2017-01RESOLUTION NO. 2017-1 PRELIMINARY ENGINEERING SERVICES AGREEMENT SUPPLEMENTAL AGREEMENT NUMBER 1— BK1523 COUNCIL MEMBER STEWART INTRODUCED THE FOLLOWING RESOLUTION: Whereas: City of Blair and Felsburg Holt & Ullevig, have previously executed a Preliminary Design Engineering Services Agreement (BK 1523) for the Blair South Bypass Project for which the Local Public Agency (LPA) would like to obtain Federal Funds; Whereas: City of Blair understands that it must continue to strictly follow all Federal, State and local laws, rules, regulations, policies and guidelines applicable to the funding of this Federal -aid project; and Whereas: City of Blair and Felsburg Holt & Ullevig, wish to enter into a Preliminary engineering services supplemental agreement setting out modifications and/or additional duties and/or services funding responsibilities for the Federal -aid project. Be It Resolved: by the City Council of the City of Blair, Nebraska that: James Realph, Mayor of the City of Blair, Nebraska is hereby authorized to sign the attached Preliminary Design Engineering Services Supplemental Agreement Number 1 between the City of Blair and Felsburg Holt & Ullevig. City of Blair is committed to providing local funds for the project as required by the Project Program Agreement and any Supplemental Project Program Agreements. NDOR Project Number: STP -DPS -3854 NDOR Control Number: 22508 Project Location: Blair South Bypass COUNCIL MEMBER WOLFF MOVED THAT THE RESOLUTION BE ADOPTED AS READ, WHICH SAID MOTION WAS SECONDED BY COUNCIL MEMBER HALL. UPON ROLL CALL, COUNCIL MEMBERS VOTING "AYE" SHEPARD, STEWART, HALL, WILLIS, HANSEN, ANDERSEN, WOLFF AND JENSEN AND COUNCIL MEMBERS NONE VOTING "NAY", THE MAYOR DECLARED THE FOREGOING RESOLUTION PASSED AND ADOPTED THIS 10TH DAY OF JANUARY 2017. CITY OF BLAIR, NEBRASKA BY I��_ 1_1 4U\ JAMES REALP , MAYOR ATTEST: BRENDA R. WHEELER, CITY CLERK (SEAL) STATE OF NEBRASKA ) ):ss: WASHINGTON COUNTY ) BRENDA R. WHEELER, hereby certifies that she is the duly appointed, qualified, and acting City Clerk of the City of Blair, Nebraska, and that the above and foregoing Resolution was passed and adopted at a regular meeting of the Mayor and City Council of said City held on the 10th day of January, 2017. 'n&"' 61 Jl-tL� BRENDA R. WHEELER, CITY CLERK 'SUPPLEMENTAL AGREEMENT # 1 CITY OF BLAIR FELSBURG HOLT & ULLEVIG PROJECT NO. STP -DPS -3854(1) CONTROL NO. 22508 BLAIR SOUTH BYPASS THIS SUPPLEMENTAL AGREEMENT is between the City of Blair ("LPA") and Felsburg Holt & Ullevig ("Consultant"), collectively referred to as the "Parties". WHEREAS, Consultant and LPA entered into an agreement ("Original Agreement") BK1523 for Consultant to provide Preliminary Design and NEPA for LPA's Federal Aid project, and WHEREAS, it is necessary that additional engineering and environmental services be added under this Supplemental Agreement, and WHEREAS, it is necessary to increase Consultant's compensation by this Supplemental Agreement for the additional work necessary to complete the project. WHEREAS, it is the desire of LPA that the project be constructed under the designation of Project No. STP -DPS -3854(1), as evidenced by the Resolution of LPA, attached as EXHIBIT "A" and incorporated herein by this reference, and NOW THEREFORE, in consideration of these facts and mutual promises, the Parties agree as follows: SECTION 1. SCOPE OF SERVICES Consultant will perform the additional work as set out in in Exhibit "B" Consultant Work Order 1, attached and incorporated herein by this reference. SECTION 2. NOTICE TO PROCEED AND COMPLETION SCHEDULE The LPA issued Consultant a written Notice -to -Proceed on December 12, 2016. Any work or services performed by Consultant on the project prior to the date specified in the written Notice -to -Proceed is not eligible for reimbursement. Consultant will complete all work stipulated in the Original Agreement and this Supplemental Agreement by June 30, 2018. SECTION 3. FEES AND PAYMENTS For the work required, SECTION 9 FEES AND PAYMENTS of the Original Agreement is hereby amended in accordance with Exhibit "B" so that the fixed -fee -for-profit is increased from $46,378.72 to $52,399.02, an increase of $6,020.30. Actual costs are increased from $420,121.28 to $467,300.98, an increase of $47,179.70. The total agreement amount is increased from $466,500.00 to $519,700.00, an increase of $53,200.00 which Consultant must not exceed without the prior written approval of LPA. Project No. STP -DPS -3854(1) Control No. 22508 Blair South Bypass Page 1 of 3 Template T -AGR -1 S Revised 8-4-14 AGREEMENT # BK1523 Sup # 1 SECTION 4. ENTIRE AGREEMENT The Original Agreement, any and all other previous supplements thereto, and this Supplemental Agreement, constitute the