2006-03-14 Fiberoptic to city buildingsContract
THIS CONTRACT AND AGREEMENT made and entered into this 14th day of March,
2006 by and between the City of Blair, hereinafter referred to as "Owner", and KRW
Construction, Inc., hereinafter referred to as the "Contractor"
WITNESSETH:
Contractor, for and in consideration of the sum of $24,847.75 payable as set forth
in this contract, hereby agrees to perform, in accordance with the specifications, the
various items of work awarded said contractor on the 14th day of March, 2006, as
follows: As shown in bid submitted on March 6, 2006.
That it is mutually understood and agreed by parties hereto that the Contractor's
Bond, the proposal Project Specifications, Special Provisions and all supplemental
agreements are a part of this contract.
The Contractor expressly warrants that they have no third party to solicit or obtain
this contract in their behalf or to cause or procure the same to be obtained upon
compensation in any way contingent in whole or in part, upon such procurement, and that
they has nor paid or promised or agreed to pay to any third person in consideration of
such procurement or in compensation for service in connection herewith, any brokerage,
commission, or percentage upon the amount to be received by them hereunder, and that
they have not, in estimating the contract price determined by them, included any sum by
reason of any such brokerage, commission or percentage; and that all monies payable to
the Contractor hereunder are free from obligation of any other person for services
rendered or supposed to have been rendered in the procurement of this contract.
Contractor further agrees that any breach of this warrant shall constitute adequate cause
or the annulment of this contract by the Owner, and that the said Owner may retain for its
own use, from any sums due or to become due hereunder, an amount equal to any
brokerage, commission or percentage so paid or agreed to be paid.
All work required in carrying out this contract shall be performed under direct
supervision of the Owner or its representative in compliance with the laws of the State of
Nebraska.
Contractor also states that they will comply with Fair Labor Standards in the
performance of this contract.
That the Contractor further agrees to supply and pay all just claims for materials,
supplies, tools, fuels, lubricants, equipment, rental, machinery insurance premiums and
services used or consumed in the construction of the work by them or any of their
subcontractors in carrying out the provisions of this contract, and further agrees that the
Contractor's Bond shall be held to cover all such claims.
That in consideration of the foregoing, the Owner hereby agrees to pay the
Contractor promptly the amounts set forth herein subject to the conditions set forth in this
contract or any part thereof as herein described.
It is further understood and agreed that the Contractor shall not do any work or
furnish any materials not covered and authorized by this contract unless ordered in
writing by the Owner, Any such work which may be done or any such materials which
may be furnished by the Contractor with out such written order first being given shall be
at their own risk, cost and expense; and the Contractor hereby convents and agrees that
they shall make no claim for compensation for any work so done or any materials so
furnished.
IN WITNESS WEREOF, the parties hereto have set their hands for the purpose
herein expressed to this instrument this 14"' Day of March 2006.
CITY OF BLAIR CONTRACTOR
*es Ralph, Mayor
ly-1
Attest:
&nl X dhd—
Brenda R. Wheeler
City Clerk
President
Secretary
Specifications for Fiber Optic Cabling for Blair City Hall, Library,
Police Department and Washington County Court House
The City of Blair is requesting proposals for the purchase and installation of fiber optic
cable and conduits to the city's police station, library, city hall and Washington County
Court House. Please submit you proposal including materials, labor and equipment on
per lineal foot basis. All right-of-way restoration shall be considered incidental to the
price listed for each bid item including but not limited to concrete, seed, grading and
general cleanup.
• Fiber optic cable shall be Multimode 62.5 micron fiber
• 12 -strand fiber optic cable with metal sheath for future locating.
• Leave a service loop at each of the four locations of 25 LF
• Entrance to the Blair Police Station will be on the south wall approx. 30 feet from
the southeast corner of the building. Contractor will be required to place conduit
on the exterior wall for approx. 3 -feet then penetrate the exterior wall with a core
drilled hole. Once through the exterior wall the cable will be bent to the east to
the nearest partition wall in conduit then ran inside the partition wall to above the
drop ceiling then to the control room leaving a 25 Lineal Foot spool of cable on
top of the drop ceiling in the southwest corner of the room. Internal cabling is
approx. 43 LF with 5 LF in conduit.
• Entrance to the Blair Library will be on the south wall approx. center of the west
side of the building into the mechanical room. Contractor will be required to
place conduit on the exterior wall for approx. 10 feet then penetrate exterior wall
with a core drilled hole. Once through the wall the cable will be ran in conduit on
the west wall of the mechanical room to the north wall then up the wall to above
the adjacent room drop ceiling then through the block wall and over the drop
ceiling to the northeast corner of the director's office leaving a 25 lineal foot
spool in this location on top of the drop ceiling. Internal cabling is approx. 42 LF
with 16 LF in conduit.
• Entrance to the Blair City Hall will be on the west wall to the below grade room
below the main room north of the main building entrance. Once through the wall
the cable shall be ran along the north wall in conduit to the east wall then up the
east wall to above the adjoining room's drop ceiling then through the wall and
along the drop ceiling to the copier room south wall leaving a 25 lineal foot spool
of cable on the drop ceiling. Internal cabling is approx. 70 LF with 30 LF in
conduit.
• Entrance to the Washington County Court House is on the north wall of the new
annex to the mechanical room below grade then along the floor joist of the upper
floor in conduit to the computer room then leave a 35 lineal foot spool of cable on
top of the drop ceiling. Internal cabling is approx. 60 LF all in conduit.
• All fiber optic cable will be placed in conduits bored into the ground not less than
4 feet below grade. Bidder will need to include with their bid a description on the
type and size of conduit they will be using for the project.
• Lengths of conduit and fiber optic cable for each run are as follows: (All distances
listed are approx. and will be paid on a per lineal foot basis)
o Blair Police Department to Blair City Hall: 830 LF
o Blair Library to Blair City Hall: 400 LF
o Washington County Court House Annex to Blair City Hall: 1020 LF
Attached are maps showing the proposed routing and location of the conduits between
each building listed.
Winning bidder shall show proof of insurance before final contract execution.
Bid price for each item shall include all materials, equipment and labor for the work
described in the specifications.
Bid Price per Lineal Foot for Fiber Optic Cable in Building not in Conduit:
Bid Price per Lineal Foot for Fiber Optic Cable in Conduit:
$ oa 111 = 999, co
Bid price per Lineal Foot for Under Ground Installation:
Contractor Name:
Address: 5-2-5— J�- / 5T
Phone Number: 5-133 - P%10
Authorized Signature:��.,��
'7Z) -�o 16 od _ ZLI c3 It ^7.7-6