2018 Valley Corporation - 2018 Sanitary Sewer ProjectAGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT (STIPULATED PRICE) THIS AGREEMENT is by and between City of Blair, Nebraska Vallev Corporation Owner and Contractor hereby agree as follows: ARTICLE 1— WORK ("Owner") and ("Contractor"). 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: approximately 1,310 LF of 8 IN sanitary sewer and appurtenances; site preparation for installation of the new sewer; and replacement of sidewalks and paving. ARTICLE 2 —THE PROJECT 2.01 The Project, of which the Work under the Contract Documents is a part, is generally described as follows: Sanitary Sewer Improvements. ARTICLE 3 — ENGINEER 3.01 The part of the Project that pertains to the Work has been designed by HDR Engineering, Inc. 3.02 The Owner has retained HDR Engineering, Inc. ("Engineer") to act as Owner's representative, assume all duties and responsibilities, and have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents. ARTICLE 4 — CONTRACT TIMES 4.01 Time of the Essence A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. 4.02 Contract Times: Dates A. A Notice to Proceed is expected to be delivered by June 1, 2019. B. The 13th Street Sanitary Sewer Improvements shall be substantially complete on or before August 1, 2019. C. The Park Street Sanitary Sewer Improvements shall be substantially complete on or before October 1, 2018. D. All Work shall be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before October 31, 2019. EJCDC® C-520, (Rev.1), Agreement Between Owner and Contractor for Construction Contract (Stipulated Price). Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1 of 6 4.03 Liquidated Damages A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial and other losses if the Work is not completed and Milestones not achieved within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with the Contract. The parties also recognize the delays, expense, and difficulties involved in proving, in a legal or arbitration proceeding, the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty): I. Substantial Completion: Contractor shall pay Owner $1,000 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified in Paragraph 4.02.A above for Substantial Completion until the Work is substantially complete. 2. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner $500 for each day that expires after such time until the Work is completed and ready for final payment. 3. Liquidated damages for failing to timely attain Substantial Completion and final completion are not additive and will not be imposed concurrently. ARTICLE 5 — CONTRACT PRICE 5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents the amounts that follow, subject to adjustment under the Contract: A. For all Work, at the prices stated in Contractor's Bid, attached hereto as an exhibit. ARTICLE 6 — PAYMENT PROCEDURES 6.01 Submittal and Processing of Payments A. Contractor shall submit Applications for Payment in accordance with Article 15 of the General Conditions. Applications for Payment will be processed by Engineer as provided in the General Conditions. 6.02 Progress Payments; Retainage A. Owner shall make progress payments on account of the Contract Price on the basis of Contractor's Applications for Payment on or about the 15th day of each month during performance of the Work as provided in Paragraph 6.02.A.1 below, provided that such Applications for Payment have been submitted in a timely manner and otherwise meet the requirements of the Contract. All such payments will be measured by the Schedule of Values established as provided in the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no Schedule of Values, as provided elsewhere in the Contract. 1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Owner may withhold, including but not limited to liquidated damages, in accordance with the Contract. E1CDC® C-520, (Rev.1), Agreement Between Owner and Contractor for Construction Contract (Stipulated Price). Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2 of 6 a. 90 percent of Work completed (with the balance being retainage). If the Work has been 50 percent completed as determined by Engineer, and if the character and progress of the Work have been satisfactory to Owner and Engineer, then as long as the character and progress of the Work remain satisfactory to Owner and Engineer, there will be no additional retainage; and b. 90 percent of cost of materials and equipment not incorporated in the Work (with the balance being retainage). B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to 97 percent of the Work completed, less such amounts set off by Owner pursuant to Paragraph 15.01.E of the General Conditions, and less 3 percent of Engineer's estimate of the value of Work to be completed or corrected as shown on the punch list of items to be completed or corrected prior to final payment. 6.03 Final Payment A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06. ARTICLE 7 — CONTRACTOR'S REPRESENTATIONS 7.01 In order to induce Owner to enter into this Contract, Contractor makes the following representations: A. Contractor has examined and carefully studied the Contract Documents, and any data and reference items identified in the Contract Documents. B. Contractor has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. Contractor is familiar with and is satisfied as to all Laws and Regulations that may affect cost, progress, and performance of the Work. D. Contractor has considered the information known to Contractor itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Contract Documents; and the Site -related reports and drawings identified in the Contract Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor; and (3) Contractor's safety precautions and programs. E. Based on the information and observations referred to in the preceding paragraph, Contractor agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract. F. