2008. P Frahm City Treasurer Finance Committee Approval: PROGRESS ESTIMATE NO. 7 (FINAL) STATE OF NEBRASKA DEPARTMENT OF AERONAUTICS Date: February 13, 2008 Sponsor: BLAIR AIRPORT AUTHORITY Project No.: NDA H-01 BLAIR, NEBRASKA Project: CONSTRUCTION OF AIRCRAFT HANGARS Contractor: Henningsen Const. Inc. Date of Contract: August 15, 2006 ITEM NO. DESCRIPTION ORIGINAL CONTRACT QUANTITY CHANGE ORDER QUANTITY UNIT ESTIMATED QUANTITY TO DATE UNIT PRICE AMOUNT SECTION 1 - ONE 10 -PLACE NESTED T -HANGAR TOTAL DUE CONTRACTOR $1,025,731.85 $21,709.94 101 Site Preparation 1 L.S. 1.00 Is 8,950.00$ 8,950.00 102 Unclassified Excavation 975 C.Y. 975 $ 3.25 $ 3,168.75 103 6" P.C. Concrete Pavement 2,882 S.Y. 2,882 $ 31.90$ 91,935.80 104 Seeding With Mulch 2,800 S.Y. 2,800 $ 0.80$ 2,240.00 105 Silt Fence 750 L.F. 182 $ 3.00$ 546.00 106 1 Silt Fence Maintenance 40 Hr. 1 $ 90.00$ 0.00 107 Alternate A - One 10 -Place Nested T -Hangar Complete With Bi -Fold Doors i C01= -95,022 CO2= -3,500 C04= 6,270 L.S. 1.000 $ 584,700,00 $ -98,522.00 $ 492,448.00 $ 6,270.00 108 Alternative B - One 10 -Place Nested T -Hangar Complete With Hydraulic Swing Doors 1 L.S. $ No Bid $ No Bid SECTION 2 - ONE 4 -PLACE EXECUTIVE HANGAR 201 Site Preparation 1 L.S. 1.00 $ 4,650.00$ 4,650.00 202 Unclassified Excavation 500 C.Y. 500 $ 3.25$ 1,625.00 203 6" P.C. Concrete Pavement 957 S.Y. 957 $ 31.90$ 30,528.30 204 Stoop 4 Each 4 $ 600.00$ 2,400.00 205 Seeding With Mulch 3,000 S.Y. 3,000 $ 0.80$ 2,400.00 206 1 Silt Fence 250 L. F. 183 $ 3.00$ 549.00 207 Silt Fence Maintenance 20 Hour $ 90.00$ 0.00 208 Alternate A - One 10 -Place Nested T -Hangar Complete With Bi -Fold Doors I C01= -55,683 CO2= -3,500 C04= 6,270 L.S. 1.000 $ 425,899.00 $ -59,183.00 $ 372,986.00 $ 6,270.00 209 Alternative B - One 10 -Place Nested T -Hangar Complete With Hydraulic Swing Doors 1 L.S. - $ No Bid $ No Bid 210 Awning Allowance 1 4 1 1 Each 1 4 $ 1,000.001$ 4,000.00 NOTE: Calendar Days Elapsed as of August 17, 2007 = 298 of 270 Original Contract Change Order #1 Change Order #2 Change Order #3 Change Order #4 Revised Contract Amount Progress Estimate No. 1 Progress Estimate No. 2 Progress Estimate No. 3 Progress Estimate No. 4 Progress Estimate No. 5 Progress Estimate No. 6 I hereby state that to the best of my knowledge and belief the quantities shown above have been completed from measurements made by me or my assignees and they are correct. GRAND TOTAL $ 1,018,426.85 $1,170,896.85 LESS RETAINED -$150,705.00 Less Liquidated Damages -$7,000.00 LESS PREVIOUS ESTIMATES $0.00 7,500.00 $12,540.00 TOTAL DUE CONTRACTOR $1,025,731.85 $21,709.94 $ 0.00 $ 13,500.00 $ 997,426.85 7,500.00 $74,277.83 * Liquidated Damages Were $605,552.96 Mutually Agreed Upon $129,075.44 $14,520.45 $152,290.23 12 PROJECT ENGINEER z zg�gE_ Date:�/� ®ly HWS Consulting Group Inc APPROVED: Date: NDA Engine r APPROVED: Date: Airport Sponsor APPROVED: Henningsen Construction Inc. Date: