Loading...
1995-08-22 Blair Area Chamber of Commerce; Mini Park at 19th and Washintgon4 2- � — 8/1 /c 6k APPLICATION FOR KENO FUND Name of organization requesting funds: Blair Area Chamber of Commerce 1526 Washington Street Blair, NE 68008 Contacts: Patty Plugge, Executive Director Mark Miller, 1995 President History, goals and objectives: The Chamber of Commerce is a business organization that strives to make Blair a better place to do business, through both internal and external betterment. Enclosed is copy of our program of work for 1995 which includes our mission statement, and goals and objectives. Project identification: We are proposing a joint project with the City of Blair that would include the construction of a mini park on the vacant lot at 19th and Washington Street. The project would also include replacing the two "Blair .... A Promise of Quality" billboard signs on East and South Highway 30. Specifics - The vacant lot to the west of Blair West Pharmacy would become a mini park with decorative sidewalk winding diagonally from Washington Street to 19th Street. The traffic signal control box, which is now at the corner at the front of the lot, would be relocated to the rear of the lot. In the center would be a circular keystone block planter and conversation area. Landscaping would include many berms to give the area character, and an assortment of trees and shrubs. (See appendix A) Anchoring the southwest corner would be a ten -foot wide by three-foot high brick and avonite sign that simply says "Blair" in 12" brass lettering. (See appendix B) Grass and ground covering with an underground sprinkler system would complete the setting. The City of Blair has agreed to provide the maintenance. As for the entrance signs, two fifteen -foot wide by three-foot high signs of the same construction as the mini park signs would replace the plywood billboard signs. There would be ground level lighting for illumination at night. Professional landscaping with decorative shrubs and ground cover would surround each sign. Total Costs: See appendix C. We would ask for $15,000 out of the keno fund. This would represent 25% of the total project cost. This would leave $25,000.00 to be raised through private donations. Total Project - Scenic Enhancement Grant City Contribution Chamber Contribution Keno Contribution Private Donations Total Time Frame: $60,300.00 - 12,800.00 21% - 2,500.00 4%� - 51000.00 8%V - 15,000.00 25% - 25,000.00 42% $60,300.00 100% We hope to begin this project by September 1. The fall weather would provide an opportune time for the planting of the landscape trees and shrubs. We would anticipate requesting the money by September 15, 1995. NEW - IL N�vw I 7'Atz" , - 771 Appendix B SCENIC ENHANCEMENT PROJECT PROJECT COST 19th & Washington Landscaping - Trees, Shrubs & Labor $8,000 Dirtwork and Grading 2,500 Keystone Walls 2,400 Sidewalk 1,100 Watering System 1,500 Flagpole 500 Blair Sign 8,700 Relocate Traffic Signal Control Box 6,200 East & South Highway 30 Landscaping Trees, Shrubs & Labor 6,000 Easements 2,000 Blair Signs 19,400 Lighting For Blair Signs 2.000 $60,300 PROJECT COST REDUCTIONS Scenic Enhancement Grant - State (80%) -$12,800 Landscaping - Trees, Shrubs and Labor Dirtwork & Grading - City Contribution -2.500 Total Project Cost Appendix C -$15,300 $45,000 9