KENO FUND APPLICATION
VETERANS MEMORIAL FIELD
In 1998 a group of local citizens had organized to renovate on of Blair's oldest
and most significant recreational facilities; Veterans Memorial Field
We have completed two phases of the renovation over the past 3 1/2 years at
a total cost of approximately $135,000 in volunteer time and money.
We have now been fortunate to receive 4 steel lite poles from the Valmont
Foundation with the help of Mike Boeka. Out budget for placing and mounting
new lites is as follows:
Cost of Poles — Valmont (paid)
$ 413.00
Setting Base — OPPD
1,563.00
Setting Remaining 2 sections — OPPD
1,563.00
Remove Old Poles & Lites — OPPD
1,389.00
Make Kite Brackets — Kelly Ryan (may be
500.00
Donation)
New Lite Fixtures
2,800.00
New Bulbs
800.00
Plough New Wire — Huntel (may be donation)
1,600.00
Purchase New Wire
1,500.00
Install New Wire in Poles — Volunteers
-----
Final wiring & Lite Alignment -Superior Lighting
1,680.00
Park Staff to make repairs & help OPPD
500.00
Rock for Base — Ft. Calhoun Stone
100.00
Repair existing cross arms/replace burned
840.00
out bulbs
$15,248.00
OPPD would like to schedule time in March. The project must be
operational by the middle of May for season opening. The Vets Field Committee
now ask for your approval of funds to cover the OPPD costs, which are bid for a
total of $4,515.00. Copy of bid from OPPD attached.
Bernie Kros
Vets Field Committee
Omaha Public Power District
Irvington Center
10407 State Street
Omaha, NE 68122
Fax 402-552-5223
January 23, 2003
Mr. Pat Long
City of Blair
218 S 16 ST
Blair, NE 68008
Dear Pat,
I have the estimates for the installation and removal of the outfield lights at Veteran's
field in Blair. The estimates for the various options are listed below:
Estimate #1 - OPPD to install'4 light bases - $1,563.00.
Estimate #2 OPPD to install additional 2 sections on all 4 bases previously installed -
$1,563.00
Estimate #3 - OPPD to remove existing 90' wood poles with existing lights removed -
$1,042.00.
Estimate #4 — OPPD to remove the existing lights on the existing wood poles - $347.00.
Estimate#1 assumes that the rock backfill will be provided and that the City of Blair will
provide the labor to install the rock backfill.
Estimate #2 assumes that the sections are bare and OPPD will not be installing any lights
or hardware.
Estimate #3 assumes that all existing lights and hardware have been removed from the
existing 90' wood poles prior to OPPD removing them.
All estimates will require OPPD to drive heavy equipment on property. OPPD will not
be responsible for repair of property that could be damaged during the process of setting
or removal of poles as well as the installation or removal of lights:
Employment with Equal Opportunity 4 1 7 1