Loading...
1984-03March 198? MERCHANDISE FOR SALE Water Department *'Corporation Stop, 3/4" 9.50 Corporation Stop, 1" 14.18 *Curb Stop Box (Cast Iron,& 22.25 Plastic) (Sell complete only) $ 5 Curb Stop Box Extension, 9" 6.15 Curb Stop Box Extension, 16" 7:70 *Curb Stop, Flare, 3/4" 2-G-: 5 AI Curb Stop, Iron Pipe, 3/4" 16.75 Curb Stop, Flare, 1" 30.05 Curb Stop, I.P. 1" 25.55 Valve Meter, 3/4 - 5/8" Spuds 10.30 Valve Meter, 1 x 3/4" 12.88 Repair Lid for Stop Box 8.00 Meter Connector or spud 3.10 Water Meter Repairs (Frozen Meters Labor Charge 10.00 Meter Bottom 4.35 Meter Gasket .25 Bolt (Up to 4 per meter) .40 Sewer Department Zep Flo Acid 5.85/gt. Fitch Plumbing & Heating- 1757 Front Chapman Plumbing - 767 Iowa St. -P-AA q0 M & W Plumbing - Box 273, Ft. Cal. 68023 Terry Ray - 734 N. 14th Northside Plumb. (Carritt) -RFD, Blair Rich Golden - 1209 Fairview Dr. Schroeder Const- Rt #1, Elkhorn, 68022 W.T.P. - 742 East Fairview Dr. W.W.T.P. - 850 East Fairview Dr. CHARGES FOR UTILITY POWER EQUIPMENT Unit W.O. USE RENTAL FEE PER HOUR`_; 1,3,7 Pickups $ 5 $ 7.50 Air Compressor 12.50 Jack Hammer 7.50 Backhoe 20. 40. w/ Man Pipe Thawer 10. / hr. Thawing Water Lines (Incl. Labor) 25. / hr Chipper Truck 20. 20. + Labor Sewer Cleaner 10. 25. Incl. " NOTES LABOR COST = Man's hrly wage x 2.5 Tar-, pe -r 410 00