2009-08-11 Black Elks; Neihardt Park Trail Paving Project, Promises
DATE:
MAYOR AND COUNCIL
BLAIR, NEBRASKA
GENTLEMEN:
I WISH TO APPEAR BEFORE THE COUNCIL ON O'A�� LA,
WITH AN ITEM TO BE CONSIDERED AS PART OF THE SNDA.
cl/ v
SIGNED
ADDRESS ) c��
I
BLACK -ELK - NEIHARDT PARK, INC
PHASE 3: PROPOSED NEW SIDEWALK WOULD RUN AROUND
THE WEST SIDE OF THE WATER TOWER RUNNING SOUTH. THE
SIDEWALK IS TO START AT TBE NORTH PICNIC PAD NORTH OF
THE WATER TOWER AND EXTEND SOUTH TO THE EXSISTING
SIDEWALK THAT RUNS WEST TO THE WEST PICNIC PAD.
THE SECOND SECTION OF SIDEWALK WOULD RUN EAST TO THE
ENTER SECTION OF THE LOOP TRAIL AND THEN TURN AND GO
BACK NORTH TO THE END OF THE SECTION OF SIDEWALK
INSTALLED IN 2008.
PROJECT FUNDS THAT ARE PLEDGED AS OF 8-1-2009 ARE LISTED
BELOW
B -E -N INC FUNDS
COMMUNITY FOUNDATION
WASHINGTON COUNTY BANK
TRAILS COMMITTEE
TWO RIVERS BANK
CITY B -E -N SIDEWALK FUNDS
TOAL ON HAND OR PLEDGED
$2946.64
$4000.00
$1600.00
$3500.00
$2000.00 to be collected
$8000.00 to be collected
$22,046.64
TOTAL NEEDED TO COMPLETE SIDEWALKS FOR THIS PHASE = $28,000.00
TOTAL NEEDED FOR 3 REST AREAS BENCHS TO BE INSTALLED =$2,400.00
TOTAL PROJECT COSTS OF = $30,400.00
BLACK-ELK-NEIHARDT PARK BOARD WOULD LIKE TO ASK FOR
KENO FUNDS IN THE AMOUNT OF $8,000.00 IN ORDER TO
COMPLETE PHASE 3 AS LISTED ABOVE.