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. G. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor. EJCDC® C-520, (Rev.1), Agreement Between Owner and Contractor for Construction Contract (Stipulated Price). Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 3 of 6 H. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. I. Contractor's entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. ARTICLE 8 — CONTRACT DOCUMENTS 8.01 Contents A. The Contract Documents consist of the following: 1. This Agreement (pages 1 to 6, inclusive). 2. Performance bond (pages 1 to 4 inclusive). 3. Payment bond (pages 1 to 4_inclusive). 4. General Conditions (pages 1 -to 65, inclusive). 5. Supplementary Conditions (pages 1 to 10, inclusive). 6. Specifications as listed in the table of contents of the Project Manual. 7. Drawings (not attached but incorporated by reference) bearing the following general title: Sanitary Sewer Improvements. 8. Addenda (numbers 1 to 1, inclusive). 9. Exhibits to this Agreement (enumerated as follows): a. Contractor's Bid (pages 1 to 7, inclusive). 10. The following which may be delivered or issued on or after the Effective Date of the Contract and are not attached hereto: a. Notice to Proceed. b. Work Change Directives. c. Change Orders. d. Field Orders. B. The documents listed in Paragraph 9.01.A are attached to this Agreement (except as expressly noted otherwise above). C. There are no Contract Documents other than those listed above in this Article 9. D. The Contract Documents may only be amended, modified, or supplemented as provided in the General Conditions. ARTICLE 9 — MISCELLANEOUS 9.01 Terms A. Terms used in this Agreement will have the meanings stated in the General Conditions and the Supplementary Conditions. EJCDC® C-520, (Rev.1), Agreement Between Owner and Contractor for Construction Contract (Stipulated Price). Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 4 of 6 9.02 Assignment of Contract A. Unless expressly agreed to elsewhere in the Contract, no assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, money that may become due and money that is due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 9.03 Successors and Assigns A. Owner and Contractor each binds itself, its successors, assigns, and legal representatives to the other party hereto, its successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. 9.04 Severability A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon Owner and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. 9.05 Contractor's Certifications A. Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for or in executing the Contract. For the purposes of this Paragraph 10.05: 1. "corrupt practice" means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process or in the Contract execution; 2. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process or the execution of the Contract to the detriment of Owner, (b) to establish Bid or Contract prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition; 3. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish Bid prices at artificial, non-competitive levels; and 4. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 9.06 Other Provisions A. Owner stipulates that if the General Conditions that are made a part of this Contract are based on EJCDC® C-700, Standard General Conditions for the Construction Contract, published by the Engineers Joint Contract Documents Committee®, and if Owner is the party that has furnished said General Conditions, then Owner has plainly shown all modifications to the standard wording of such published document to the Contractor, EJCDC® C-520, (Rev.1), Agreement Between Owner and Contractor for Construction Contract (Stipulated Price). Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 5 of 6 through a process such as highlighting or "track changes" (redline/strikeout), or in the Supplementary Conditions. IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement. This Agreement will be effective on Zo> 1 g �ui�✓ (which is the Effective Date of the Contract). OWNER: CU1 81-11 By: Title: \G.0 Attest: t� Title: Address Address for giving notices: Z� 8 s 1(,*` -Z-4, CONTRACTOR: By: , Title: Pcps; r e,, )r (If Contractor is a corporation, a partnership, or a joint venture, att ch evidence of authority to sign.) Attest: Title:+o,/ Address forgiving notices: 2e6n1 LJ-- 11 Po &A S2r, License No.: Z I k\'7 (where applicable) (If Owner is a corporation, attach evidence of authority NOTE TO USER: Use in those states or other to sign. If Owner is a public body, attach evidence of jurisdictions where applicable or required. authority to sign and resolution or other documents authorizing execution of this Agreement.) E1CDC® C-520, (Rev.1), Agreement Between Owner and Contractor for Construction Contract (Stipulated Price). Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 6 of 6 ,Addendum No. 1 Revised 12.11.18 BID FORM Sanitary Sewer Improvements TABLE OF CONTENTS Page ARTICLE1— Bid Recipient.............................................................................................................................1 ARTICLE 2 — Bidder's Acknowledgements....................................................................................................1 ARTICLE 3 — Bidder's Representations..........................................................................................................1 ARTICLE 4 — Bidder's Certification................................................................................................................2 ARTICLES — Basis of Bid.................................................:..............................................................................3 ARTICLE6 — Time of Completion..................................................................................................................4 ARTICLE 7 — Attachments to this Bid............................................................................................................4 ARTICLE8 — Defined Terms...........................................................................................................................4 ARTICLE9 — Bid Submittal.............................................................................................................................5 E1CDC® C-410, Bid Form for Construction Contracts. Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1 Addendum No. 1 Revised 12.11.18 EJCDC° C-410, Bid Form for Construction Contracts. Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page ii Addendum No. 1 Revised 12.11.18 ARTICLE 1— BID RECIPIENT 1.01 This Bid is submitted to: City of Blair 218 South 16th Street Blair, NE 68008 1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents. ARTICLE 2 — BIDDER'S ACKNOWLEDOEIVIENTS 2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner. 2.02 BIDDER will sign and deliver the required number of counterparts of the AGREEMENT with the Bonds and other documents required by the Bidding Requirements within 15 days after the date of OWNER'S Notice of Award. ARTICLE 3 — BIDDER'S REPRESENTATIONS 3.01 In submitting this Bid, Bidder represents that: A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents, and hereby acknowledges receipt of the following Addenda: Addendum No. Addendum, Date NO.1 1.2/11/16 B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfied itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. Bidder is familiar with and has satisfied itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work. D. Bidder has considered the information known to Bidder itself, information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and any Site -related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder's safety precautions and programs. EJCDC® C-410, Bid Form for Construction Contracts. Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1 Addendum No. 1 Revised 12.11.18 E. Bidder agrees, based on the information and observations referred to in the preceding paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents. F. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents. G. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and confirms that the written resolution thereof by Engineer is acceptable to Bidder. H. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work. I. The submission of this Bid constitutes an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, and that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents. ARTICLE 4 — BIDDER'S CERTIFICATION 4.01 Bidder certifies that: A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation; B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.1): 1. "corrupt practice" means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process; 2. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition; 3. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and 4. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the e execution of the Contract. E1CDC® C-410, Bid Form for Construction Contracts. Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2 Addendum No. I Revised 12.11,18 ARTICLE 5 — BASIS OF BID 5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s): A. Base Bid: Bid Item No. Description EST CITY UNIT UNIT PRICE BID PRICE I Mobilization I LS $ 39,924.6-1 $ 39,924.64 2 Clearing and Grubbing I LS $ 6,169.91 $ 6,169. 91 3 Saw Cut - Full Depth 720 LF $ 6,58 $ 4,737.60 4 Remove Pavement 190 SY $ 11.73 $ 2,228.70 5 Remove Driveway 200 SY $ 10.38 $ 2,076.00 6 Remove Sidewalk 3,000 SF $ 085 $ 2,550,00 7 Abandon Manhole 3 EA $ 2_909.83 $ 7,529.113 8 Construct 8" Pipe Plug 6 EA $ 494.01 $ 2,964.06 9 Construct Flowable Fill - 50 -75 psi 30 CY $ 362.01 $ 10,860.30 10 Construct Aggregate Surface Course 10 TN $ 36.18 $ 361.80 11 Construct 54" ID Sanitary Sewer Manhole 95 VF $ 484.39 $ 46,017.05 12 Install External Frame Seal 10 EA $ 454.14- $ 4,541.40 13 Jack and Bore 18" Steel Casing, 0.25" Thickness 110 LF $ 461.66 $ 50,782.60 14 Horizontal Directional Drilling 8" Yellowmine, SDR 21 800 LF $ 131-44 $ 105,152.00 15 Construct 00" PVC Sanitary Sewer Pipe 1,450 LF $ 25.11 $ 36,409.50 16 Construct Aggregate Bedding for 8" Sanitary Sewer Pipe , 450 1. LF $ 8 99 $ 13,035.50 17 Construct 6" x 8" Wye 27 EA $ 111 73 $ 31016.71 18 construct sanitary Sewer Manhole Tap 3 EA $ 1,053.45 $ 3,160.35 19 Construct 6" Sanitary Service Riser 210 VF $ 38.64 $ 8,114,40 20 Reconnect Sanitary Service 27 LF $ 286.05 $ '7,723.35 21 Bore Sanitary Service 9 EA $ 3,524.40 $ 31,719.60 22 Perform CCTV Pipeline Inspection 2,250 LF $ 2.43 $ 5,467.50 23 Construct 7" Concrete Pavement (Type L65) 190 SY $ 82.31 $ 15,638.90 24 Construct 6" Concrete Driveway (Type 1-65) 200 SY $ 74.80 $ 14,960 , oo 25 Construct 4" PCC Sidewalk 3,000 SF $ 6.23 $ 18,690.00 26 Install Curb Inlet Protection I EA $ 592.26 $ 592.26 27 Install Sodding 3,000 SY $ 4.31 $ 12, 930 > 00 28 Traffic Control 1.0 LS $ 9,871.06 $ 9, 871.06 Total Bid $ 467,224.62 EJCDC® C-410, Bid Form for Construction Contracts. Copyright @ 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, All rights reserved. Page 3 Addendum No. 1 Revised 12.11.18 Bidder acknowledges that (1) each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor's overhead and profit for each separately identified item, and (2) estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all unit price Bid items will be based on actual quantities, determined as provided in the Contract Documents. ARTICLE 6 —TIME OF COMPLETION 6.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement. 6.02 Bidder accepts the provisions of the Agreement as to liquidated damages. ARTICLE 7 — ATTACHMENTS TO THIS BID 7.01 The following documents are submitted with and made a condition of this Bid; A. Required Bid security; Evidence of authority to do business in the state of the Project; or a written covenant to obtain such license within the time for acceptance of Bids; ARTICLE 8 — DEFINED TERMS 8.