Loading...
2019-03-13 Blair Park board Meeting Minutes for March 13, 2019 The meeting was called to order at 7:20 p.m. Present: Neal Jensen, Jeene Hobbs, Todd Wick, Joe Burns, Parks superintendent Pat Long. No bills presented. Old business: th 1. Arbor Day tree planting update: Tree planting is scheduled at Library for April 26. New business: 1. 2019 Parks and Cemetery Projects: Pat long presented a long list of projects. The projects included Spring cleanup in all of the parks, Triple Crown Baseball tournament, paving at cemetery, work on two playgrounds, Arbor Day Celebration, Baseball, Clean up at Dana ball fields. Contracts have been signed for work to begin at Tower of 4 Winds. The Optimist Park boat ramp rail system is ready to be installed, when weather permits. Other projects include planting 20 trees, Gateway, as routine maintenance. Pat Long plans to hire 8 to 9 seasonal staff to fill the 6 full time positions of 1200 hours each between the end of March and Thanksgiving. Another project is designing new gate pillars and gates for the cemetery to be paid for by a benefactor. 2. Stemmermann and Steyer Projects Estimates from two vendors on costs for playground equipment and installations have risen considerably. The combined estimated cost for the Steyer Park and Stemmermann Park projects is $188,297. The budgeted cost is $190,00. Architectural design of Steyer Shelter will have to be put on hold until the next budget and work put off until 2020. 3. Friends of Arboretum meeting is scheduled for Wednesday, March 2, 2019. 4. A resident has requested a handicap swing be added to one of the city playgrounds. The estimate cost of an adult platform swing would be $3,000. The meeting was adjourned for lack of a quorum at 7:50 when Joe Burns had to leave. Respectfully submitted by Joe Burns March 25, 2019