2020-10-15 Work Order #1 Olsson Runway SurveyMASTER AGREEMENT WORK ORDER
WORK ORDER NO. 1 — RUNWAY 13/31 SURVEY
SETTLEMENT MONITORING 2017 vs 2020
This exhibit dated October 15, 2020 is hereby attached to and made a part of the Master
Agreement for Professional Services dated October 15, 2020 between Blair Airport Authority
("Client") and Olsson, Inc. ("Olsson") providing for professional services. Olsson's Scope of
Services for the Agreement is as indicated below.
Crl01:011/_l4
Olsson has acquainted itself with the information provided by Client relative to the project and
based upon such information offers to provide the services described below for the project. Client
warrants that it is either the legal owner of the property to be improved by this Project or that Client
is acting as the duly authorized agent of the legal owner of such property.
PROJECT DESCRIPTION AND LOCATION
Project will be located at: Blair Municipal Airport, Blair, Nebraska
Project Description: Work Order No. 1: Runway 13/31 Survey —
Settlement Monitoring 2017 vs 2020
SCOPE OF SERVICES
Olsson shall provide the following services (Scope of Services) to Client for the Project:
Task 1: Field Survey
Reference 2017 Survey completed by Olsson on Runway pavement areas that
had exhibited settlement and had been repaired.
Survey same spot elevations on both the concrete and asphalt pavement locations
to determine if additional settlement has occurred.
Task 2: Deliverables
Provide exhibit depicting the differences in data obtained from 2020 field survey
and 2017 field survey. Drawing will identify the settlement amount.
Should Client request work in addition to the Scope of Services, Olsson shall invoice Client for
such additional services (Optional Additional Services) at the standard hourly billing labor rate
charged for those employees actually performing the work, plus reimbursable expenses if any.
601 P Street / Suite 200 / Lincoln, NE 68508
0 402.474.6311 / olsson.com
Olsson shall not commence work on Optional Additional Services without Client's prior written
approval.
Olsson agrees to provide all its services in a timely, competent and professional manner, in
accordance with applicable standards of care, for projects of similar geographic location, quality
and scope.
SCHEDULE FOR OLSSON'S SERVICES
Unless otherwise agreed, Olsson expects to perform its services under the Agreement as follows:
Anticipated Start Date: August 29, 2020
Anticipated Completion Date: October 5, 2020
Olsson will endeavor to start its services on the Anticipated Start Date and to complete its services
on the Anticipated Completion Date. However, the Anticipated Start Date, the Anticipated
Completion Date, and any milestone dates are approximate only, and Olsson reserves the right
to adjust its schedule and any or all of those dates at its sole discretion, for any reason, including,
but not limited to, delays caused by Client or delays caused by third parties.
COMPENSATION
Client shall pay to Olsson for the performance of the Scope of Services a lump sum of seven
hundred and fifty dollars ($750.00). Olsson's reimbursable expenses for this project are included
in the lump sum. Olsson shall submit invoices on a monthly basis, and payment is due within 30
calendar days of invoice date.
TERMS AND CONDITIONS OF SERVICE
We have discussed with you the risks, rewards and benefits of the Project, the Scope of Services,
and our fees for such services and the Agreement represents the entire understanding between
Client and Olsson with respect to the Project. The Agreement may only be modified in writing
signed by both parties.
Client's designated Project Representative shall be Rod Storm and Geary Combs.
Page 2 of 3
If this Work Order satisfactorily sets forth your understanding of our agreement, please sign in the
space provided below. Retain a copy for your files and return an executed original to Olsson.
This proposal will be open for acceptance for a period of 30 days from the date set forth above,
unless changed by us in writing.
OLSSON, INC.