HWS # 36-7058 Page 1 Of 1 K46 Hangar Est 07.xis PROGRESS ESTIMATE NO. 7 (FINAL) STATE OF NEBRASKA DEPARTMENT OF AERONAUTICS Sponsor: BLAIR AIRPORT AUTHORITY BLAIR, NEBRASKA Project: CONSTRUCTION OF AIRCRAFT HANGARS Date: February 13, 2008 Project No.: NDA H-01 Contractor: Henningsen Const. Inc. Date of Contract: August 15, 2006 ITEM NO, DESCRIPTION ORIGINAL CONTRACT QUANTITY CHANGE ORDER QUANTITY UNIT ESTIMATED QUANTITY TO DATE UNIT PRICE AMOUNT SECTION 1 - ONE 10 -PLACE NESTED T -HANGAR 101 Site Preparation i L.S. 1.00 $ 8,950.00$ 8,950.00 102 Unclassified Excavation 975 C.Y. 975 $ 3.25$ 3,168.75 103 6" P.C. Concrete Pavement 2,882 S.Y. 2,882 $ 31.90$ 91,935,80 104 Seeding With Mulch 2,800 S.Y. 2,800 $ 0.80$ 2,240.00 05 r1 Silt Fence 750 L.F. 182 $ 3.00$ 546.00 106 Silt Fence Maintenance 40 Hr. $ 90.00$ 0.00 107 Alternate A - One 10 -Place Nested T -Hangar Complete With Bi -Fold Doors I C01= -95,022 CO2= -3,500 C04= 6,270 L.S. 1.000 $ 584,700.00 $ -98,522.00 $ 492,448.00 $ 6,270.00 108 Alternative B - One 10 -Place Nested T -Hangar Complete With Hydraulic Swing Doors I L.S. - $ No Bid $ No Bid SECTION 2 - ONE 4 -PLACE EXECUTIVE HANGAR 201 1 Site Preparation i L.S. 1.00 $ 4,650.00$ 4,650.00 202 Unclassified Excavation 500 C.Y. 500 $ 3.25$ 1,625.00 203 6" P.C. Concrete Pavement 957 S.Y. 957 $ 31.90$ 30,528.30 204 Stoop 4 Each 4 $ 660.00$ 2,400.00 205 Seeding With Mulch 3,000 S.Y. 3,000 $ 0.80$ 2,400.00 206 Silt Fence 250 L. F. 183 $ 3.00$ 549.00 207 Silt Fence Maintenance 20 Hour $ 90.00$ 0.00 208 Alternate A - One 10 -Place Nested T -Hangar Complete With Bi -Fold Doors 1 C01= -55,683 CO2= -3,500 C04= 6,270 L.S. 1,000 $ 425,899.00 $ -59,183.00 $ 372,986.00 $ 6,270.00 209 Alternative B - One 10 -Place Nested T -Hangar Complete With Hydraulic Swing Doors I L.S. $ No Bid $ No Bid 210 Awning Allowance 4 Each 4 $ 1,000.00 $ 4,000.00 NOTE: Calendar Days Elapsed as of August 17, 2007 = 298 of 270 Original Contract Change Order #1 Change Order #2 Change Order #3 Change Order #4 Revised Contract Amount Progress Estimate No.I Progress Estimate No. 2 Progress Estimate No. 3 Progress Estimate No. 4 Progress Estimate No. 5 Progress Estimate No. 6 I hereby state that to the best of my knowledge and belief the quantities shown above have been completed from measurements made b� $1,170,896.85 -$150,705.00 -$7,000.00 $0.00 $12,540.00 $1,025,731.85 $21,709.94 GRAND TOTAL $ 1,018,426.85 LESS RETAINED $ 0.00 Less Liquidated Damages * $ 13,500.00 LESS PREVIOUS ESTIMATES $ 997,426.85 TOTAL DUE CONTRACTOR $74,277.83 * Liquidated Damages Were $605,552.96 Mutually Agreed Upon $129,075.44 $14,520.45 $152,290.23 PROJECT ENGINEERIV _ H Consu ting r nc. G - APPROVED: V N13A Engineer they ar correct. v APPROVED: F80Airport 5 onsor 9&'J APPROVED: Hen ' en Construction Inc. DEPT. OF AERONAUTICS $ 7,500.00 Date: ;?7�.flOe? Date: Z-2�— Date: 2�zG�p Date: fzvy HWS # 36-7058 Page 1 Of 1 K46 Hangar Est 07.xls