entire agreement ("The Agreement') between the Parties. The Agreement supersedes any and all other previous communications, representations, or other understandings, either oral or written; all terms and conditions of the Original Agreement and all previous supplements thereto, to the extent not superseded, remain in full force and effect, and are incorporated herein as if set forth in their entirety. SECTION 5. CONSULTANT CERTIFICATION AND REAFFIRMATION The undersigned duly authorized representative of Consultant, by signing this Supplemental Agreement, hereby reaffirms, under penalty of law, the truth of the certifications set out in the Original Agreement and all Supplements thereto, including this Supplement. Further, Consultant has a duty to inform LPA of any material changes in the accuracy of all assertions set out in the Original Agreement and all Supplements thereto. SECTION 6. CERTIFICATION OF LPA By signing this Supplemental Agreement, I do hereby certify that, to the best of my knowledge, Consultant or its representative has not been required, directly or indirectly as an express or implied condition in connection with obtaining or carrying out this agreement to: (a) employ or retain, or agree to employ or retain, any firm or person, or (b) pay or agree to pay to any firm, person, or organization, any fee, contribution, donation, or consideration of any kind. 1 acknowledge that this certification is to be furnished to the FHWA, upon their request, in connection with this agreement involving participation of Federal -Aid highway funds and is subject to applicable LPA and federal laws, both criminal and civil. Project No. STP -DPS -3854(1) Control No. 22508 Blair South Bypass Template T -AGR -1 S Revised 8-4-14 Page 2 of 3 AGREEMENT # BK1523 Sup # 1 IN WITNESS WHEREOF, the Parties hereby execute this Supplemental Agreement pursuant to lawful authority as of the date signed by each party. Further, the Parties, by signing this Supplemental Agreement, attest and affirm the truth of each and every certification and representation set out herein. EXECUTED by Consultant this day of Tet 4.1 411 y 2W FELSBURG HOLT & ULLEVIG Matt McFadden Principal STATE OF NEBRASKA ) )ss. DOUGLAS COUNTY) `� J� SUBSCRIBED AND SWORN to before me this -2 day of y, 20 l+ '- F.CGERMWHOiAAY-State of Nebraska MARY K. STRUBComMymEp,MY 019 Noaryubli EXECUTED by LPA this / 4 day of -So, ou an, 20 CITY OF BLAIR Jim Realph M or Subscribed and sworn to before me this / O day of _ JC, n u k f C1 .20/7 Project No. STP -DPS -3854(1) Control No. 22508 Blair South Bypass Template T -AGR -1S Revised 8-4-14 - JAIL L Clerk STATE OF NEBRASKA DEPARTMENT OF ROADS Form of Agreement Approved for Federal Funding Eligibility: �ls Date —� Page 3 of 3 AGREEMENT # BK1523 Sup # 1 Consultant Work Order (Local Prolecfs) Project No,: _ Control No.: __--- -- STP -DPS -3864(l) 22508 Consultant: (Name and Representative) Agreement No.: Work Order No.: Felsburg Holt & Ullevi ��t d�� 1 Constr, Change Order No.: (1/applicable) LPA: (Name and Representative) Al Schoemaker, City of Blair, Ne _ email by: All parties agree the following described work needs to be performed by the consultant as part of the referenced project. All parties concur and hereby give notice to proceed based on the following:, justification to modify contract, scope of services, deliverables, schedule, and estimated total fee. All other terms of existing agreements between the parties are still in effect. It is understood by all parties that the work described herein will become part of a future supplement to the agreement Indicated above, Juslilieallnn to modify agreement: (Include scope of services, dolivarables, and schedulo) This Supplemental Scope of Services includes additional work required that was not previously scoped, FHWA identified several tasks that they would like included or expanded upon in the Scope of Services. The original scope identified some data and information from previous studies that could be used for this project. However, upon review, the Consultant has found that several previously prepared studies were either out of date or no d reauire additional0 um ale aodlor validated. Work Title Summary of Fee A, Total Direct Labor Cost - 17,491.36 B. Overhead (Factor * x A) - 29,359.25 Additional Work for NEPA C. A + B - 46,850.61 D. Profit/Fee (Factor ** x C) = 6,020.30 *Overhead Factor: 167.85% E. Direct Non -Labor Cost = 329.09 "ProfiUFee Factor: 12.85% F. Subconsuitant Services = 0.00 Total Fee Notes: TOTAL FEE: C + D + E + F = $53,200,00 ® ESTIMATED TOTAL FEE: ❑ FINAL TOTAL FEE: Work Order Authorization — May be granted by email and attached to this document. Consultant: _ _M�tthew_NLeFa�c den {, r� i% _ _1_2/12/2016 Notice to Proceed Name signature Data will be granted by LPA: email by: — — ...