By —
By signing below, you acknowledge that you have full authority to bind Client to the terms of the
Agreement. If you accept this Work Order, please sign:
BLAIR AIRPORT AUTHORITY
Byilkvulk'
Si Lure
Print Name
Title L G'r�/���� Dated:
Attachment
Runway Topographic Survey 2017 and 2020 Comparison
Page 3 of 3
By
By —
By signing below, you acknowledge that you have full authority to bind Client to the terms of the
Agreement. If you accept this Work Order, please sign:
BLAIR AIRPORT AUTHORITY
Byilkvulk'
Si Lure
Print Name
Title L G'r�/���� Dated:
Attachment
Runway Topographic Survey 2017 and 2020 Comparison
Page 3 of 3
NORTHWEST AREA
CONCRETE
0�6 Oohk
ODk 0�1 00 0�1 0�1 Ooh Oak 0�1 Oa
h ry h 1
®
T
/p/po op +o- +0ry 1 1 ry h0600 00 00 00 00 0. 00 00 Dry 00
h I
/00 1
+00 +/oo +/po +pp1 +Dory +opo #apo +/oo ,00+,00
1 ,0� ,0� ,0� 000 000 000 000 ,0� 001 0
01 Ok Oh 00 O9 06 06 06 I 06 h
+oo+,o +,o +,o +,p +,o +,o +,o +,o
b I 00 Ok 06 06 01 Oy 01 Oh I Oh 09
1 0 1 1 0 0 h 6
-/00 +/0p +/0p +/0p +/00 +/0p/0p ,0pry
ASPHALT
h
op'��/po+o°1
00 ry 0 k l 6 1
0k /00 /00 /00 /00 /00 /00 // / 0
k h 1 I 11 1
01(/p01+/p0h+,o0 +,°0 +/0°6+,00 +/00 +'00 t'0/00
I
N 0 0 9 ry k 1 0
+,p� I ,p� +,p1 +,00 +,0� +,ri. fj- +,0� pp1 p�0 00
+z +2 +
01 O6 Oh ry ry
+/p1 +/00 +,006+/° +/° +/0 +/00 +/00 -Iz - /00 +OOh
0' 20' 40' 80'
SCALE IN FEET
h1 ry 1 1 ry 0 ry k I
fib
1
0� 10� 0� 0Tooo +�°o +/oo +/oo +/°o +/°o +/oo +°01I`/op+°p1
T1I1i-°oo/oo -�°oo +°�O �op-I
* °oo +°°1 +�°o +°oo +°po +°Dry
o°k�.00' 0°1 0°° 0°1 0°1 o°ry o°o °°1�0°0
CONCRETE
PROJECT NO: 019-3440 BLAIR AIRPORT RUNWAY 601 P Street, Suite 200
08
DRAWN BY: ARJ COMPARISON SURVEY O��n
P.O.cola, N 4685
+�+�+ Lincoln, NE 68508
TEL 402.474.6311
DATE: 10/05/2020 (2017 TO 2020 ELEVATION COMPARISON) I FAX 402.474.5160
SOUTHEAST AREA
CONCRETE
.°pry .°ory .°o' .13 � .°dry p° 0
+ +•0.01 ry+ �+•
°01 I oo` ooy ooy ofj oF' .°01 00`� ooy oh,{-°o+°p -�°o
+ oh oti oti
N+,o°,+°o° -I ,o°, -I -°o` -I °ok +°°p /rip°0�0 °
°o
,Ooryi 0` 0, 0° 0` 0° 0` 0, 0,03 °ry-}-'01+ Op1
+ tp +0 +° +° +° +° +p +° 0. +° 0.0+.01
poll I °o` ,o° ,00 ,00 00° poi ,o° 000 0.01
-ao1 0.01
-0.01 p1
0.01 ,o
0. 02 p\
°o� �p0 �OOry ppo. °°o pp1 �po� ppo �po�
+ + + + + + + + �09
0.01
®rye 00"� 000 009 Doh 006 006 005 Dory 0o�00k
+0' —f' —F'
01 I 0'h 0'h °0` OOk p°'h °0 °01 p° I Oo1 O6
+gyp. gyp. +gyp. +� +� +, • +p, +, +p. i +p•
ASPHALT
05 -I- . -Is p, 0'I'
+pp+�°o, +pp1-f?, -1Z °o,- p- ��oo+°ob
-19 Az -fz -I p ap-I?,
I?, +,0
ps i°�� i°�k i°Ory pry i°1�
°013
I poo poo pot po\ pO$ °Ory poo poo poo 11'
601PStreet, Suite 200
O��n P.O. Box 84608
+�+� Lincoln, NE 68508
TEL 402.474.6311
FAX 402.474.5160
DRAWN BY: ARJ
DATE: 02/25/2020
i°O�)
+ ,
p0ry
p0ry
--p 1+
00�
,
-f-'00
°00+°Ok
°p'h
+
°°k+°°
�P
OOkt°Oh
00�
°Ory
pOry 006
,00� 00°
°0`
0°k
CONCRETE
0' 20' 40' 80'
SCALE IN FEET
PROJECT NO: 019-3440
BLAIR AIRPORT RUNWAY
COMPARISON SURVEY
(2017 TO 2020 ELEVATION COMPARISON)
601PStreet, Suite 200
O��n P.O. Box 84608
+�+� Lincoln, NE 68508
TEL 402.474.6311
FAX 402.474.5160
DRAWN BY: ARJ
DATE: 02/25/2020