2008-02-12 Black Elk- Neihardt Park,0+ 21140'a BLACK ELK - NEIHARDT PARK, INC PROJECTED MAINTENANCE COSTS PHASE 1: INTERPRETIVE GARDEN COMPLETED Occasional cleaning and repairs for site will be minimal costs of $40.00 per yr., except in the case of a sign being vandalized, witch are valued at 700.00 EA. PHASE 2: RELIGHTING TOWER WITH 5 NEW FIXTURES, WIDENING AND REPLACING SIDEWALKS AND INSTALLING AERIAL VIEW SIGN OF ENTIRE PARK. Occasional cost of cleaning, and concrete replace of $35.00 per yr. Replacement costs of signage if vandalized would be $1500, and replacement of fixtures would cost $800.00ea PHASE 3: NEW SIDEWALK AROUND SOUTH, WEST, AND NORTH SIDES OF TOWER Projected maintenance cots for sidewalks would be around $35.00 per year (1 panels a yr or 'h yrd) PHASE 4: NEW SIDEWALK AROUND NORTH SIDE OF PARK Projected maintenance costs for sidewalks would be around $140.00 per year (4 panels per yr or 2 yrds) Phase 5: ANCHOR PROJECT (SHELTER, TERRACE AREA, OTHER) Projected maintenance costs to be determined later as plans evolve. BLACK ELK - NEIHARDT PARK, INC PHASE I - INTERPRETIVE GARDEN COMPLETED 10- 13-2007 AT A COST OF $12,102.00 PHASE 2: RELIGHTING TOWER WITH 5 NEW FIXTURES, WIDENING AND REPLACING SIDEWALKS AND INSTALLING ARIEL VIEW SIGN OF THE 1NTIRE PARK. PROJECT COSTS: Lighting & installation $7,500 Sidewalk widening & replacement 4"fibeimesh (482' x 8' = 3 856S x $2.70) $10,500 Site sign & support bracket $2,400 Bench costs $2,000 Plantings& landscape block $1,000 Total Phase 2 Costs $23,400 PHASE 3: NEW SIDEWALK AROUND SOUTH, WEST, AND NORTH SIDES OF TOWER Sidewalk: 900' x 8' = 7,200SF x $3.00 $21,600 PHASE 4: NEW SIDEWALK AROUND NORTH SIDE OF PARK Sidewalk: 3,600' x 8' = 29,000SF x $3 $87,000 4 Rest Areas x $1800ea $7,200 Total phase 3 costs $85,500 Phase 5: ANCHOR PROJECT (Shelter, Terrace Area, Misc. Items) $40,000 TOTAL COST FOR PHASE 1 THROUGH 5 = $182,902 BLACK ELK - NEIHARDT PARK, INC TOTAL COST FOR PHASE 2 = $23,400.00 FOUNDATION GRANT -$4,000.00 BLACK ELK - NEIHARDT INC. - $8,000.00 MISCELLANEOUS DONATIONS -$1,400.00 PARKS BUDGET -$3,000.00 KENO FUNDS REQUEST $7,000.00 LOT