�-%L(, Zare LPS PC for Preliminary Name Signature Engineering & LPS PC (forPreliminary En ineerin ( ty g g a State Re . (fo structlan Engineering): CD PC for G o7/g2— Cl Construction Engineering. Name ure Dale LPS Unit Head Review (for PE P a ^Dale � Name signature LPS Engineer or Construction Engineer (Construction Phase): Name Si nature FHWA: (FHWA Approval on F Oversight Projects Only) Plotice to Pro -ond Uatc: Name nit mnurr. Duty. Distribution: t:onsuilanl. I -PA - RC, Stale Rep-, FHkVA, LPS 11C, NL'OH Agwamv:nts Engineer, I11ghway Funds Paanager, CD PC DR Form 250, Polarch 2014 EXHIBIT "B" Page 1 of 10 SUPPLEMENTAL SCOPE OF SERVICES PROJECT NO. STP -DPS -3854(1), CONTROL NO. 22508 PRELIMINARY DESIGN AND NEPA COMPLIANCE BLAIR SOUTH BYPASS BLAIR, NEBRASKA SUPPLEMENT NO. 1 INTRODUCTION This Supplemental Scope of Services consists of providing additional engineering and environmental services related to the completion of the preliminary design and compliance with the National Environmental Policy Act (NEPA) for the Blair South Bypass project. This Supplemental Scope of Services includes additional work required that was not previously scoped. At the scoping meeting with FHWA and NDOR, several tasks were identified that would need to be included or expanded upon in the Scope of Services. The original scope identified some data and information from previous studies that could be used for this project. However, upon review, the Consultant has found that several previously prepared studies were either out of date or no longer valid and require additional work to update and/or validated. A more detailed description of anticipated tasks is provided in the following sections. The task numbers identified are consistent with the tasks identified in the original agreement for more convenient reference. DESCRIPTION OF TASKS 1. Project Management and Coordination This task includes activities to initiate and monitor project schedules, workload assignments and internal cost controls throughout this phase of the project. Because the project schedule is extended 19 months beyond the original completion date submitted in the original contract, included are efforts to prepare and process 19 additional invoices and prepare 19 additional monthly progress reports required by NDOR to accompany all invoices; prepare project correspondence for an additional period of 19 months with the City of Blair; and maintain project records. 3. Meetings 3.2 Progress Meetings The number of meetings will be increased from 6 meetings identified in the Original Scope to 19 meetings to allow the Consultant to attend monthly meetings with the City of Blair, NDOR and FHWA. These meetings will be held in Omaha and will be during the normal MAPA Projects monthly meetings. This includes preparation of agendas, meeting materials and meeting minutes distributed to attendees. 6. Public Involvement Section 6.6 was stricken out of the original Scope of Services. This has been requested to be added back in. 6.6 Investigation and Respond to Public Comments Investigation and responses to the assembled public comments received at the public meetings will be completed by the Consultant and provided to the City for distribution. Thirty (30) comments requiring written responses are anticipated for each public meeting, of which five (5) will require significant response effort. Responses will be submitted to NDOR Environmental and Communications for review and revisions made, if necessary, prior to distribution. If additional responses are needed, they will be addressed with a supplemental agreement. 8. Preliminary Design/Alternatives Refinement and Evaluation Additional analysis and documentation was requested to support the Alternatives Analysis. The Original Scope of Services was based on an existing, generally Felsburg Holt & Ullevig Project No. STP -DPS -3854(1), CN 22508 Blair South Bypass EXHIBIT "B" Page 2 of 10 approved, Purpose and Need (P&N). When that P&N could not be found, tasks that were omitted from the initial Scope to Develop the P&N, need to be added back in, including new mapping and figures, submittal of drafts, revisions, resubmittals, meetings and consultations. NDOR provided old FHWA comments on the P&N section of the previous DEIS to the Consultant in March 2016, which previously could not be located. In addition, the previous Alternatives Analysis was evaluated and determined by NDOR and the Consultant to be out of date and any information used from it would need to be reviewed and either updated or validated. New traffic analysis along Washington Street would be required to verify the results. For the Alternatives Refinement described in the original scope Tasks 8.1 