Loading...
2010-01-08 Valley Corp $35,954.9830188 Yen !3Un NT.. r VALLEY CORP p0Box Y&q- VALLEY NE 68064 - Account Number .30800515-1-16 Description I do solemnly sst ear that tate above is trate and correct to the best of my bztowledge. '46h54u_e.?t•e=vt�-trr-{3ti3�33••ctl';=rrt's•, tk# Finance Committee AFproraL 1/8/10 lam .- Total $ _.:C--itv T-reasnrer STATE OF NEBRASKA DEPARTMENT OF AERONAUTICS Sponsor: Blair Airport Authority Blair, NE AirportName: Blair Municipal Airport (BTA) Contractor: Valley Corporadon 28001 Ida Circle, P.O. Box 589 Valley, NE 68064 PROGRESS ESTIMATE Estimate No.: Date: Project No. Project: Date of Contract: 4 COPIES TO NDA 5 12/02/2009 (For Work Through 11/07/2009) AIP 3-31-0109-07 Partial Parallel Taxiway Grading (South) & 2 -Box PAPI System Installation to Runway 13 & Runway 31 Thursday, May 28, 2009 ITEM NO. C.O. NO. DESCRIPTION ORIGINAL CONTRACT QUANT, C.O. QUANT. OVERALL REVISED CONTRACT QUANT. UNIT EST. QUANT. TO DATE UNIT PRICE TOTAL SECTION41(GRADING & PAVING & LIGHTING) 101 Site Preparation 1 1 L.S. 1.00 24,931.68 $ 24,931.68 102 Mobilization 1 1 L.S. 1.00 14,428.79 $ 14,428.79 103 Barricades And Warning Markers 1 1 L.S. 1.00 937.04 $ 937.04 104 Place And Maintain X Each Time Placed And Removed 6 6 Ea. 6 992.16 $ 5,952.96 105 Construction Staking 1 1 L.S. 1.00 9,921.60 $ 9,921.60 106 1 Remove Drop Structure 1 1 Ea. 1.00 1,503.53 $ 1,503.53 107 Remove And Salvage Rip Rap 1,135 1,135 S.Y. 1,135 2.32 $ 2,633.20 108 Relay Existing Rip Rap 1,135 1,135 S.Y. 1,135 2.29 $ 2,599.15 109 1 Rip Rap, NDOR Type B New ' 100 387 487 Ton 350.58 35.90 $ 12,585.82 110 1 Rip Rap Bedding w/Filter Fabric 1,135 430 1,565 S.Y. 1,652 7.56 $ 12,489.12 111 Unclassified Excavation 98,150 98,150 C.Y. 98,150 0.95 $ 93,242.50 112 Silt Fence 5,416 5,416 L.F. 4,800 1.83 $ 8,784.00 113 Bale Checks 100 100 L.F. 100 16.54 $ 1,654.00 114 Erosion Control Blanket 3,271 3,271 S.Y. 4,002 2.20 $ 8,804.40 115 1 Turf Reinforcing Mat 3,000 200 3,200 S.Y. 2,360 5.23 $ 12,342.80 116 Erosion Control Maintenance 140 140 Hr. 5 44.00 $ 220.00 117 Silt Fence Removal 5,416 5,416 L.F. 2,460 0.22 $ 541.20 118 Cover Crop Seeding 35.00 35 Ac. 55.12 $ 119 Airport Seeding 35.00 35 Ac. 16.5. 1,074.84 $ 17,734.86 120 48"CSP-Typell 311 311 L.F. 308 63.94 $ 19,693.52 121 48" CSP F.E.S. - Type II " 2 2 Ea. 2 1,212.64 $ 2,425.28 122 1-Wa 2" Schedule 40 PVC Duct In Trench 456 456 1 L.P. 456 2.74 $ 1,249.44 123 1-Wa 3" Schedule 40 PVC Duct In Trench 356 356 L.F. 356 3.31 $ 1,178.36 124.2 -Way 3" Schedule 40 PVC Duct In Trench 1,219 1,219 L.F. 1,219 5.51 $ 6,716.69 125 1-Wa 2" HDPE SDR1 i Duct In Trench 145 145 L.F. 145 3.53 $ 511.85 126 1/c #8 5KV L-824 Cable 310 310 L.F. 310 1.76 $ 545.60 127 2-1/c #6,600V XHHW Cables In Duct 5,792 5,792 L.F. 4,522 2.20 $ 9,948.40 128 1-1/c #6, 600V XHHW Green Safety Ground In Duct 2,413 2,413 L.F. 4,845 1.65 $ 7,994.25 129 1-1/c #12, 600V XHHW In Duct 323 323 L.F. 646 1.10 $ 710.60 130 #6 Solid Bare Counterpoise In Trench 2,185 2,185 L.F. 2,185 1.65 $ 3,605.25 131 ISteel