Loading...
2009-11-30 Luxa Construction $342,881.15-HILAIR AIRPORT AUTHORITY 30100 11/30/09 Vendor Number Mint ate LT TXA CONSTRUCTION P Q BOX 145 BLAIR NB 68008 Cie& tY tuber Account Number Description 30900,551.16 3. 3-31-0109-09 f Total $ 342,8$.1..15 I do solenuily swear that the above is true and correct to the best of my lutowledge. ,iitW rlW and sst'ornto before me this 10th day ofDecember, 2009. P Frahm City Treasurer Finance Committee Approval- PROGRESS ESTIMATE STATE OF NEBRASKA DEPARTMENT OF AERONAUTICS Sponsor: Blair Airport Authority 218 South 16th Street Blair Nebraska Airport Name: Blair Municipal Airport (BTA) Contractor; Luxa Construction Co, Inc. 925 E. Dixon Road / P.O. Box 105 Blair, NE 68008 4 COPIES TO DEPT. OF AERONAUTICS Estimate No., 3 Date: November 2, 2009 Project No. AIP 3-31-0109-09 Project: Parallel Taxiway to Runway 13/31 Date of Contract: July 24, 2009 ITEM NO. CHG ORDER TY DESCRIPTION I -] ORIGINAL CONTRACT QUANTITY CHGREVISED ORDER QTY CONTRACT QUANTITY UNIT ESTIMATED QUANTITY TO DATE UNIT PRICE TOTAL SECTION 1 - SOUTH TAXIWAY PAVING 101 Site Preparation 1 1 L.S. 0.60 61960.00 37 176.00 102 Moblllzation 1 1 L.S. 0.90 16 525.00 14 872.50 103 Barricades And Warning Markers 1 1 L.S. 0.50 4,494.00 2,247.00 104 Construction Staking1 1 L.S. 0.85 4,600.00 3,910.00 105 Remove Paint 666 666 S.F. 2.10 - 106 Remove Reflector With Protector 3 3 Each 2 32.00 64.00 107 Unclassified Excavation 6,430 6,430 C.Y. 2,230 2.51 5,597.30 108 6" Crushed P-208 Aociregate Base Course 9,307 9,307 S.Y. 9,056 10.05 91012.80 109 8" P-501 P.C. Concrete Pavement * 7,956 7,956 S.Y. 3,762 30.60 115117.20 110 Duct Marker In Pavement 2 2 Each 100.00 111 Smoothness Test 1 1 L.S. 0.5 1605.00 802.50 112 Silt Fence 500 500 L.F. 1.75 - 113 Erosion Control Maintenance 40 40 Hr. $ 90.00 114 Remove Silt Fence 500 500 L.F. 0.25 115 Painting With Reflective Media 2,100 2,100 S.F. 2.00 116 Painting Without Reflective Media 4 269 1 1 4,269 S.F.1.50 117 Cover Cro Seedin 10.20 10.20 Acre 134.00 118 Airport Seeding 10.20 10.20 Acre 754.00 SECTION 2 - NORTH TAXIWAY. GRADING AND PAVING 201 Site Preparation 1 1 L.S. 0.65 $ 32 465.00 21 102.25 202 Mobilization 1 1 L.S. 0.90 6680.00 6,012.00 203 Barricades And Warning Markers 1 1 L.S. 0.50 4,494.00 2,247.00 204 Construction Staking 1 1 L.S. 0.80 $ 9,095.00 7,276.00 205 Remove Paint 333 333 S.F. 2.10 - 206 Remove Reflector With Protector 21 21 Each 21 32.00 672.00 207 Unclassified Excavation 77,200 77,200 C.Y. 77,200 1 $ 2.48 191456.00 208 TyDe i Pavement Removal 1,788 1,788 S.Y. 1,788 10.65 $ 19 042.20 209 Type 2 Pavement Removal 2,137 2,137 S.Y. 2,137 7.60 16,241.20 210 Type 3 Pavement Removal 964 964 S.Y. 230 3.20 736.00 211 Type 4 Pavement Removal 663 663 S.Y. 2.35 - 212 18" Galvanized CSP 130 130 L.F. 130 36.34 4,724.20 213 18" Galvanized CSP FES 2 2 Each 2 367.00 734.00 214 24" R.C.P. Class III 234 234 L.F. 232 41.90 9,720.80 215 24" R.C.P. F.E.S. 1 1 Each 1 564.00 $ 564.00 216 Grate Inlet 1 1 Each 1 6 270.00 6270.00 217 Concrete Channel Pavement Culvert End Treatment 34 34 S.Y. 26 $ 86.40 2 246.40 218 6" Crushed P-208 Aggregate Base Course 10,317 10,317 S.Y. 8,601 10.50 90 310.50 219 W P-501 P.C. Concrete Pavement * 7,568 7 568 S.Y. 3,510 $ 30.60 107 406.00 220 P-405 Hot Mix Asphalt Pavement 460 460 Ton 153.89 97.00 $ 14 927.33 221 Duct Marker In Pavement 2 2 Ea. 10.00 222 Smoothness Test 1 1 L.S, 0.50 1605.00 802.50 223 Silt Fence 3 808 3 808 L.F. 4,380 1.75 $ 7,665.00 Erosion Control Maintenance 80 80 Hr. 8 90.00 720.00 Turf Reinforcin Mat Class 213 T AA w/ Fertilizer & Seed 2 272 2,272 S.Y. 233 4.75 1,106.75 Erosion Control Blanket Class 16 T B w/ Fertilizer & Seed 9,000 9,000 S.Y. $ 1.18 - Temporary