Loading...
2001-11-13 Blair Fire Station Sign3 Keno Proposal: A) Organization involved = Blair City Council. B) The City of Blair spent approximately $900,000 on the construction of the new fire station located at 19th and Nebraska. As part of the construction, a sign was constructed along with landscaping to make the area more appealing to the Community. The sign that was constructed is nearly impossible to read. After several different alterations were explored, it was decided to inlay a granite sign into the existing brick facing that can be read easily from the Highway. C) Estimated Cost for the sign only - $3530.00. This sign is part of a project with a total cost of $903,500. D) Keno Funds requested = $3530 or less than 1% Balance will be City Funds SCHMIDT MONUMENT CO Phone:402.428 2527 MONUMEATOO P.O. Boa352, Blair, NE 88008 Frei: 402.426.2527 email: Wednesday, August 22, 2001 CITY GF BLA.II2 213 SOUTH 10th S BL.As.�?, NE. 08008 - SUBJECT; READABLE BLAIR FM DEPARTMENT SIGN GREETINGS, AS REQUESTED, THE SCj9 = MC3I`1 TI IENT CO., INC. PROPOSES TO RE - LP,=j3R BOTH SIDES OF Tom', EXISTING BLAIR FIRE DEPARTMENT SIG N LOCATED AT = NEW FSE STATION. THE M-4TEMA-11,1XIILz RE GRAY GR.AiINIT"I^E' INSETS 04 INCHES LONG, 24 INCIIES HIGH AND 4 INCHES DEEP WITH 8 INCH HIGH LETTERING, THIS SIGN WILL BE READABLE TO STREET TRAFFIC. THE TOTAL COST OF THIS PROJECT WILL BE $ 3530.00 WHICH INCLUDES $ 27130.00 FOR TE SIGNAGE AND $ 800.00 TO PETERSEN CONCR=6 AND 3 �tIASONRY T -HANK YOU, JOE PETERSON PARTNER, SC.HUi .IIDT MONUMENT CO., INC. BLAS, NEBRAS A