through 8.4, the Consultant was to evaluate 3 alternative concepts for horizontal alignment, typical section, and initial screening. Once these concepts were screened and a "preferred alternative" was selected, 17 additional tasks (8.5 through 8.21) were to be completed. Included in these were Task 8.19 traffic data collection and task 8.20 traffic analysis. Historic daily traffic volume data and growth rates as reported in the Traffic Data Update dated March 2014 prepared by previous consultant preparing the DEIS, daily and peak hour traffic counts as provided by NDOR and the City of Blair were to be used. Upon investigation, the Consultant determined that growth projections from the previous study outpaced historic growth in Blair. Also a new City of Blair Comprehensive Plan (as adopted October 13, 2015) will be utilized to develop future traffic volumes on the study area roadways. In order to accomplish the review of alternatives required by the NEPA process, the traffic data needs to be evaluated using the appropriate growth projections, the tasks identified below are in addition to the original scope. 8.19 Traffic Volume Data Collection The initial Scope of Services included compiling traffic data at three intersections, US -75 & proposed bypass, US -30 & proposed bypass, and the proposed bypass with County Road P35. FHU will need to request and compile additional traffic data (including crash data) at additional intersections to prepare traffic analysis for the Environmental Documentation. The additional intersections are as follows: • US Highway 30 with Washington Street • 161h Street with Washington Street • US 75 Highway with Washington Street • US Highway 30 with Nebraska Highway 133 No new traffic counts are needed as part of this supplement. The Consultant will utilize historic traffic volume data and growth rates as reported in the Traffic Data Update dated March 2014 prepared by Benesch (consultant the prepared the DEIS), daily and peak hour traffic counts as provided by NDOR and the City of Blair, and growth projections from the City of Blair Comprehensive Plan (as adopted October 13, 2015) to develop new growth rates to determine future traffic volumes on the study area roadways. The Benesch report focused specifically on truck traffic diversion for daily traffic volumes. Daily total traffic diversion and peak hour level of service at intersections was not analyzed by Benesch. The report discussed the capacity analysis by roadway segment, but did not provide enough detail regarding the capacity analysis of key intersections. A spreadsheet model will be used to develop future traffic volumes using methodologies outlined in NCHRP 255. 8.20 Traffic Analysis The Consultant will complete the traffic analysis for the additional intersections discussed in the P&N that were not included in the original Scope. The Consultant will prepare and conduct the following additional items necessary to complete the Environmental Documentation. Traffic Volume Development Felsburg Holt & Ullevig Project No. STP -DPS -3854(1), CN 22508 Blair South Bypass EXHIBIT "B" Page 3 of 10 Upon completion of traffic volume development, a meeting will be held with NDOR Traffic and the City of Blair. The minutes of the traffic volume development meeting and any traffic projection iterations will be documented and included in the traffic study. FHU will not proceed with Level of Service analysis until NDOR and City of Blair agree upon the 2016 and 2040 traffic volumes, the measures of effectiveness and performance criteria for traffic analysis (Stop Milestone). Develop base year 2016 and design year 2040 traffic volumes for bypass alignments on roadway segments, up to three (3) total alternatives. Develop base year 2016 and design year 2040 peak hour traffic volumes for the following additional intersections: o US Highway 30 with Washington Street 0 16th Street with Washington Street o US 75 Highway with Washington Street o US Highway 30 with Nebraska Highway 133 Peak hour LOS analysis will be conducted at 7 intersections, including 4 additional intersections (compared to the original scope). An emphasis on truck traffic will be included in this updated analysis, particularly its impacts on capacity through downtown Blair on Washington Street. As stated above in Section 8.19, previous traffic studies only evaluated roadway segment LOS analyses and did not evaluate any peak hour operations at intersections. The LOS analysis will be conducted for both base year 2016 and design year 2040 conditions. • Detailed segment Level of Service analysis along Washington Street • Detailed intersection Level of Service analysis at the following locations: o US Highway 30 with Washington Street 0 16th Street with Washington Street o US 75 Highway with Washington Street o US Highway 30 with Nebraska Highway 133 8.21 Crash Analysis The Crash Analysis is revised to include the intersection added above in Task 8.19 and 8.20. 