Erosion Check Straw Wattle 415 415 L.F. 155 3.05 472.75 R227 Remove Slit Fence 3 808 3 808 L.F. 129 0.25 32.25 Paintin With Reflective Media 1 991 1 991 S.F. 2.00 - Paintin Without Reflective Media 2 932 2,932 S•F• 1.50 CoverCro Seedin 33.3 33.3 Acre 134.00 Airport Seeding 33.3 33.3 Acre 754.00 233 L-853 Elevated Ede Reflector And Protector Installed 25 25 Each $ 235.00 $ HWS t 52-59-1124 Page 1 Of 2 RECEIVED NOV - 5 2(w5 D5DT. OF AERONAUTICS BTA 09 Est 3.xlsx ITEM NO. CHG ORDER TYQUANTITY DESCRIPTION ORIGINAL CONTRACT CHG ORDER QTY REVISEDESRMATED CONTRACT QUANTITY UNIT QUANTITY TO DATE UNIT PRICE TOTAL SECTION 3 - SOUTH TAXIWAY LIGHTING has been performed in reasonable close conformity with the plans and specifications. 301 Site Preparation 1 1 L.S. 3,424,00 302 Mobilization 1 1 L.S. Progress Est 2 4,301.00 303 Barricades And Warnin Markers 1 1 L.S. 4,494.00 304 Place And Maintain X Each Time Placed And Removed 2 2 Ea, 100.00 305 Construction Staking1 NDA Pproject Engineer 1 L.S. $ 535.00 306 Remove Reflector With Protector 26 26 Ea. TOTAL DUE THIS ESTIMATE 32.00 307 Remove And Salvage Sin 2 2 Ea. Charged As Of 42 236.00 308 1-Wa 2" Schedule 40 PVC Dud In Trench 10/31/2009: 4,968 L.F. 2.50 309 1/c #8 5KV L-824 Cable In Dud 9,254 L.F. 1.70 1/c #6 Green Safe Ground AWG XHHW In Dud 5,214 L.F. 1.70 #6 Solid Bare Counterpoise In Trench 180 4,968 L.F. 130 L -861T Taxiwa Ed e U ht uartz Base Mounted 53 Ea. 792.00 R314 L-85BR Sign, LED 1 Module (Complete) 1 Ea, 5,564.00 L-858R/Y S(n LED, 2 Module Com tete 1 Ea. 6152.00 Ede Light Tas 80 Ea. 17.00 Electrical Vault Work With 10 KW Regulator) 1 1 L.S. 13 535.00 SECTION 3 - ADD/DEDUCi- ITEMS Add 3-1 L-86ITTwy Ede Light LED Fixture In Lieu Of Quartz Fixture Mad Only) 53 53 Each 178.00 Add 3-2 L -861T Taxiway Ede Light, LED New Equipment Onl 27 27 Each 417.00 Deduct 3-3 L-828 10 KW Regulator (Equipment Only) 1 I 1 I L.S. (1,360.00)1 SECTION 4 - NORTH TAXIWAY LIGHTING: Site Preparation 1 1 L.S. 2,354.00 $ Mobilization 1 1 L.S. 1969.00 Barricades And Warnin Markers 1 1 L.S. 4,494.00 r406 Construction Staking1 1 L.S. 535.00 Remove Reflector With Protector 26 26 Ea, 2 32.00 64.00 Remove And Salvage Sign 1 1 Ea. 236.00 407 1 1 1-Way2" Schedule 40 PVC Duct In Trench 4,657 1 1 4,657 L.F. $ 2.50 408 1 -Way 2" HDPE Duct In Trench 106 106 L.F. 3.75 409 i/c #8 SKV L-824 Cable In Duct 5,516 5,516 L.F. 1.70 410 1/c #6 Green Safe Ground AWG XHHW In Dud 4,951 4,951 L.F. 1.70 411 #6 Solid Bare Counterpoise In Trench 4,763 4,763 L.F. 130 412 L-861TTaxiwa Ede Li ht uartz Base Mounted 61 61 Ea. 792.00 $ 413 L -858R SI n LED 1 Module Com tete 1 1 Ea. 5 564.00 414 Ede Light Tas 61 61 Ea. 17,00 SECTION 4 ADD ITEM Add 4-1 1 1 L-861TTwy Ede Light, LED F'ature in Lieu Of Quartz Fixture Mad Only) 61 61 Ea, $ 197.00 * 50% of Quantity Placed Total Complete as of 10-31-09 783 350.43 Original Contract Amount: 1,50;'291.15 As Project Engineer, I hereby certify that the quantities shown above have been Less 10% Retained: $ 78,335.04 completed from measurements made by me or my assignees and that the work has been performed in reasonable close conformity with the plans and specifications. Less Liquidated Damages: $ du Less Previous Estimates .r Date: << 0� 0� Progress Est 1 $ 255,933.12 Allen F. Jambor, P.E. Progress Est 2 $ 106,201.12 Project Engineer - HWS Consulting up Inc. Progress Est 3 $ - Progress Est 4 $ - q Progress Est 5 $ Date: ^' 1 r Progress Est 6 $ NDA Pproject Engineer Progress Est 7 $ Approved For Paymen er Pr 'ed Engine s iflcation J / TOTAL DUE THIS ESTIMATE $ 342,881.15 A roved: 49Y Date: l'C r/ L Working Days Sponsor ---� Charged As Of 42 of 65 Working Days 10/31/2009: HWS # 52-59-1124 Page 2 Of 2 BTA 09 Est 3.xtsx