Handhole 12" Dia. 5 5 Ea. 5 418.91 $ 2,094.55 132 1 Remove And Salvage Base Mounted MITL Taxiway Edge Light 2 2 Ea. 2 826.80 $ 1,653.60 DEC - 3 20 DEFT. OF AERO�AUTIOS 12/2/2009 Pagel Of 2 Pay Est. STATE OF NEBRASKA DEPARTMENT OF AERONAUTICS Sponsor: Blair Airport Authority Blair, NE Airport Name: Blair Municipal Airport (BTA) Contractor: Valley Corporation 28001 Ida Circle, P.O. Box 589 Valley, NE 68064 PROGRESS ESTIMATE Estimate No.: Date: Project No. Project: Date of Contract: 4 COPIES TO NDA 12/02/2009 (For Work Through 11/07/2009) ATP 3-31-0109-07 Partial Parallel Taxiway Grading (South) & 2 -Box PAPI System Installation to Runway 13 & Runway 31 Thursday May 28 2009 As Project Engineer, I hereby certify that the quantities Less 0 Days Of Liq. Damages @ $1,000.00/Day $ shown above have been completed from measurements made by me or my assignees and that the work has been Less $5,000 Retained: $5,000.00 performed in a reasonable close conformity with the plans and specifications. Less Previous Estimates Progress Est No.1 $ 122,152.62 Progress Est No. 2 $ 73,594.15 Progress Est No. 3 $ 53,443.61 Date: / Progress Est No. 4 $ 98,360.60 Andrew W. Beil, P.E. Progress Est $ - HWS Consulting Group Inc. Progress Est $ 9 Progress Est $ Dater �� 0 / TOTAL DUE THIS ESTIMATEI $ 35,954.98 N Engineer Approve&Foayr"mnt Per Project Engineer's Certification Working Days Utilized 44 of 44 Working Days As Of 11107/09: Date: � Approved For Payment Per Project Engineer's Certification 12/2/2009 Page 2 Of 2 Pay Est. OVERALL ORIGINALREVISED EST, ITEM C.O. CONTRACT C.O. CONTRACT QUANT, NO. NO. DESCRIPTION QUANT. QUANT. QUANT. UNIT TO DATE UNIT PRICE TOTAL 133 Remove and Salvage Elevated Edge Reflectors/Protectors 2 2 Ea. ' t;F;i}iy' 110.24 $ 134 L-853 Elevated Edge Reflector And Protector Installed 4 4 Ea, lii`I'raaj l?ie1i 220.48 $ 135 L-853 Elevated Edge Reflector Bases Installed 27 27 Ea. 7N V£;I iaii'.Ei 88.19 $ 136 L-853 Elevated Edge Reflectors Provided 27 27 Ea. s't+',rnyq,ultil`'u, itiSidesullr,a+fC!1' 246.94 $ 137 Reflector Protectors Installed 27 27 Ea. 220.48 $ 138 Runway 13 PARI (Complete) 1 1 L.S. 1.00 22,048.00 $ 22,048.00 139 Runway 31 PARI (Complete) 1 1 L.S. 1.00 22,048.00 $ 22,048.00 140 Electrical Vault Work I 1 L.S. 1.00 2,756.00 $ 2,756.00 141 Surcharge 19,400 19,400 C.Y. 19,000 2.09 $ 39,710.00 142 Settlement Plate Unit 3 3 Ea. 3 551.20 $ 1,653.60 143 ISettlement Plate Unit Alternate 3 3 Ea. 3 881.92 $ 2,645.76 144 ISettlement Plate Surveying 33 33 Ea. 33 100.32 $ 3,310,56 145 Settlement Plate Surveying Alternate 3 3 Ea. t + 1P � {+j.i4�i �+ii,,,=!,.: 385.84 $ CHANGE_'O_ RDER ITEMS 146 1 Repair Existing Waterway �l++r 1U��+ e`;r�i� 14 1 1 Ea. 1 4,700.00 $ 4,700.00 Total Complete As Of 11/7!09 $ 388,505.96 Original Contract Amount: $ 418,887.07 Current Contract Amount With All Approved Change Orders: $ 441,777.17 As Project Engineer, I hereby certify that the quantities Less 0 Days Of Liq. Damages @ $1,000.00/Day $ shown above have been completed from measurements made by