9. Environmental Assessment / NEPA Compliance When preparing the Original Scope of Services, the Consultant was instructed to use as much as possible of the original Blair Bypass Draft EIS for this project. Therefore, the hours identified in the Original Scope of Services included performing minor edits to an existing P&N, assumed to have been written specifically for the South Close segment, and addressing comments. The Consultant requested a copy of this generally approved P&N at the kick off meeting, 11 August 2015. That P&N and Alternatives Analysis however, was not reasonably ascertainable after multiple searches. Therefore tasks that were omitted from the initial Scope to Develop the P&N, needed to be completed; including new mapping and figures. During this process of writing a P&N specific to the south segment the Consultant reviewed existing documentation from the Draft EIS for use and additional needs for evaluation were identified, particularly with the traffic data analyses that is needed to support the P&N. Certain previous studies completed for the Draft EIS were determined to be either out of date or no longer valid. Therefore, additional submittal of drafts, revisions, resubmittals, meetings and consultations became necessary. 9.3 Purpose and Need This Supplement includes hours for the Consultant to recreate a P&N based on all available materials, including previous versions of the P&N from the DEIS, minutes from past meetings, email chains, agency review comments, and other materials from the DEIS (following determination of accuracy or updating). The first draft P&N was submitted on 29 January 2016. Hours are also included to revise the document per two rounds of agency comments. Comments received on 29 February 2016 were incorporated into the document, and the second draft Felsburg Holt & Ullevig Project No. STP -DPS -3854(1), CN 22508 Blair South Bypass EXHIBIT "B" Page 4 of 10 of the P&N was resubmitted on 22 March. Additional comments received on 31 March were incorporated, and the revised P&N was resubmitted on 6 May 2016. 9.4 Discussion of Alternatives Considered As mentioned in Task 8 above, additional analysis and documentation was requested to support the Alternatives Analysis. Again, when preparing the Original Scope of Services, the Consultant was led to believe that the information from the original DEIS could be used with minor edits. However, following review, certain portions of the previous Alternatives Analysis were determined to be out of date and would need to be reevaluated. While Task 8 above, addresses the traffic modeling and engineering studies, findings from these technical evaluations need to be incorporated into the NEPA document in concise and reader friendly language, that tells a convincing story, and builds a case for selection of the preferred alternative. This section will require additional work to include a discussion of the development of alternatives as well as additional screening of the alternatives to determine how well they meet project purpose and need. The additional traffic analysis identified in Task 8.20 & 8.21 will be used to prepare these sections of the NEPA document. 9.23 Decision Memo The Original Scope of Service identified the Consultant preparing the Decision Memo. This will be done by FHWA. This task will negate the hours identified in the Original Agreement. Felsburg Holt & Ullevig Project No. STP -DPS -3854(1), CN 22508 Blair South Bypass EXHIBIT "B" Page 5 of 10 Naa e 1111 - 1111 In,=icc-el Zlfa's %forTG+t' !don't,' �i�-atT?Ar_in� 1111-- C ff3p5. Tc,? gTt is ti.: Ti:� 6�1 ReAa, En,�-� — let Ctedtcrz and Irpolert Lues 95L' tfOjE:. 4i'7s•� 7 &IIL5 Fri •+rta� *, —f Taft ArD�-� end Mo*Lr..g _ a6C' a3pE %Ion ?,c' 5. Fn •-. -.. 1111- 1111 C,esrtp teh2d_>Ca:�n;Le:: :-1 vc J , 10' IQ vItuj I Vlt 2'D Lays- Frit, -&M Ti1L_.:.;n6 tegr,Pr"reft dmf9 Purpc2 sd Need Car veh, ^;. Cays. F.n p29,16 f11t,'t 2,39,'Sa ,�,?te4S, ml Tenn 22 trays Fn 1!29!16 f�cz't22E','B6 Frrt_e toil MYS Fri tolii5 Frlc;*tab �evetp EvIduevr„Cn d" 4 mcna Fri 11,1: TCtl aer: Fercerd fer sd Cna4=;;Fri 1EC3pE^.3pE������;;Tfi�UaS,�117LVE-d 354L� T� 1 1.+'16 Thu t.,27t',,6 f-f:P`en-nr aerd:,L{ psiFIT 9mfflt"�� ND OR FreY_x C-nrnMen t aria Fevl a FSS. h4aterzL 1,29 6 Fri 1}1116 n ;etcrrfrd ty 1+ia+'sn:; C'.E C ys Fri 4i 1=13 Frl AM' t6 F9dd'1I%U4 !Eel Rceewaf7 ARvxune� 9G ways Tnu 4111915. Eda,2i'"l ie. e. Trefrs re're",:Y^^ 1,t.,.^ir_.tar, ecJ yea; 6C Maps 711U"2'15.1a «,Je,%:'&,u J:ae4:, reiem: erd cry-3irefi r ws�- NDOF E, dl rtis:, a •e,x : Eitr rd, EC 3y€ T 1U ?;2515! 