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions. EJCDC° C-410, Bid Form for Construction Contracts. Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 4 ,,Addendum No. 1 Revised 12.11.18 ARTICLE 9 - BID SUBMITTAL BIDDER: [Indicate correct name of bidding entity] VALLEY CORPORATION By: [Signature] [Printed name] MATT EEVINGTON (!f Bidder is a corporation, a limited liability company, a partnership, or a joint venture, attach evidence of authority to sign.) Attest: [Signature] , [Printed name] Title: Submittal Date: 1.2/18/18 Address for giving notices: 28001 TDA CIRCLE, P.O. BOX 599 VALLEY, NE 68064 Telephone Number: 402-359-2578 Fax Number: 402-359-5416 Contact Name and e-mail address: Bidder's License No.: 21817 MATT BEVINGTON MATT@VALLEYCORP.COM i (where applicable) E1CDCm C-410, Bid Form for Construction Contracts. Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 5 !`ll."f#• 4AGRA VAI I FA naCERTIFICATELIABILITY INSURANCE ATE (MM/DD/YYYY) DATE THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(les) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer any rights to the certificate holder in lieu of such endorsement(s). PRODUCER INSPRO Insurance P.O. Box 689 MEA Jeannie Samuels P D"E 402-941-1927 FAC No:402-721-2844 E E-MAIL jsainuels@insproins.com Fremont, NE 68026 INSURERS AFFORDING COVERAGE NAIC # 402 721.9707 INSURER A: Employers Mutual Insurance 21415 INSURED Valley Corporation P.O. Box 589 Valley, NE 68064-0589 INSURER B: INSURER C INSURER D: INSURER E INSURER F: $ COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. R TYPE OF INSURANCE DDL UBR POLICY NUMBER MM/DD/Y�YF PM/DD YYXP LIMITS A X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE X I OCCUR X X 41D27859 04/01/2018 04/01/2019 EACH OCCURRENCE $1 000 OOO RAM REE J RENTED $300,000 MED EXP (Any oneperson) $5,000 PERSONAL & ADV INJURY 11,000,000 GERL AGGREGATE LIMIT APPLIES PER: PECT LOC RO- POLICY J OTHER: GENERAL AGGREGATE s2,000.000 PRODUCTS - COMP/OP AGG 2,000,000 $ A AUTOMOBILE LIABILITY X ANY AUTO OWNED SCHEDULED AUTOS ONLY X AUTOS X AUTOS ONLY AUT S NON-OWNEO X X 4E27859 04/01/2018 04/01/2019 COMBINED SINGLE LIMIT $1,000,000 BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ PROPERTY DAMAGE $ (Per accident) A X UMBRELLA LIAB EXCESS LIAB X OCCUR CLAIMS -MADE X X 4J27859 4/01/2018 04/01/2019 EACHOCCURRENCE 9 000 000 AGGREGATE $9.000.000 ED I X I RETENTION 10000 A WORKERS COMPENSATION AND EMPLOYERS' LIABILITY OFFICERRIMEMBER EXCLUDED? ECUTIVE (Mandatory In NH) If yes, describe ""' DESC IPTION OF OPERATIONS b low N / A X 41-127859 4/01/2018 04/01/201 X 1UEROTH-1T11T1 E.L. EACH ACCIDENT11,000,000 E.L. DISEASE - EA EMPLOYEE $1,000,000 E.L. DISEASE -POLICY LIMIT '1,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additlonal Remarks Schedule, may be attached if more space is required) Porject: Sanitary Sewer Improvements. City of Blair is listed as an Additional Insured. !•eoTICIPATC unr noo CANCFI 1 ATInKI City Of Blair THE SHOULD EXANY ES ANCELLED P RATTIIONH DATE ABOVE THEREOF, DESCRIBED NOTICEI WIBLL CBE DELIVERED NE 218 So. 16th St. ACCORDANCE WITH THE POLICY PROVISIONS, Blair, NE 68008 AUTHORIZED REPRESENTATIVE a l ©1988.2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016/03) 1 of 1 The ACORD name and logo are registered marks of ACORD #S1 054946/M950546 ARP r Duplicate Original (4) CONTRACTOR (name and address): Valley Corporation 28001 Ida Circle, PO Box 589 Valley, NE 68064 OWNER: City of Blair 218 South 16th Street Blair, NE 68008 •_1.1*cii_► :• 1 CONSTRUCTION CONTRACT Effective Date of the Agreement: February 5, 2019 Amount: $467,224.62 Description: Sanitary Sewer Improvements Bond No.: 1066013 SURETY (name and address of principal place of business): The Hanover Insurance Company 440 Lincoln Street Worcester, MA 01653-0002 BOND Bond Number: 1066013 Date (not earlier than the Effective Date of the Agreement of the Construction Contract): February 5, 2019 Amount: $467,224.62 Modifications to this Bond Form:X❑ None ❑ See Paragraph 16 Surety and Contractor, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Performance Bond to be duly executed by an authorized officer, agent, or representative. CONTRACTOR AS PRINCIPAL SURETY Valley Corporation Contractor's Name and Corporate Seal By: Signature 1-3'Gty Print Name (seal) Title The Hanover Insurance Company (seal) Surety's Name and Corporate S al By: 0 � Signature (attach power of attorney) Ronald Kaihoi Print Name Attorney -In -Fact Title r Attest: ,, k-_ Signature Amy"Nordaune Title Account Specialist Notes: (2) Provide supplemental execution by any additional parties, such as joint venturers. (2) Any singular reference to Contractor, Surety, Owner, or other party shall be considered plural where applicable. EJCDC® C-610, Performance Bond Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. 1 of 4 1. The Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to the Owner for the performance of the Construction Contract, which is incorporated herein by reference. 2. If the Contractor performs the Construction Contract, the Surety and the Contractor shall have no obligation under this Bond, except when applicable to participate in a conference as provided in Paragraph 3. 3. If there is no Owner Default under the Construction Contract, the Surety's obligation under this Bond shall arise after: 3.1 The Owner first provides notice to the Contractor and the Surety that the Owner is considering declaring a Contractor Default. Such notice shall indicate whether the Owner is requesting a conference among the Owner, Contractor, and Surety to discuss the Contractor's performance. if the Owner does not request a conference, the Surety may, within five (5) business days after receipt of the Owner's notice, request such a conference. If the Surety timely requests a conference, the Owner shall attend. Unless the Owner agrees otherwise, any conference requested under this Paragraph 3.1 shall be held within ten (10) business days of the Surety's receipt of the Owner's notice. If the Owner, the Contractor, and the Surety agree, the Contractor shall be allowed a reasonable time to perform the Construction Contract, but such an agreement shall not waive the Owner's right, if any, subsequently to declare a Contractor Default; 3.2 The Owner declares a Contractor Default, terminates the Construction Contract and notifies the Surety; and 3.3 The Owner has agreed to pay the Balance of the Contract Price in accordance with the terms of the Construction Contract to the Surety or to a contractor selected to perform the Construction Contract. 