Loading...
2006-6 Rural Water Rates6/21/05 CITY OF BLAIR RURAL WATER CUSTOMER TAP FEES All fees must be paid prior to tap. 1. Rural customers that directly connect to water mains constructed by the City of Blair at city expense shall pay a tap fee of $33000.00. 2. Rural customers that connect to a water main that is constructed and paid for by a district or developer pays for the water main construction shall pay a tap fee of $750.00. 3. Rural customers that tap onto a water main that is owned and maintained by the developer on Highway 75 South (OPPD Water Main) shall pay a tap fee of $1,200.00. The City of Blair will only be responsible for the city water mains and not for any water mains within the development or feed the development. Oak Park I, 11, IV the City of Blair will continue to read individual meters and bill the rural customers directly and bill the developer for any water loss within the development recorded by the master meter. Homeowner: Responsible for all materials and labor to construct line. (Corporation stop, curb stop, meter pit, line material, backflow preventer, etc.) Meter furnished by City of Blair and installed at homeowners' expense. Service line from main to curb stop to be solid copper or copper with flared couplings. Curb stop: On rural systems which serve multiple housing units, an individual curb stop must be installed on the service line to each residence at the time of connection. On existing rural systems, an individual curb stop must be installed in the existing service line to each residence prior to the activation of the system. Curb stops must be installed on public right-of-way prior to homeowners' property line.