2016-Change Order 1 - Crowell - Thompson ConstructionChange Order No, I Date: December 15, 2016 Project: Crowell Addition — Sanitary Sewer District #74, Storm Sewer District #196, and Water District #51 Owner: The City of Blair, Nebraska 218 South 16u' Street Blair, NE 68008 TD2 Project No.: 994-103.27 Contract Date: September 7, 2016 Contractor: Thompson Construction Inc. 2404 N. Lincoln Ave, Fremont, NE 68025 Description of Changes: Additions: 1.1 Sanitary sewer modification between MH 1 and MH 2, due to conflict In grade with an existing gas main. I LS $ 3,275,00 $ 3,275.00 1.2 Revise grading In order to place 60" RCP In the sediment basin area 1 LS $ 525.00 $ 525.00 17 96" I.D. Flat Top Storm Sewer Manhole, In Place 1.9 V. F. $ 1,150.00 $ 2,185,00 19 Standard Ring and Cover, In Place I EA, $ 900.00 $ 900-00 Total Additions $ 6o885.00 Reductions: 2 8" PVC SDR $5 Sanitary Sewer Pipe w/ Class I Bedding, In Place 48 L,F. $ 30.00 $ 1,440,00 3 6" Solid Wall PVC Sanitary Sewer Pipe w/ Class I Bedding, In Place 6 L.F. $ 30.00 $ 180.00 6 54" I.D. Sanitary Sewer Manhole, In Place 1.5 V.F. $ 365,00 $ 547.50 7 Standard Ring and Cover, In Place 1 EX $ 900-00 $ 900.00 9 Geotextile Fabric, Unstable Trench, If Necessary 100 S.Y. $ 3.00 $ 300.00 10 Crushed Rock, Unstable Trench, If Necessary 100 TON $ 37.00 $ 3,700.00 11 Remove Existing Pavement and Replace w/ 6" Uniform P.C.C. Pavement, In Place 115 S.Y, $ 75.00 $ 8,625.00 14 15" I.D. R.C.P., Class III w/ Bedding, In Place 4.7 L.F. $ 41.00 $ 192.70 21 Video and Acceptance Testing of Storm Sewer Lines I L.S. $ 700.00 $ 700.00 23 6" C900 DR -18 Water Main w/Tracer Wire, In Place 17 L.F. $ 17.00 $ 289.00 30 Permanent Seeding, In Place 1 AC. $ 7,000.00 $ 7,000.00 31 Erosion Control Blanket, In Place 2000 S.Y. $ 1.50 $ 3,000,00 Total Reductions $26,874.20 Change Order No. 1 Crowell Addition – Sanitary Sewer District #74, Storm Sewer District #196, and Water District #51 December 15, 2016 Page 2 Substitution 1.3 Bora and Jack 8" DIP In place of item 11 $ 8,625.00 Net Change In Contract Amount $ (11,364.20) Original Contract Amount $171,800.00 Revised Contract Amount $160,435.80 Reason for Changes: Item 1.1 was needed due to conflict In grade between the sanitary sewer main and an existing gas main. Item 1.2 was needed in order to construct storm sewer In the sediment basin area. Item 1.3 was constructed in place of removing and replacing pavement. Changes in all other Items are based on measurements after construction, the elimination of the planned video Inspection of storm sewers, and the elimination of planned seeding and erosion control blanket Installation. Douglas E. Kellner, P.E. Project Engineer THOMPSON, DREESSEN & DORNER, INC. The undersigned parties to the above -referenced contract hereby agree to the changes as set forth above, THE CITY OF BLAIR, NEBRASKA THOMPSON CONSTRUCTION, INC. MAY _—� TITLE CLERK VXfEST