4. Failure on the part of the Owner to comply with the notice requirement in Paragraph 3.1 shall not constitute a failure to comply with a condition precedent to the Surety's obligations, or release the Surety from its obligations, except to the extent the Surety demonstrates actual prejudice. 5. When the Owner has satisfied the conditions of Paragraph 3, the Surety shall promptly and at the Surety's expense take one of the following actions: 5.1 Arrange for the Contractor, with the consent of the Owner, to perform and complete the Construction Contract; 5.2 Undertake to perform and complete the Construction Contract itself, through its agents or independent contractors; 5.3 Obtain bids or negotiated proposals from qualified contractors acceptable to the Owner for a contract for performance and completion of the Construction Contract, arrange for a contract to be prepared for execution by the Owner and a contractor selected with the Owners concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds Issued on the Construction Contract, and pay to the Owner the amount of damages as described in Paragraph 7 in excess of the Balance of the Contract Price incurred by the Owner as a result of the Contractor Default; or 5.4 Waive its right to perform and complete, arrange for completion, or obtain a new contractor, and with reasonable promptness under the circumstances: 5.4.1 After investigation, determine the amount for which it may be liable to the Owner and, as soon as practicable after the amount is determined, make payment to the Owner; or 5.4.2 Deny liability in whole or in part and notify the Owner, citing the reasons for denial. 6. If the Surety does not proceed as provided in Paragraph 5 with reasonable promptness, the Surety shall be deemed to be in default on this Bond seven days after receipt of an additional written notice from the Owner to the Surety demanding that the Surety perform Its obligations under this Bond, and the Owner shall be entitled to enforce any remedy available to the Owner. If the Surety proceeds as provided in Paragraph 5.4, and the Owner refuses the payment or the Surety has denied liability, in whole or in part, without further notice the Owner shall be entitled to enforce any remedy available to the Owner. 7. if the Surety elects to act under Paragraph 5.1, 5.2, or 5.3, then the responsibilities of the Surety to the Owner shall not be greater than those of the Contractor under the Construction Contract, and the responsibilities of the Owner to the Surety shall not be greater than those of the Owner under the Construction Contract. Subject to the commitment by the Owner to pay the Balance of the Contract Price, the Surety is obligated, without duplication for: 7.1 the responsibilities of the Contractor for correction of defective work and completion of the Construction Contract; 7.2 additional legal, design professional, and delay costs resulting from the Contractor's Default, and resulting from the actions or failure to act of the Surety under Paragraph 5; and 7.3 liquidated damages, or if no liquidated damages are specified in the Construction Contract, actual damages caused by delayed performance or non-performance of the Contractor. 8. If the Surety elects to act under Paragraph 5.1, 5.3, or 5.4, the Surety's liability is limited to the amount of this Bond. 9. The Surety shall not be liable to the Owner or others for obligations of the Contractor that are unrelated to the Construction Contract, and the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than the Owner or its heirs, executors, administrators, successors, and assigns. EJCDC® C-610, Performance Bond Copyright ® 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. 2 of 4 10. The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders, and other obligations, 11. Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the location in which the work or part of the work is located and shall be instituted within two years after a declaration of Contractor Default or within two years after the Contractor ceased working or within two years after the Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this paragraph are void or prohibited by law, the minimum periods of limitations available to sureties as a defense in the jurisdiction of the suit shall be applicable. 12. Notice to the Surety, the Owner, or the Contractor shall be mailed or delivered to the address shown on the page on which their signature appears. 13. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. 14. Definitions 14.1 Balance of the Contract Price: The total amount payable by the Owner to the Contractor under the Construction Contract after all proper adjustments have been made including allowance for the Contractor for any amounts received or to be received by the Owner in settlement of insurance or other claims for damages to which the Contractor Is entitled, reduced by all valid and proper payments made to or on behalf of the Contractor under the Construction Contract, 14.2 Construction Contract: The agreement between the Owner and Contractor identified on the cover page, including all Contract Documents and changes made to the agreement and the Contract Documents. 14.3 Contractor Default: Failure of the Contractor, which has not been remedied or waived, to perform or otherwise to comply with a material term of the Construction Contract. 