15 'Pde6 3'Ett; "ci�xsosr�r=it � E:, '_� U':r erd P,i3tf _i'$,.1. Fe,r-lerl. F.raeelicrte! P.rwrr�:; D Capt T,1U 2 9A7 T,11 L, 2 C:1he�esF.r_tuar, Snide, ltTdtlaTBE',ryfr.r_-r2acuw er_ds,' 1e rd„ lCx E CayE Fr 3731,'1- Fri a,: _ne'•Cars•<*ucd:Ft�x:Tisn:.r rq:*eL'yrdy.•sda---h" 47queM+.� lmwffW:.7 er caps Tqu tz1t 5�16 'a'J2o ^emal, Huf Utfvre, vruel4e Tres-_. r:lsn Sic!,i:.:r.�uM:e erd I'mm-t E'fes� C C3y6 f r; 6,23, 17, Fri 6±; sant-errIII trpu_ end+.As"'_etcr{'€ems;' • ,. r1 7 • 1EC3pE^.3pE������;;Tfi�UaS,�117LVE-d 354L� T� Psrp!P--ferPtefc'a'eefa?g iiHV,+i.W 15 C;3yE Thu 12°!5161'/Ell1t111i ND OR FreY_x C-nrnMen t aria Fevl a FSS. h4aterzL 1 WC2 TnU 1!11..!17 Wea 1116737 tiIIOR F #,d,, Gar m,I,nt.:ntl Fevsre. F 9 L4atena -. as Thio 1 i 14 'ti -.V. Etl 1ifd"7 PsN t,a dI5,-d Pm 1 639 ThU 1,16",,7 Thu 1!26,117 'u_ic'rf rtm6cr Meesrs 1 tiny Tnu 1,9, 17 Tftii• ?otic Gcrcrr_rt Fer'cd Erdt' r, aa�: ThU t i1E,'L1111 `Neo { +�.et5tnterc F:.t,lx Wmmerta <_wt: Tv 3,a,f7 Weal 110 I r Final Desisi5n Scn,d L , 3y ftlon 6't Et13 f.1Gr16;1 r'sei3P:�e��rJAetdQaxrrenitnetirrla?",u�3Lx4'xdiatsr - 3s'FkE Fr1R211E_15 7!hL i;;6rfli +1H;n kr:�::s :re,�er jl tE Ci3ys Ffl 82"16' 16 7'14 ritf,'17 j Ea•etnr:e'da;c ,.e�zrxa 7':CayE FrI'2,'16,16 Thu!W3 7 f FubicerdAg—; lrru.+._,:-rniCc rrn!-ccr 7`. C3p5 Fri!iM6i16 TM&BU17 a.,, srfie ds era r DC Qrrflc 6D w3ps Fri 1!6 17 TtU a'oC ?7 !�_CFnc:�a,Gnr a F,e1J'tv,andF vzeDnfl 3L,C3y£ Ft's. 3,'31,9? Thu &I f,,-7 FH is 4r;L-.t', Clrmers,rRt-.cg.-'vr, arjF,ev a 0mfi UG cayt Fir =,I2s 17 Thu 6'2`1'.7 { 1aDCF 5jiew, C.arrmrrt Fe wjit: m end Fess::.. sd cmi 3D, Cays Fn ,1s" 17 I'MM,`nezz",v'rr+erCFewj;Ecm,andFri_e�-dGreg Kways Fri 17 Thi9.�1A,';-7 --geed=nefiEA 2CapE- Fr,9iIaA7 ?ACnS,1Etr' 4 YAE 74_ 9!196, .tor, `Cl'1E, i7 'COF n .;L-5; G zearE zft rFr.,ze PH Mriv I: ID z3ys 7ue VGMT�1740o bQ,K u7 f FHi44:`es te',C r,,�rtard,�,es�F•rifA•:ersu i;.Lays,Al±;nt1SV17dor'-iii:1'7 "Y Fur, 1 day: Tde I, I4J17Tue t 1114.'17 Futi:L and Nttu E.:. 1 a3y', icon ti 1122,17don '• 1!21!'•7 Pubs Henrc 1 f13y.7Ue D2ti2. 1-su:- tl2,12+t- PuelsCamrrad Pz#• at' ws3Ys:. Wn t, VV., 17 Fri Retpx I-PLbIsenddgrr.OEN Ce- ;e if Cwys Von i,2'ta Fri b2f,118 Rev aKn5to..,•.wDtz-gn:LcLCan--rb tuC3pE 31on1.'E,a Fri11_'161 ;-sem FEA:Eaale erd 16 04yE Toe 1!9! 16 Vcn 1!211'7811 fCTPRvatw;Carrs+srxFtzd:,-n, arel Fe,,!-- DA Swi£ TLeIi2a";?,vc±i2,_f;3g FH',q'A Freest C rrsFro, er,dFrvie Qmfi 4 tqt',£ 74_ 2f't8 %Z'OFRdAeu%,GrineM-Rtz m,,r,.ardFais:eZnJCsd 4 M TLe3i27t1!aMtnid.,_�:,'�iE FH;Y4114-;,e-GaR ri:Fezi:tcnerdFetce2,,dDA 3WAS TLE1172l,'1afVI51111t3a 'ddren Ft'ti,'w C3s*nxe ars Fce�.e Crsi 1 ;N% TL: '1 a VC j 6,"-,•,'-:& i iaei Frt car of fE4B-,Land Fr'Wb amt'f_ Der'!" M.fr-=c 3 er%s T4_�^. i3 6. L11 ai 11'ti 7 Frrl C-a6acn soet - f C3ys 74 c'1.. 1a f`C+16j 1E15a Ttfi09MPfft Sl"* Begin Prefenin2rf DeWn G way's Tue 2;1&16 TI* V, P`- .9c invdwevnrs Ptah D Days Fri 4-t 1-3 Fri 9 Pt-roseand Need Ort"aw A septed C d3 s Tnu i! ,1? T -m; I. F,;bli lnfams-tcr,1let*g D Capt T,1U 2 9A7 T,11 L, 2 Draft Ek I& MOOR Rev E CayE Fr 3731,'1- Fri a,: Draft ES I., FHKA Rte iew O Ma S FT E,12� 1- Fn 5" 2nd Draft EA far NDOR R.cv�ew C C3y6 f r; 6,23, 17, Fri 6±; 2nd 6,.P EA frrrFMWA peview 0 eCay2 Fri 64.17 Fri E wedCIA EA Dat3ps b10n371✓r.�i-�c-i9.�1 P-�trcHe:,rarc D C3yE Tae g2;IZ17Tu: DrabftAEmmfarNDORIt"icr Dw3pE Mor, Dn& FEA,Emb for FHW'A Re xw O EC3pE Mor, 3,16 1a b`C 1 s,t 2nd DraE FF.A,Em a fa NWR Reaiew D t>;3ps Mot 11,11118 Vv i +,r i 2nd Draft FEA Emata for Fi;°pdA R&v5ew 0 ew3ps b10r 5114t13 V vi SA Final FEA)Erab brRevieu D ways MOr 5a I - Ip, W,,.*15,2 I r Final Desisi5n Scn,d L , 3y ftlon 6't Et13 f.1Gr16;1 EXHIBIT "B" Page 6 of 10 PRELIMINARY DESIGN AND NEPA COMPLIANCE Staffing Plan Project Name: Blair Bypass Project Number. STP -DPS -3854(1) Control Number. 22508 Location (City, County): City of Blair, Washington County Firm Name: Felsburg Holt & Ullevig Consultant Project Manager: Matt McFadden Phone/Email: 402-445-44051 mfhueng.com LPA Responsible Charge: AI Schoemaker Phone/Email: (402)426-4191/ ars@ci.blair.ne.us NDOR Project Coordinator. Glen Steffensmeier Phone/Email: 402-479-3845 / glon,steffensmeler@nebraSka.gov Date: October 25, 2016 Labor Costs: STAFFING PLAN Code Classification Tide Hours Blended Rate Amount PR Princi a1 PM Pro ed Manager 4 .. _ 580.77 ,.... -' $323.08 SENV Senior Environmental Scientist 96 567.31 SB 461.76 ENV Environmentalor 19 $61.44 $1467.36 EntiIn SENG Associate/Senior En In 101 541.20 161.20 ENG En ineer 52 552.40 52.724.80 SDES Senior Desi ner/CADD Techniclan 7. 