me or my assignees and that the work has been Less $5,000 Retained: $5,000.00 performed in a reasonable close conformity with the plans and specifications. Less Previous Estimates Progress Est No.1 $ 122,152.62 Progress Est No. 2 $ 73,594.15 Progress Est No. 3 $ 53,443.61 Date: / Progress Est No. 4 $ 98,360.60 Andrew W. Beil, P.E. Progress Est $ - HWS Consulting Group Inc. Progress Est $ 9 Progress Est $ Dater �� 0 / TOTAL DUE THIS ESTIMATEI $ 35,954.98 N Engineer Approve&Foayr"mnt Per Project Engineer's Certification Working Days Utilized 44 of 44 Working Days As Of 11107/09: Date: � Approved For Payment Per Project Engineer's Certification 12/2/2009 Page 2 Of 2 Pay Est. CONSENT OF SURETY �QQ TO REDUCTION IN OR. PARTIAL RELEASE RETAINAGE (SIMILAR TO AIA DOCUMENT G707 A) PROJECT: Partial Parallel Taxiway Grading (South) & 2 -Box (name, address) Blair Municipal Airport, Blair, NE TO (Owner) Blair Airport Authority 218 South 16th Street Blair, NE 68008 1- * PAPI System Installation to Runway 13 & Runway 31 OWNER ❑ ARCHITECT ❑ CONTRACTORN SURETY ❑ OTHER ARCHITECT'S PROJECT NO; CONTRACT FOR; AIP 3-31-0109-07 I CONTRACT DATE: None Specked In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (here insert name and address of Surety as it appears in the bond). Developers Surety and Indemnity Company PO Box 19725, Irvine, CA 92623-9725 , SURETY, on bond of (here insert name and address of Contractor as it appears in the bond) Valley Corporation 28001 Ida Circle, PO Box 589, Valley, NE 68064 CONTRACTOR, hereby approves the reduction in or partial release of retainage to the Contractor as follows: from 10010 to $5,000 The Surety agrees that such reduction in or partial release of retainage to the Contractor shall not relieve the Surety of any of its obligations to (here insert name and address of Owner) Blair Airport Authority 218 South 16th Street, BIair, NE 68008 OWNER, as set forth in the said Surety Company's bond. IN WITNESS WHEREOF, The Surety Company has hereunto set its hand this Attest: 6.4—� 4�&Uat—� (Seal): 18th day of November , 2009 Developers Surety and Indemnity Company 'Surety Company Signature of Authorized Represeva ive Ronald Lee Kaihoi Attorney -in -Fact _ Title ACKNOWLEDGEMENT OF SURETY STATE OF MINNESOTA COUNTY OF CHIPPEWA On this 18th day of November , 2009 , before me, a Notary Public within and for said County, personally appeared Ronald Lee Kaihoi to me personally known, who being by me duly sworn he/she did say that he/she is the attorney-in-fact of Developers Surety and Indemnity Company, the corporation named in the foregoing instrument, and the seal affixed to said instrument is the corporation seal of said corporation, and sealed on behalf of said corporation by authority of its Board of Directors and said Ronald Lee Kaihoi acknowledged said instrument to be the free act and deed of said corporation. NOTARY PUBLIC My Commission Expires IU REBECCA J. RISA NOTARY PUBLIC -MINNESOTA My Commission Expires Jan. 31, 2010 -fF0•PdMS"M�'-P '. C�70t�JL�Bv'�'+O'PQtJK