14.4 Owner Default: Failure of the Owner, which has not been remedied or waived, to pay the Contractor as required under the Construction Contract or to perform and complete or comply with the other material terms of the Construction Contract. 14.5 Contract Documents: All the documents that comprise the agreement between the Owner and Contractor. 15. If this Bond is issued for an agreement between a contractor and subcontractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. 16. Modifications to this Bond are as follows: E1CDC® C•610, Performance Bond Copyright ® 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. 3 of 4 CONTRACTOR (name and address): Valley Corporation 28001 Ida Circle, PO Box 589 Valley, NE 68064 OWNER: City of Blair 218 South 16th Street PAYMENT BOND Blair, NE 68008 CONSTRUCTION CONTRACT Effective Date of the Agreement: February 5, 2019 Amount: $467,224.62 Description: Sanitary Sewer Improvements SURETY (name and address of principal place of business): The Hanover Insurance Company 440 Lincoln Street Worcester, MA 01653-0002 BOND Bond Number: 1066013 Date (not earlier than the Effective Date of the Agreement of the Construction Contract): February 5, 2019 Amount: $467,224.62 Modifications to this Bond Form:X❑ None ❑ See Paragraph 18 Surety and Contractor, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Payment Bond to be duly executed by an authorized officer, agent, or representative. CONTRACTOR AS PRINCIPAL Valley Corporation (seal) Contractor's Name and Corporate Seal J By: Signature /14 ST T I,,-,�,, ,"S+-'-' Print Name c OL t,,'f SURETY The Hanover Insurance Company (seal) Surety's Name and Corporate Seal By: Signature (attach power of attorney) Ronald Kaihoi Print Name Attorney -In -Fact Title Title f Attest: Attest: k- 1 i < �--- SignJJ ture / Signature Amy Nordaune l S j ✓�C-- Account Specialist Title Title Notes: (1) provide supplemental execution by any additional parties, such as joint venturers. (2) Any singular reference to Contractor, Surety, Owner, or other party shall be considered plural where applicable. EJCDC® C-615, Payment Bond Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. 1 of 4 1. The Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to the Owner to pay for labor, materials, and equipment furnished for use in the performance of the Construction Contract, which is incorporated herein by reference, subject to the following terms. satisfy a Claimant's obligation to furnish a written notice of non-payment under Paragraph 5.1.1. 7. When a Claimant has satisfied the conditions of Paragraph 5.1 or 5.2, whichever is applicable, the Surety shall promptly and at the Surety's expense take the following actions: 2. if the Contractor promptly makes payment of all sums due to Claimants, and defends, indemnifies, and holds 7.1 Send an answer to the Claimant, with a copy to the harmless the Owner from claims, demands, liens, or suits Owner, within sixty (60) days after receipt of the by any person or entity seeking payment for labor, Claim, stating the amounts that are undisputed and materials, or equipment furnished for use in the the basis for challenging any amounts that are performance of the Construction Contract, then the Surety disputed; and and the Contractor shall have no obligation under this Bond. 7.2 Pay or arrange for payment of any undisputed 3. If there is no Owner Default under the Construction amounts. Contract, the Surety's obligation to the Owner under this 7.3 The Surety's failure to discharge its obligations Bond shall arise after the Owner has promptly notified the under Paragraph 7.1 or 7.2 shall not be deemed to Contractor and the Surety (at the address described in constitute a waiver of defenses the Surety or Paragraph 13) of claims, demands, liens, or suits against Contractor may have or acquire as to a Claim, the Owner or the Owner's property by any person or except as to undisputed amounts for which the entity seeking payment for labor, materials, or equipment Surety and Claimant have reached agreement. If, furnished for use in the performance of the Construction however, the Surety fails to discharge its Contract, and tendered defense of such claims, demands, obligations under Paragraph 7.1 or 7.2, the Surety liens, or suits to the Contractor and the Surety. shall indemnify the Claimant for the reasonable attorney's fees the Claimant incurs thereafter to 4. When the Owner has satisfied the conditions in Paragraph recover any sums found to be due and owing to 3, the Surety shall promptly and at the Surety's expense the Claimant, defend, indemnify, and hold harmless the Owner against a duly tendered claim, demand, lien, or suit. S. The Surety's total obligation shall not exceed the amount of this Bond, plus the amount of reasonable attorney's 5. The Surety's obligations to a Claimant under this Bond fees provided under Paragraph 7.3, and the amount of this shall arise after the following: Bond shall be credited for any payments made in good faith by the Surety, 5.1 Claimants who do not have a direct contract with the Contractor, 9. Amounts owed by the Owner to the Contractor under the Construction Contract shall be used for the performance 5.1.1 have furnished a written notice of non- of the Construction Contract and to satisfy claims, if any, payment to the Contractor, stating with under any construction performance bond. By the substantial accuracy the amount claimed Contractor furnishing and the Owner accepting this Bond, and the name of the party to whom the they agree that all funds earned by the Contractor in the materials were, or equipment was, performance of the Construction Contract are dedicated furnished or supplied or for whom the to satisfy obligations of the Contractor and Surety under labor was done or performed, within this Bond, subject to the Owner's priority to use the funds ninety (90) days after having last for the completion of the work. performed labor or last furnished materials or equipment included in the 10. The Surety shall not be liable to the Owner, Claimants, or Claim; and others for obligations of the Contractor that are unrelated to the Construction Contract. The Owner shall not be 5.1.2 have sent a Claim to the Surety (at the liable for the payment of any costs or expenses of any address described in Paragraph 13). Claimant under this Bond, and shall have under this Bond no obligation to make payments to or give notice on 5.2 Claimants who are employed by or have a direct behalf of Claimants, or otherwise have any obligations to contract with the Contractor have sent a Claim to Claimants under this Bond. the Surety (at the address described in Paragraph 13). 