534,91 52653.16 DES Desi ner/CADD Technician 542 25 ADM Administrative Principal 1 532 92 $24.20 60% Alex Pulley Sr. Environ. Sclentlst $52.88 20% ITOTAa Sr. Envuon. Scientist $52.40 20% en a ate: Overhead Rata`: 167.85% Fee for Profit Rate*: 12.85% "Enter firms most recent Audited Overhead Rate, and fee for Profit Rate calculated from the NDOR Fired Fee Worksheet (available on the NDOR website). CLASSIFICATIONS": PR = Principal SENG = Associate/Senior Engineer ADM = Administrative PM = Project Manager ENG = Engineer, .�= UeerDerned 1 SENV = Senior Environmental Scientist SDES= Senior Designer/CADD TechnicianUr4trDefied2 ENV = Environmental Scientist DES = DesignerlCADD Technician - - "For User -Defined Classifications, you will need to edit the Classifications Legend located above. To enter anew classification, replace "UDI"with its abbreviation (ex. GRA) and replace "User Defined 1' with the correspond/ng title (ex. Graphic Artist). Once the user-definiffons are added, they will self - populate in the Labor Costs Table, as well as the remaining sheets. Blended Rates Table wu, w � n wgnau must equar 7W16 rot each personnel Classification categotv done person in Classification, list them as 100% for -% Assigned-. Consultant's Fee Proposal for Prelim Design NEPA Services Staffing Plan EXHIBIT "B" UPDATE: May 18, 2012 Page 7 of 10 STAFFING PLAN EMPLOYEE NAME cLASSIFICAnONt & CERTIFICATIONS SALARY RATE %ASSIGNED' Principal Kyle Anderson al Principal 11 $80,77 t00% ana ata:80. Project Manager Matt McFadden Principal 1 $67.31 100% en a ate: Senior Environmental Scientist Amy Ziotsk9 Principal 1 $67.31 60% Alex Pulley Sr. Environ. Sclentlst $52.88 20% Dale Tlschmak Sr. Envuon. Scientist $52.40 20% en a ate: Environmental Scientist Allison Sambol Environ. Scientist IV $43.27 40% _Ton= Baumert Environ. Scientist V 547.12 20% Cann Richardson Environ. Scientist IV $43.75 20% Kody Unstad Environ. Sclentist 11 $28.61 20% Blended Rate: 2 Associate/Senior Engineer Matt McFadden Principal i $67.31 Rick Haden Associate $59.13 20% 20% Dave Lampe Engineer V $50.48 Mark Messinger EngineerV 545.19 ^-- 60% 777� -77777777777777777 en a ate•4ioz.40 Engineer Josh Paiik _ _ Engineer IV $39.42 25% Adam Denney _ Enuingeer II §33,41 76% Dan Barth Engineer 1 $29,81 Laura Knaop Engineer I$27.40 777777777--7- .:. Blended Rht': 3 Senior DesignerlCADD Technician ,9 Brian Moffatt Sr. Designer $42.25 70% Lam Lagsding Sr Designer 542.26 30% an a ate: 2.2 DesignerlCADD Technician Adam Behmer Environmental Scientist II $27.88 Jessica Jurzenski PHD Environmental SGentist III $34.62 30% 30% Megan Omelas GIS Speclailst III $35.10 20% _. Zach Topoloski Graphics Designer 4 $35.75 20% en a ate: Administrative .82 KnssvSWb Admin $22.00 80% _ Stephanie Weiss Admin §34.00 10% Linda Stuchiik Sr. Admin$32.00 10% wended ate: _ 1 ,. 7 7w . , .. ,. i Input actual employee classification as designated by firm. Also enterm any certifications that employee holds. wu, w � n wgnau must equar 7W16 rot each personnel Classification categotv done person in Classification, list them as 100% for -% Assigned-. Consultant's Fee Proposal for Prelim Design NEPA Services Staffing Plan EXHIBIT "B" UPDATE: May 18, 2012 Page 7 of 10 PRELIMINARY DESIGN AND NEPA COMPLIANCE Consultant's Estimate of Hours Project Name: BlairBypass Project Number: _97P -DPS -3854(1) control Number: 22508 Location (City, County): City of Blair, Washington County Firm Name: Felsburg Holt & Ullevig Consultant Project Manager: Mail McFadden PhonelEmail: 402-445-4405 / matt.mctadden@lhueng.com LPA Responsible Charge: Al Schoemaker PhonelEmaih (402)426-0191 / ars@ci,blalr.ne.us NDOR Project Coordinator. Glen Steffensmeler PhonelEmall: 402-4793845 / glen.steffensmeler@nebraska.gov Dale: October 25, 2016 TASKS PR PY SENV PERSONNEL CLASSIFICATIONS" ENV.: SENG ENG SDE9 =DES ADN. Total 110.77 67.31 87.44 41.20: 52.40 31.97 4225 92,92 24.2e For Preliminary Design and NEPA Services: 1. Project Management and Coordination 1.1 Project Management and Coordination 1 4 53 _ r :; 57 Subtotall 4 53 1 87 3. Meetings 3.2 Progress Meetings additional 13 mt s 39 39 _ 78 Subtotal 39 39 78 6. Public Involvement 6.6 investigation and Response to Public Comments 5 20 25 Subtotal 5 2D Y5 8. PreliminaryDesl nIAltemattves Development and Evaluation 8.19 Traffic Volume Data Collection 4 12 16 8.20 Traffic Analysis -^' `.