11. The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related 6. If a notice of non-payment required by Paragraph 5.1.1 is subcontracts, purchase orders, and other obligations. given by the Owner to the Contractor, that is sufficient to EJCDC® C-615, Payment Bond Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. 2 of 4 12. No suit or action shall be commenced by a Claimant under 8. The total amount due and unpaid to the this Bond other than in a court of competent jurisdiction in Claimant for labor, materials, or equipment the state in which the project that is the subject of the furnished as of the date of the Claim. Construction Contract is located or after the expiration of one year from the date (1) on which the Claimant sent a 16.2 Claimant: An individual or entity having a direct Claim to the Surety pursuant to Paragraph 5.1.2 or 5.2, or contract with the Contractor or with a (2) on which the last labor or service was performed by subcontractor of the Contractor to furnish labor, anyone or the last materials or equipment were furnished materials, or equipment for use in the performance by anyone under the Construction Contract, whichever of of the Construction Contract. The term Claimant (1) or (2) first occurs. If the provisions of this paragraph also includes any individual or entity that has are void or prohibited by law, the minimum period of rightfully asserted a claim under an applicable limitation available to sureties as a defense in the mechanic's lien or similar statute against the real jurisdiction of the suit shall be applicable. property upon which the Project is located. The intent of this Bond shall be to include without 13. Notice and Claims to the Surety, the Owner, or the limitation In the terms of "labor, materials, or Contractor shall be mailed or delivered to the address equipment" that part of the water, gas, power, shown on the page on which their signature appears. light, heat, oil, gasoline, telephone service, or Actual receipt of notice or Claims, however accomplished, rental equipment used in the Construction shall be sufficient compliance as of the date received. Contract, architectural and engineering services required for performance of the work of the 14. When this Bond has been furnished to comply with a Contractor and the Contractor's subcontractors, statutory or other legal requirement in the location where and all other Items for which a mechanic's lien may the construction was to be performed, any provision in be asserted in the jurisdiction where the labor, this Bond conflicting with said statutory or legal materials, or equipment were furnished. requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal 16.3 Construction Contract: The agreement between requirement shall be deemed incorporated herein. When the Owner and Contractor Identified on the cover so furnished, the intent is that this Bond shall be construed page, including all Contract Documents and all as a statutory bond and not as a common law bond. changes made to the agreement and the Contract Documents. 15. Upon requests by any person or entity appearing to be a potential beneficiary of this Bond, the Contractor and Owner shall promptly furnish a copy of this Bond or shall permit a copy to be made. 16. Definitions 16.1 Claim: A written statement by the Claimant including ata minimum: 1. The name of the Claimant; 2. The name of the person for whom the labor was done, or materials or equipment furnished; 3. A copy of the agreement or purchase order pursuant to which labor, materials, or equipment was furnished for use in the performance of the Construction Contract; 4. A brief description of the labor, materials, or equipment furnished; 5. The date on which the Claimant last performed labor or last furnished materials or equipment for use in the performance of the Construction Contract; 6. The total amount earned by the Claimant for labor, materials, or equipment furnished as of the date of the Claim; 7. The total amount of previous payments received by the Claimant; and 16.4 Owner Default: Failure of the Owner, which has not been remedied or waived, to pay the Contractor as required under the Construction Contract or to perform and complete or comply with the other material terms of the Construction Contract. 16.5 Contract Documents: All the documents that comprise the agreement between the Owner and Contractor. 17. If this Bond is issued for an agreement between a contractor and subcontractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. 18, Modifications to this Bond are as follows: E1CDC® C-615, Payment Bond Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. 3 of 4 ACKNOWLEDGMENT OF PRINCIPAL (Individual) State of County of } On this day of personally comes to me known and known to me to be the person who acknowledges to me that he/she executed the same in the year , before me described in and executed the foregoing instrument, and Notary Public ACKNOWLEDGMENT OF PRINCIPAI/(Partnership) State of County of } On this day of personally come(s) a member of the co -partnership of to me known and known to me to be the person N acknowledges to me that he/she executed the san in the year , before me a is described in and executed the foregoing instrument, and as the act and deed of the said co -partnership. Notary Public ACKNOWLEDGMENT OF PRINCIPAL (Corporation/LLC) State of County of 1A Gt On this day of f , in the year 2bj! , before me personally come(s) to me known, who being duly sworn, deposes and says that he/she resides in the City of that he/she is the W� " d" i— of the gY C4 the corporation described in and which executed the foregoing instrument, and that he/she signed his/her name thereto by like order. s Na�GUNERAL P,ihlic �\ NOTARYSMto KARISMA A. HEI I, ; My Comm. Exp. Axil 2 201J Bond Number 1066013 THE HANOVER INSURANCE COMPANY MASSACHUSETTS BAY INSURANCE COMPANY CITIZENS INSURANCE COMPANY OF AMERICA POWER OFATTORNEY THIS Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. KNOW ALL PERSONS BY THESE PRESENTS: That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY, both being corporations organized and existing under the laws of the State of New Hampshire, and CITIZENS INSURANCE COMPANY OF AMERICA, a corporation organized and existing under the laws of the State of Michigan, (hereinafter Individually and collectively the "Company") does hereby constitute and appoint, Jack Anderson, Ronald Kaihoi and/or Rita Jorgenson OfAcora Surety & Insurance of Montevideo, MN each individually, If there be more than one named, as Its true and lawful attorney(s)-in-fact to sign, execute, seal, acknowledge and deliver for, and on its behalf, and as its act and deed any place within the United States, any and all surety bonds, recognizances, undertakings, or other surety obligations. The execution of such surety bonds, recognizances, undertakings or surety obligations, in pursuance of these presents, shall be as binding upon the Company asifthey had been duly signed bythe president and attested bythe secretary of the Company, in their own proper persons. Provided however, that this power of attorney limitsthe acts ofthose named herein; and they have no authorityto bind the Company except in the manner stated and to the extent of any limitation stated below: Any such obligations in the United States, not to exceed Fifty Million and No/100 ($50,000,000) in any single instance That this power is made and executed pursuant to the authority of the following Resolutions passed by the Board of Directors of said Company, and said Resolutions remain in full force and effect: RESOLVED: That the President or any Vice President, in conjunction with any Vice President, be and they hereby are authorized and empowered to appoint Attorneys -In -fact of the Company, in its name and as It acts, to execute and acknowledge for and on Its behalf as surety, any and all bonds, recognizances, contracts ofIndemnity, waive rs of citation and all otherwritings obligatory In the nature thereof, with powerto attach thereto the seal of the Company. Any such writings so executed by such Attorneys -in -fact shall be binding upon the Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company in their own proper persons. RESOLVED: That any and all Powers of Attorney and Certified Copies of such Powers of Attorney and certification in respect thereto, granted and executed bythe President or Vice President in conjunction with any Vice President of the Company, shall be binding on the Companyto the same extent as if all signatures therein were manually affixed, even though one or more of any such signatures thereon may be facsimile. (Adopted October 7, 1981 —The Hanover Insurance Company; Adopted April 14, 1982 — Massachusetts Bay Insurance Company; Adopted September 7,2001 — CitizensInsurance Company of America) IN WITNESS WHEREOF, THE HANOVER INSURANCE COMPANY, MASSACHUSETTS BAY INSURANCE COMPANY and CITIZENS INSURANCE COMPANY OF AMERICA have caused these presentsto be sealed with their respective corporate seals, duly attested by two Vice Presidents, this 30th day of October, 2017. The Hanover Insurance Company Massachusetts Bay Ins4ance Company Citizens Insurance 7,aoyfAmerica John C. Roche, EVP and President THE COMMONWEALTH OF MASSACHUSETTS ) COUNTY OF WORCESTER ) ss. The Hanover Insurance Company M ..... hoxtta Oay In..r . Company riti an% Tncuranc�n( ramp.., of Amari— James H. Kav%iecld, Mice President On this30th day of October,2017 before me came the above named Vice Presidents of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, to me personallyknown to bethe Individuals and officers described herein,and acknowledged that the seals affixedto the preceding instrumentare the corporate seals of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, respectively, and that the said corporate seals and their signatures as officers were duly affixed and subscribed to said instrument by the authority and direction of said Corporations. WANT J, WAIUUMO Hochaftail #tai r`�' W awro"M bpi," bimru J.. J :x+. Ncrx:�• P!�bltc M} Cwunus,«ar G:ipires \inrct "-, 7tIL'' I, the undersigned Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, herebycertify that the above and foregoing isa full, true and correct copyofthe Original PowerofAttorney issued by said Companies, and do herebyfurther certify that the said Powers of Attorney are still In force and effect. GIVEN under mV hand and the seals of said Companies, at Worcester, Massachusetts, this 5th day of February, 2019. CERTIFIED COPY 1 TIt.�Jun G. A"hgincz, Vi c Pr ?jd�n. . ACKNOWLEDGEMENT OF SURETY STATE OF MINNESOTA COUNTY OF CHIPPEWA On this 24th day of January , 20 t 9 , before me, a Notary Public within and for said County, personally appeared Ronald Kaihoi to me personally known, who being by me duly sworn he/she did say that he/she is the attorney-in-fact of The Hanover Insurance Company, the corporation named in the foregoing instrument, and the seal affixed to said instrument is the corporation seal of said corporation, and sealed on behalf of said corporation by authority of its Board of Directors and said Ronald Kaihoi acknowledged said instrument to be the free act and deed of said corporation. NOTARYPUBLIC My Commission Expires LEANNE C. DUIS 1 Notary Public -Minnesota �`rsa My Commission Expires Jan 31, 0023