-'. :� 44 52 _ v-' _ 96 8.21 Crash Analysis L4 12 16 Sublotall 52 76 128 9. Environmental Assessment/ NEPA Compliance 9.3 Purpose and Need 4 8 1 30 1 1 1- 4P 9.4 Discussion of Aftematives Considered 8 16 24 9.23 Decision Memo lg 4) 11(6 Subtotal 4 14 42 60 Total Hours 1 4 96 119 101 52 76 3qg Total Days (8 hrs) 1 0.5 12.0 2.4 12.6 8.6 9.6 43.5 Consultant's Fee Proposal for Prelim Design NEPA Services Estimate of Hours EXHIBIT "B" UPDATE: May 18, 2012 Page 8 Of 10 PRELIMINARY DESIGN AND NEPA COMPLIANCE< Direct Expenses Project Name: Bair Bypass Project Number: STP -DPS -3854(1) Control Number; 22508 Location (City, County): City of Blair, Washington County Firm Name: Felsburg Holt & Ullevig Consultant Project Manager: Matt McFadden Phone/Email: 402-446-4405 / mattmcfadden@fhueng.com LPA Responsible Charge: Al Schoemaker Phone/Email: (402)426-41911 ars@ci.biair.ne.us NDOR Project Coordinator: Glen Steffensmeier Phone/Email: 402-479-3845 / glen.steffensmeler@nebraska.gov Date: October 25, 2016 lubconsultanta: quanta : Unit Cost E Amount -77 Subtotal Tinting and Re roduc6on: Quantity Unit Coat Amount 7-4 77 Subtotal Ailea e/Travel: Quantity bUnftCost Amount 3 trips to City of Omaha for FHWA/MAPA monthly meetings 0 30 miles round tdD 390 $0.65 $214.5( x } Subtotal $214.5C od in eats: Quart - 'Unit Cost Amount Ione Subtotal )cher Miscellaneous Costs; Quant( > Unk Coat Amount Aiscellaneous Postage, Mailin Deliveries Eic. 1 V14.69 $114.5 Subtotal $114.59 'OTAL DIRECT EXPENSES $329.09 Consultant's Fee Proposal for Prelim Design NEPA Services Direct Expenses UPDATE: May 18, 2012 EXHIBIT "B" Page 9 of 10 PRELIMINARY DESIGN AND NEPA COMPLIANCE Project Cost Project Name: Blair BypaSS Project Number: STP -DPS -3854(i) Control Number. 22508 Location (City, County): City of Blair, Washington County Firm Name: Felsburg Holt & Ullevig Consultant Project Manager: Matt McFadden Phone/Email: 402-4454405 / matt.mcfadden@fhueng.com LPA Responsible Charge: Al Schoemaker Phone/Email: (402)426-4191/ars@ci.blair.ne.us NDOR Project Coordinator. Glen Steffensmeler Phone/Email: 402479-3845 / glen.steffensmeier@nebraska.gov Date: October 25, 2016 Direct Labor Costs: Amount Subconsultants $17 491.36 Personnel Classification Hours Rate Amount Pdnci al 4 $80.77 $323.08 Project Manager 96 $67.31 $ 6461.76 Senior Environmental Scientist 19 $61.44 $1,167.36 Environmental Scientist 101 $41.20 $4161.20 AssociatelSeniorEngineer 52 $52.40 $2724.80 Engineer 76 $34.91 $2,653A6 Senior Desi ner/CADD Technician $42.25 Dest ner/CADD Technician $32.92 Administrative $24.20 TOTALS 348 $17,491.36 Direct Expenses: Amount Subconsultants $17 491.36 Pdrifing and Reproduction Costs $29359.25 Mileage/Travel Lodging/ Meals $214.50 Other Miscellaneous Costs $114.59 Direct Expenses $329.09 TOTALS $329.09 Total Project Costs: Amount Direct Labor Costs Overhead 167.85% $17 491.36 Total Labor Costs $29359.25 S46,850.61 Fee for Profit 12.85% 6,020.30 Direct Expenses $329.09 PROJECT COST $53,200.00 Consultant's Fee Proposal for Prelim Design NEPA Services Project Cost UPDATE; May 18, 2012 EXHIBIT "B" Page 10 of 10 RESOLUTION NO. 2017-1 PRELIMINARY ENGINEERING SERVICES AGREEMENT SUPPLEMENTAL AGREEMENT NUMBER 1— BK1523 COUNCIL MEMBER STEWART INTRODUCED THE FOLLOWING RESOLUTION: Whereas: City of Blair and Felsburg Holt & Ullevig, have previously executed a Preliminary Design Engineering Services Agreement (BK 1523) for the Blair South Bypass Project for which the Local Public Agency (LPA) would like to obtain Federal Funds; Whereas: City of Blair understands that it must continue to strictly follow all Federal, State and local laws, rules, regulations, policies and guidelines applicable to the funding of this Federal -aid project; and Whereas: City of Blair and Felsburg Holt & Ullevig, wish to enter into a Preliminary engineering services supplemental agreement setting out modifications and/or additional duties and/or services funding responsibilities for the Federal -aid project. Be It Resolved: by the City Council of the City of Blair, Nebraska that: James Realph, Mayor of the City of Blair, Nebraska is hereby authorized to sign the attached Preliminary Design Engineering Services Supplemental Agreement Number 1 between the City of Blair and Felsburg Holt & Ullevig. City of Blair is committed to providing local funds for the project as required by the Project Program Agreement and any Supplemental Project Program Agreements. NDOR Project Number: STP -DPS -3854 NDOR Control Number: 22508 Project Location: Blair South Bypass COUNCIL MEMBER WOLFF MOVED THAT THE RESOLUTION BE ADOPTED AS READ, WHICH SAID MOTION WAS SECONDED BY COUNCIL MEMBER HALL. UPON ROLL CALL, COUNCIL MEMBERS VOTING "AYE" SHEPARD, STEWART, HALL, WILLIS, HANSEN, ANDERSEN, WOLFF AND JENSEN AND COUNCIL MEMBERS NONE VOTING "NAY", THE MAYOR DECLARED THE FOREGOING RESOLUTION PASSED AND ADOPTED THIS 10TH DAY OF JANUARY 2017. CITY OF BLAIR, NEBRASKA BY JAMES REALPH, MAYOR ATTEST: ZM4,A 2� BRENDA R. WHEELER, CITY CLERK (SEAL) STATE OF NEBRASKA ) ):ss: WASHINGTON COUNTY ) BRENDA R. WHEELER, hereby certifies that she is the duly appointed, qualified, and acting City Clerk of the City of Blair, Nebraska, and that the above and foregoing Resolution was passed and adopted at a regular meeting of the Mayor and City Council of said City held on the 10th day of January, 2017. BRENDA R. WHEELER, CITY CLERK